ML20100H247

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec,Adding Footnote to Section 3.7.D.2, Granting Temporary Relief to Allow Hydrogen Injection Testing
ML20100H247
Person / Time
Site: Pilgrim
Issue date: 04/04/1985
From:
BOSTON EDISON CO.
To:
Shared Package
ML20100H246 List:
References
NUDOCS 8504090074
Download: ML20100H247 (1)


Text

'

p

*

. Valves Valves

1. Whenever primary containment 1. The primary containment integrity is' required, all isolation: valves. surveillance isolation' valves listed in shall be performed as follows:

. Table 3.7.1 and all instrument

.line flow check valves shall a. At least once per operating be operable except as cycle the operable specified in 3.7.D.2. Isolation valves that are power operated shall be.

.} *2. In'the, event any' isolation tested for simulated

-valve specified in Table 3.7.1 automatic initiation and '

becomes inoperable, at least closure times.

one containment isolation

' valve in'each~line.having an b. At least once per quarter:

inoperable valve shall be placed in the. isolated 1. All normally open power condition, operated isolation

. valves.(except for the

3. If Specification 3.7.D.I and main steam line 3.7.D.2 cannot be met, an power-operated isolation

. orderly shutdown shall be valves) shall be fully inttiated~and the reactor' closed and reopened.

-shall be in the Cold Shutdown condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. 2. Trip main steam isolation valves individually and verify-closure time.

.c. At least twice per week the main steam-line power-operated _ isolation valves shall be exercised by partial closure and subsequent reopening.

d. At least once per operating cycle the operability of-the reactor coolant system

. instrument line flow check l valves shall be. verified.

i -

  • Temporary relief from 3.7.D.2 is- '2. Whenever an isolation valve
granted for the' inboard. reactor listed in table 3.7.1 is

< water sample line . isolation valve inoperable, the position of at (AO-220-44), providing-the least one other. valve in each.

outboard, isolation valve line having.an inoperable

-(AO-220-45) .is demonstrated valve shall be recorded daily.

operable weekly. This relief is l In.effect from . until the conclusion of-the hydrogen-g . injection test.

t Amendment No. 160-I

  • p DR DR P_

'