ML20100H156

From kanterella
Jump to navigation Jump to search
Man-Rem Final End of Year Rept for 1995
ML20100H156
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 12/31/1995
From: Duffy J
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BVY-96-10, NUDOCS 9602270136
Download: ML20100H156 (4)


Text

- _

, ;c w

( VERMONT YANKEE NUCLEAR' POWER CORPORATION i

.- Ferry Road, Brattleboro, VT 05301-7002 ENGINEERING OFFICE 560 MAIN STREET BOLToN. M A 01740 (508)779-6711 Febmary 21,1996 BVY 96-10 United States Nuclear Regulatory Commission -

ATTN: Document Control Desk Washington,DC 20555

References:

(a) License No. DPR-28 (Docket No. 50-271)

Subject:

1995 Annual Report of Personnel Exposure As required by Vermont Yankee Technical Specification 6.7.A.2, enclosed please find our annual report of personnel exposure. The enclosures consist of a report entitled " Reg. Guide 1.16 Man-Rem Final End of the Year Report for 1995", and a summary of any special maintenance conducted. This report covers the period beginning January 1,1995 and ending December 31,1995.

Should you have any questions with regard to this information, please contact this office.  :

Sincerely,  !

VERMONT YANKEE NUCLEAR POWER CORPOPATION

- f?Z6)

James J. Duffy V i Licensing Engineer i l

c: USNRC Region 1 Administrator USNRC Resident inspector- V'fNPS

- USNRC Project Manager- VYNPS l

vw w.

9602270136 951231 I PDR ADOCK 05000271 R PDR

.; ; e

f. VJrmont Yank 3e Nuctsar Power Carp. '

l REG. GUIDE 1.16 MAN-REM FINAL END OF THE YEAR REPORT FOR 1995 NLMBER OF PERSONNEL OVER 100 MREM TOTAL MAN-kEM STATION UTILITY CONTRACT WORKERS STATION UTILITY CONTRACT WORKERS EMPLOYEES EMPLOYEES AND OTHERS EMPLOYEES EMPLOYEES AND OTHERS REACTOR OPERATIONS & SURVEILLANCE MAINTENANCE 22 0 65 4.923 0.000 23.567 l OPERATIONS 25 0 1 7.412 0.000 0.394  ;

f '

HEALTH PHYSICS 12 0 19 4.422 0.000 5.414 I

. SUPERVISORY 0 0 0 0.090 0.000 0.011 ENGINEERING 0 0 0 0.186 0.000 0.000 OTHER 0 0 0 0.201 0.000 0.041  ?

a SECURITY 0 0 0 0.072 0.000 0.039 6

ROUTINE MAINTENANCE

MAINTENANCE 20 0 229 6.944 0.000 84.034
C?ERATIONS 2 0 0 1.479 0.000 0.027
  • HEALTH PHYSICS 8 0 40 3.633 0.000 12.069

{

, SUPERVISORY 2 0 0 0.482 0.000 0.081 i E%GINEERING 0 0 1 0.065 0.000 0.156 l

OTHER 3 0 0 0.686 0.000 0.080 ,

, SECURITY 0 0 0 0.014 0.000 0.010

' 1% SERVICE INSPECTION MAixTENANCE O 0 54 0.072 0.000 22.257 i d

OPERATIONS 0 0 0 0.015 0.000 0.002 l HEALTH PHYSICS 0 0 2 0.061 0.000 0.790 SUPERVISORY 0 0 0 0.000 0.000 0.009 J ENGINEERING 0 0 0 0.010 0.000 0.000 ,

, OTHER 0 0 0 0.000 0.000 0.000 l SECU21TY 0 0 0 0.000 0.000 0.000 i l

SPECIAL MAINTENANCE I d

MAINTENANCE O 0 0 0.000 0.000 0.353  ;

OPERATIONS 0 0 0 0.000 0.000 0.000  !

HEALTH PHYSICS 0 0 0 0.000 0.000 0.000  ?

SUPERVISORY 0 0 0 0.000 0.000 0.000 ,

ENGINEERING 0 0 0 0.000 0.000 0.000 l

OTHER 0 0 0 0.000 0.000 0.000

. SE CURITY 0 0 0 0.000 0.000 0.000

. W',STE PROCESSING MAINTENANCE D 0 0 0.237 0.000 0.395 C?ERATIONS 0 0 0 0.007 0.000 0.000 HEALTH PHYSICS 0 0 1 0.107 0.000 0.287 SUPERVISORY 0 0 0 0.002 0.000. 0.000 E:GINEERING 0 0 0 0.000 0.000 0.000 OTHER 0 0 0 0.000 0.000 0.000 SECL21TY 0 0 0 0.000 0.000 0.000 ,

i REFUELIRG  ;

MAINTENANCE O 0 0 0.089 _ 0.000 0.279 1 0FERATIONS 0 0 0 0.157 0.000 0.004 l HEALTH PHYSICS 0 0 0 0.000 0.000 0.002 )

SUPERVISORY 0 0 0 0.000 0.000 0.000  ;

ENGINEERING 0 0 0 0.006 0.000 0.000 l OTHER 0 0 0 0.000 0.000 0.000 SECURITY 0 0 0 0.000 0.000 'O.000 I l

l

, . .. . . . . . . . . . - - . . .. . . . - . . . . - ~ -- - - .

,. r -e'

, e, {

,.. ; 9 TALS- 'l

- MAINTENANCE'  : 42 0 348 12.265 ~ 0.000 .

130.885  !

< = OPERATIONS ' 27 0- 1 9.070 0.000 - 0.427 - .i

HEALTH PHYSICS . 20 0 62 . 8.222 0.000 18.561 l SUPERVISORY- 2 0 0- 0.574 0.000 0.102 4-ENGINEERING 0 0 '1 0.266 0.000 0.156 OTHER 3 0 0 .0.887 0.000- 0.121 j SECURITY 0 0 0 0.086 0.000 'O.049 {

l

~ i GRAND _ TOTAL. , 94 0 412 31.370 0.000 150.301 .!'

4 Apprevedt>y'i --- - - -- --

5 YN'  !

.Rediation Protection Manager Date 4

i 1-2 t

t d

I i

a

+

i e i l

l d

d- I l

l c

t l

I

i d

5 1

o'

,4 Special Maintenance Dose:

The 0.353 rem in the special maintenance category was j accumulated during the low pressure turbine casing replacement project performed during our scheduled refueling outage.

f i

4 1

a i

i l