ML20100H236

From kanterella
Jump to navigation Jump to search
Public Version of Emergency Plan Implementing Procedures, Including Rev 29 to Index,Rev 7 to EP-102 Re Unusual Event Response,Rev 1 to EP-211 Re Field Survey Group & Rev 5 to EP-291 Re Staffing augmentation.W/850401 Release Memo
ML20100H236
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 02/25/1985
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20100H221 List:
References
PROC-850225-01, NUDOCS 8504090072
Download: ML20100H236 (41)


Text

{{#Wiki_filter:~

c. ~ , a. m .. .

Page 1 of 5 j 3852051690 Revision 29 02/25/85 LIMERICK GENERATING STATION t ,y EMERGENCY PLAN PROCEDURE INDEX i 1 PROCEDURE REV. DATE SIGNED DATE OF LAST { NUMBER NO. TITLE BY SUPER. PERIODIC REVIEW P-101 3 Classification of

h. Emergencies 12/12/84 1

) EP-102 7 Unusual Event Response 02/25/85 EP-103 7 Alert Response 02/04/85 t EP-104 7 Site Emergency Response 02/04/85 EP-105 7 General Emergency Response 02/04/85 EP-106 3 Written Summary Notification 01/28/85

EP-110 5 Personnel Assemoly and l l Accountability 02/04/85 EP-120 2 Site Emergency Coordinator 12/12/84

!i EP-201 3 Technical Support Center 6 01/28/85 (TSC) Activation l EP-202 3 Operations Support Center ( cP-203 (OSC) Activation 12/12/84 4 Emergency Operations Facility (EOF) Activation 01/28/85 EP-208 4 Security Team 12/12/84 a EP-210 3 Dose Assessment Team 12/12/84 EP-211 1 Field Survey Groue a.__ 02/20/85 I EP-220 CANCELLED

  • W
                                                                                     .                      lfh NN$$           E Q8heessu(,$

1 TP-221 CANCELLED s. 1 f

   ;           EP-222                      CANCELLED                                                 d   Y li              EP-230               4      Chemistry Sampling and                            QI C /

Analysis Team i n ,m Y/12h84 EP-231 6 Operation of Post- t r

                                                                                        ') ggp g q i                                          Accident Sampling S (PASS) bdb 4,jk!01,[:, ,    .      a IL  ;

1 EP-232 CANCELLED W j 8504090072 850315 1 DR ADOCK 05000352 4 PDR

                   . . ,       y        --e.  . - - .      .wm--   --
             . . _ . .                _.                                                                          e  c.1. u -.

t '- l Paga 2 of 5 j '

                                                                                  .                Revision 29
                              ,                                              .                        02/25/85 1
   'i1                  '

LIMERICK GENERATING STATION j EMERGENCY PLAN PROCEDURE INDEX

   ,b i          l

[' PROCEDURE REV. DATE SIGNED DATE OF LAST NUMBER NO. TITLE BY SUPER. PERIODIC REVIEW EP-233 4 Retrieving and Changing Sample Filters and l Cartridges from the l Containment Leak Detector

During Emergencies 12/12/84 f EP-234 4 Obtaining Containment -

[ Gas Samples from the Containment Leak Detector During Emergencies 12/12/84 j EP-235 4 Obtaining Reactor Water

,                                                    Samples from Sample
*f..

Sinks Following Accident Conditions 12/12/84 [ EP-236 4 Obtaining Cooling Tower-i* Blowdown Line Water Samples Following h ' Radioactive' Liquid-Release after Accident ly - Conditions 12/12/84

  )'                        EP-237               5   Obtaining the Iodine /

Particulate and/or Gas Samoles from the North

 ,                                                   Vent Wide Range Gas                            -

{ Monitor (WRGM) 01/11/85

          ;                 EP-238               4   Obtaining Liquid Radwaste Samples from Radwaste Sample Sink Following Accident Conditions                   12/12/84 f                            EP-240                   CANCELLED EP-241               7   Sample Preparation and Handling of Highly Radioactive Liquid j

Samples 02/04/85 h EP-242 4 Sample Preparation and j Handling of Highly i Radioactive Particulate j Filters and Iodine Cartridges 12/12/84

    ^

EP-243 5 Sample Preparation and 1 Handling of Highly y Radioactive Gas i Samples 12/12/84 d EP-244 2 Offsite Analysis of High Activity Samples 01/22/85 i A 1.3 'l 1 ,

     .~._ ,. ,. ., ., .. , . .~ . >       -                            ,
            *      .'                                                           Page 3 of 5 Revision 29
       ,                                                                             02/25/85 LIMERICK GENERATING STATION

( EMERGENCY PLAN PROCEDURE INDEX

  ?               PROCEDURE     REV.                                    DATE SIGNED DATE OF LAST I
               ' NUMBER         NO. TITLE                           BY SUPER.      PERIODIC REVIEW
   ;              EP-250         2      Personnel Safety Team           12/12/84 1

EP-251 2 Plant Survey Group 12/12/84 EP-252 4 Search and Rescue /First Aid Group 02/11/85 ij .EP-253 0 Personnel Dosimetry, j_ Bioassay, and ,

   ;                                    Respiratory Protection J.                                    Group                           12/12/84                               _

1 EP-254 3 Vehicle and Evacuee Control Group 02/04/85

.]

EP-255 2 Vehicle Decontamination 12/12/84 f .EP-260 2 Fire and Damage j Control Team 12/12/84 l EP-261 2 Damage Repair Group 12/12/84 EP-272 4 Philadelphia Electric j(J Company Officials l~ Phone List' 02/04/85 i EP-273 4 Limerick Station l Supervision Call List 02/11/85

  • j EP-275 CANCELLED F EP-276 5 Fire and Damage
   ;                                    Team Phone List                 01/24/85 EP-277           6      Personnel Safety Team Phone List                 02/11/85 Il               EP-278           4   _ Security Team Phone                                          .

1- List 01/28/85 EP-279 4 Emergency operations

Facility (EOF) Group E Phone List 01/22/85 EP-280 5 Technical Support Center Phone List 01/22/85 EP-282 4 Government and Emergency Management Agencies Phone List 01/22/85 EP-284 4 Company Consultants and Contractors Phone List 01/22/85 0 EP-287 3 Nearby Public and ii Industrial Users of 1 Downstream Water 02/11/85
(-

1 L l' ls.: -

                                                                                          .a...+. . a         ..,w    ,   .b,,-   : Janabi h Page 42cf 5 3                                                                                                           Revision 29 r

02/25/85 T l ' LIMERICK GENERATING STATION } EMERGENCY PLAN PROCEDURE INDEX j PROCEDURE REV. DATE SIGNED DATE OF LAST NUMBER NO. TITLE BY SUPER. PERIODIC REVIEW l EP-291 5 Staffing Augmentation 02/25/85 i EP-292 6 Chemistry Sampling and { Analysis Team Phone j List 01/22/85 t EP-294 5 Dose Assessment Team l Phone List 02/04/85

 !                     cP-301                1         Operating the Evacuation Alarm and-River Warning

!, - System 12/12/84 l

EP-303 3 Local Evacuation 12/12/84 i

j EP-304 3 Partial Plant Evacuation 12/12/84

                                                                                        .                             -~

EP-305 4 Site Evacuation 02/11/85 EP-306 1 Evacuation of the - Information Center 12/12/84 '- EP-307 . 2 Reception and Orientation of Sucoort Personnel 12'12/84 ' 3 EP-312 3 Radioactive Liquid Release 02/25/85 . ! . EP-313 2 Distribution of Thyroid - l Blocking Tablets 12/12/84 i EP-314 0 Emergency Radiation ) Exposure Guidelines

;                                                      and Controls                                 12/06/84 EP-315                 3         Calculation of Offsite

[ Doses During a (Potential)

Radiological Emergency .

Using RMMS in the , Manual Mode 02/04/85 EP-316 2 Cumulative Population and Near Real-Time

Emergency Dose --

Calculations for i Airborne Releases , Manual Method 12/13/84

.                    EP-317.                 2         Determination of Protective Action Recommendations                              12/12/84 EP-318                  1         Liquid Release Dose Calculations Method for Drinking Water                               12/12/84

( m - e. y eeeW.=ee.--+-e- 6s. ww = m que se** *

                                                   ._ . u .           . . .        :. a_              .    .                      -....         ... _ u. _ c...a. . , _ .. u . ._ __ .. ,...

Page 5 of 5

                   .                                                                                                                                      Revision 29
    +

02/25/85

-3 -.
 'i         .

LIMERICK GENERATING STATION [; k EMERGENCY PLAN PROCEDURE INDEX e

   ;              PROCEDURE REV.                                                                                                   DATE SIGNED DATE OF LAST
                                                                                                                                                                                        ~~~
   ,              NUMBER                 NO.            TITLE                                                                      BY SUPER.                       PERIODIC REVIEW j                EP-319                    1           Fish Ingestion Pathway j                                                      Dose Calculation-                                                          12/12/84 j                EP-325                     2          Use of Containment
Dose Rates to Estimate Release Source Term 12/12/84
   ;              EP-330                    3           Emergency Response
 ,i                                                     Facility Habitability                                                      12/12/84

[; EP-401 2 Entry for Emergency Repair and Operations 12/12/84 i EP-410 2 Recovery Phase Implementation 12/12/84 EP-500 2 Review and Revision of Emercency Plan 12/12/84 ( - t

  • t b4 h-th

(

          \
                                                                                                                          .                 - -       m    +
                       -v4-------m-.     , =.--etm      ,y- am 5-           4g. y   y-y   - , - , - -g- -m*-   ----,-er,   aye ye,,.,c--e-       9 9w%%-       +9e-  eryy. , -y- .-g       my--.-py y-
                                                                                                                      ~
             ,l                                                                                  EP-102, Rev. 7
                                                                                                        ^

3852051700 "^'JdGIg* 1 PHILADELPHIA ELECTRIC COMPANY ^~( LIMERICK GENERATING STATION ~ EMERGENCY PLAN IMPLEMENTING PROCEDURE i e i 1 1 EP-102 UNUSUAL EVENT RESPONSE 1.0 PARTICIPANTS l f 1.1 Shift Superintendent or designated alternate shall assume the role of Emergency Director and implement this procedure, until relieved. r 1.2 Station Suoerintendent or designated alternate shall relieve the Emergency Director, assume the role of Emergency Director, and continue implementing this

 !                                 procedure, if necessary.                                                         .

1 2.0 ACTIONS-IMMEDIATE

2.1~ Emercency Director shall

l . 2.1.1 Verify the emergency classification as determined in ( EP-101, Classification of Emergencies unless determination has just been made. 2.1.2 Complete Appendix EP-102-1, Unusual -Event Notification Message. Direct a communicator to complete notification of the appropriate parties in Appendix EP-102-3 g' t hone List within 15 minutes. * [j 2.1.3 Direct the evacuat;.o  %?f b / W J h la necessary. Refer to the 2 proc .e: EP-303 Local Evacuation ga,, JI g a 2.1.4 Contact the Stad $N p endent, if necessary, l - and the Shift Te j 1 odjf.*In( pr $ em of the j e situation. kijkj( J ! 2.1.5 For samples, contact the Shift Chemistry Technician, j If necessary, implement EP-230, Chemistry Sampling } and Analysis Team. t 2.1.6 For in-plant surveys, or contaminated injury, contact a Shift HP Tecnnician. If necessary, implement EP-250,~ Personnel Safety T,pa.. ,f e

                                                                 . - -    71'h 'l 4
                                                                                 - , n :.h       ,?.

3 g f r [gy; yy . Gd

                                                                . 6        "
                                                                           '3 CM        "

hbi 4

                 ,     -                           o       .m -
                                                                                                                            .~..a _ u .a . ;-
                                                                                  - .       : _ -: .             ~
       ,   ,l,                                                                                          EP-102, Rev. 7 Page 2 of 8 VAW/ MPG /rgs m

ff K L 2.1.7 For fire /damace recair, contact the Maintenance Shift Assistance Foreman. If necessary, to [ implement EP-260, Fire and Damage Team and/or EP-261, Damage Repair Group. 2.1.8 For a liquid release, implement EP-312, Radioactive Liquid Release, if required. [ 2.1.9 For security matters, implement EP-208, Security Team, if required. ) 2.1.10 Fog airborne releases, contact Shift Technical Q Advisor. If necessary, implement EP-210, Dose Assessment Team. } k V i 3.0 ACTIONS-FOLLOW-UP li j 3.1 Emergency Director shall: 3.1.1 Periodically reevaluate the event classification in accordance with EP-101, Classification of fy Emergencies, and escalate or de-escalate the classification, as necessary.

]     f               3.1.2      If classification is de-escalated fill out-Appendix S     \                          EP-102-2, Unusual Event De-Escalation Message and 1                                 give it.to the communicator and direct the
  !                              communicator to perform notification of the j-                               appropriate parties list,ed in Appendix EP-102-3, l

Unusual Event Phone List. 3.1.3 Obtain the following information as necessary to formulate further actions:

;j                          A. Sample analysis from Shift Chemistry Technician or 1                                Chemistry Sampling and Analysis Team Leader.

}- .

  !                         B. In-plant surveys or status of contaminated injury
  }                              from Shift EP Technician or Personnel Safety Team j                               Leader.
]

i C. Fire / Damage Repair status from the Maintenance jl Shift Assistant Foreman or Fire and Damage Team li Leader. 1 l' D. Airborne releases calculation results from Shift Technical Advisor or Dose Assessment Team Leader. l E. Notification Results from Communicator. ( e

                                                  ; _- -            -, _ .,   , , . _ . .     . - - . -   _ , . . - . - . ,              ,z-,- . _ _

c .;w==----.------z=---=.:.. . .a ; . . . - .- . - . ~ - . . . - - - -

               ' l,                                                                                                    EP-102, Rav. 7 Pege 3 of 8 VAW/ MPG /rgs  .

itp I 3.1.4 Determine which support personnel are necessary !! for emergency functions and direct the Shift ll Clerk to contact those personnel. If Shift Clerk 4 is not available, this function shall be assigned H to an available individual. pi i 3.2 Ccmmunicator shall: A d 3.2.1 Inform Emergency Director when appropriate b i notifications have been made and submit completed j copy of Appendix EP-102-3, Unusual Event Phone j i, List, for Emergency Director's Signature. l} L' L t 4.0 APPENDICES H~ q 4.1 EP-102-1 Unusual Event Notification Message Li 1 4.2 EP-102-2 Unusual Event De-Escalation .5essage l1. i 1 h, 4.3 EP-102-3 Unusual Event Phone List l f:

} - 5.0 SUPPORTING INFORMATION 5.1 Purcose The purpose of this procedure is to' provide
  ,                                                      guidelines for site response to an Unusual Event.

n 5.2 Criteria for Use 5.2.1 This procedure shall be implemented when an event h[ has been classified as an Unusual Event per EP-H 101, Classification of Emergencies, and EP-101 J- has been completed. 5.3 Soecial Equiement None

                                                                                                                                ~~
             - . -  -.2..>..      --      .-..-.a...       .- , .- : .: . . . : = 2    ,-~=-~.s.          - - . -. ~a..x-

[ -* l, EP-102, Rev. 7 j! . Page 4 of 8 0 VAW/ MPG / cgs [g 5.4 References it - r 5.4.1 Limerick Generating Station Emergency Plan 1 5.4.2 NUREG-0654, Criteria For Preparation and Evaluation Rev. 1 of Radiological Emergency Response Plans and Preparedness in Support of , Nuclear Power Plants. I-e 5.4.3 EP-303 Local Evacuation e 5.4.4 EP-101 Classification of Emergencies 5.4.5 EP-210 Dose Assessment Team 4P 5.4.6 EP-230 Chemistry Sampling and Analysis Team 5.4.7 EP-250 Personnel Safety Team 5.4.8 EP-260 Fire and Damage Team L e 5.4.9 EP-261 Damage Repair Group 5.4.10 EP-312 Radioactive Liquid Release 5.4.11 EP-208 Security Team C

    ~

i i k i r l 6 6 i

 .A-
        ?8W                  h
                                                                                                      .w..m.       .-.- .   ,,

I g ii - EP-102, Rav, 7

                                                               ,                                                    Paga 5 cf 8 f-                                                   ,                                                           VAW/ MPG /rgs

):-. 9- [ ' APPENDIX EP-102-1

      .(

I UNUSUAL EVENT NOTIFICATION MESSAGE N r MESSAGE: This (is)(is not) a drill. This (is)(is not) a r l-drill. This is the Limerick Generating Station calling to report an s f Unusual Event. My name is , telephone

                                         . Limerick Generating Station is reporting an Unusual Event declared at Unit No.                                        . Time and date of l
.                Unu.s._ual .Ev.e.nt classification are
  \                                          ~.

(24 Hr Clock T me), (Date) (. The basic problem is '\ . I There (has been) (has not been)'an (airb6rne) (liquid)" l

!                radioacrive release from the plant.                       The plant starus is (stable)
,                (improving) (degrading) (not known).                        There is no protective acrion r                recommended.           This (is) (is not) a drill.                        This (is) (is not) a
                                                                                             - - " ~ ~ ~ ~ ~ ~                 ~ ~ ~ ~ ~ ~
                                                                    - - - - - - * ~ -

l drill. - t i 1 ( ( 9

_ . . ,e--..- , , ,._.m. - - , _ . _ _ _ .:..-_..:.

                                                                                                      ...z .. a _ z. _ w.             u .w      .-
                                                                                                                                                     .. ._m . c:2.i.aaaerm_ l

.j,

            .5:      'r                                                                                                                       EP-102, Rev. 7
                                                                                                  .                                              Page 6- of 8 g                    -'
                                                                                    .                                                            VAW/ MPG /rgs k                                                                                                                                                                                      l
           '/                                                                           APPENDIX EP-102-2                                                                               I t .
  $' (                                                                UNUSUAL-EVENT DE-ESCALATION MESSAGE 3

MESSAGE:. This (is) (is not) a drill. This (is) (is not) a 1 4 c drill. This is Limerick Generating Station calling to de-escalate y an Unusual Event. Please connect me with the appropriate authority. $ This is Limerick Generating Station calling to report the

 ,)

4 j ' termination of an Unusual Event. My name is . i

 '4
 ;                        Time and date are                                                                        .       This (is) (is not) a drill.

4 J This (is) (is not) a drill. ( 3 - 4 i i t i 4 k

 }

1 I 4

 't

( t

        ..,e-                           p      * * *
                               +r                       -v+=        we.                                       - * - * " * * * * * * * "                        "'
                                                                                                                                                                                'P'   *
     %g+,p      , .-                              -          - t, Pa<a**, = * * * = +                                                           [ '(( * }4 !" "

p

, g(

t - c. '  ?

. ~
..- : .;

? .t C l l l 7"' C g 'Q -i

                                                                                                                                                                              +                            l
c. ' '.

{\ ' f,

                                                                                                                                        ,     F"
              ~

(; 1 c '

  • g h, -

, + ci .- . 1 C I l C u gjg 1

  • l ^

C 4 7j l N l -

                                                                                                                                                                                                               \

E , i \ s c C T

- \
                                                              \

mJ _ l r L  ? C.T  ? mC L 1 I = F C- u O

                       "s'- . ;..                                                                                                                                                                                        l N
                                                .'GLi G E                                                                                                                                                                    (

f 7.' -

5 c l F _.

I CA cg [ <~4 C 6 i ( t'. ._ I i ' C c c , O ,I C ,  ;

                                                                                               ..C, a .-          c ._C                                                        i                    E'
t. - -

1 E' Eu u E .- I C* Cu u C' l CC C C t l l CC I t  ; l l ' u I

                                                                                                       ,                                                         f      a I                                                     -
                                                                                                       )                                                         l .                                       h O                                                                                                                                                     ,             ;

t - o , c

                                                                                                               ,~                                                ;     c                                   !

I i '-' - t l c l CI i .

                                                                                                             '~ .            l              f4                   I w

c j l C  : \ j c k = l l , nl ciC l E  : :

                                                                                                                                                                 ,                                         l l

l q1 C. I ." q

                                                                                                                             )

T

                                                                                                                                 'c t;f r*

L -- l i

                                        ;           -I          -                                                       c.                         u             i     -

c l "

                                                                                                                                ,E C                             i .'                                      i
                                                    'c'         E E6 -L                              c _' c                                                   .

f' c  : y - c, - i u [ ~- j "~s? c 2, 3 ( s g _ L' L r

                                                     ;           c.1                   ,.
                                                                                                "                  ' ~
c. > \ -:. t
                                                                                                                                     -jC                                     r                             .
                                      -              :           : u                   it        ; i c                 r        --. i e          t..                                            "                                   '. C w                    e-
                                  ~

d c e [,

                                                                                                 '~

l - - j F-

                                                                                                                                                   > c:          f i
                                                                                                                                                                             ~c
                                    '               c            Ca           r .                      i                              E,                         '

w i

                                  '~

N C I c c { ky, M d; 7- - r, . . _ - t  ; -

                                                                 - .          u .                      ,

i

                                                                                                                   = :-
                                                                                                                  ,k    s        -- q              c        -    j     c; 0,         -L            c, ;             ,

C C- ~ c. c.

                                                                                                             ; - ;-                   ")
                                  '.*                            c                               p'    i                                                               C C E,                       ._

C ~; 6  ! f

                                                     ~,
                                                     '          ,t.
                                                                ~ -
                                                                      ,*     ~ .
                                                                              <~.,;

C l s .[u. .~' . , l ; _

                                                                                                                                                                       ~
                                                     -,                                                t 7

( l ( , h-If e, I I , l i 1

  • j t

i l ,

                                   -5               -I                                         -- l l           __                           i                                                                                                       -

f \< f N -

       =                e

1lj j m . - , .- , t.

   '                                           l                                                                                                                                                                                                 I:P- 10 ? , P r. t r . 7 Page .'! cf l'
   ,                                                                                                                                                                                                                                                            VAU/f1PC/rg, t:

4:' APPI f!Di:' UP-103 '? - IlfillSII A T. I:V :I!'" PIIO!!E T. T C"' 'e Timo-Ipitlatec! - Phonc !!nmbe r ^ i circle tinmher' IInes!) . Per nnnel/Ar]ency To fle !!nt i f i er' Time Pernon nonponi'intf ! g. Director - Emergency  !!ome Prepares 1necs Office { if nobe r t a !!an':nn l '; Alternc.to  !!one ,

                                                               . Terry Ph111ahnnm                             office                                                                                                                                                      .

or llome ' !- Victoria ??arren. Office l- h.  !!Pr Operationn center .  ; I:e tI:n ne'n , tid

                                                                                     ~

8Cs,e,... L y P (Pernon contacting !!nr nunt he ift% *.g .. ,.: [

   ,                                                                                                                                                                                                                           s. . . ,, .                                        4
. I.icenne
1 Opera tor) 9 (,'n~ : .:.:...a i y

!! LE..*:,.: . . .:. c. N a Q *s;y; y! b f.'; U "h 'c nw- if e i,. , . e p", Ageneinn to !'c con t act cel after '-3403  ; t! e c:.ove pernonnel/agencien Iave j'Am , , s Seen not i fe ' j ..! L'~- t f i. Cert:n "nunty Emergen*cy 4 . ..a . gr. ., . mnnt 7. e n c .- _ + \ h ..r.y j- 4 r'.e nt er ec.un t.y Energency { l' - E 2.dd i Cervicen \ t l I

                                    \

romplete.1 Cy:

                                                                                                                                                                                               }         p '-        '

4A

                                                                                                                                                                                                       .Q               ;rWd
                                                                 ~             .

Vo r i f I c r' Ily : I::1CRCCrirY DTDECTOR

                                                                                                                                                        *y-                                                                .
                                                      . = . m w . .m a . w
                                                                                                                                             ~~

_ . - .. - . . . - . = . -

                 ),               -

EP-211, Rev. 1

       -                                                                     38.52051710                                      P^9* 1 of    6 R   nip PHILADELPHIA ELECTRIC COMPANY f(.

i LIMERICK GENERATING STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE i I i j EP-211 FIELD SURVEY GROUP 1 l.0 PARTICIPANTS lJ 1.1 Field Survey Group Leader shall direct the actions of the Field Survey Group members. i j 1.2 Field Survey Group Members shall conduct field i surveys and onsite (out-of plant) surveys. I j 2.0 ACTIONS - IMMEDIATE 1 q 2.1 Field Survey Grouc Leader (FSGL) shall: L J 2.1.1 Report to the Technical Support Center (TSC).

 ]                                  2.1.2              - Discuss the situation with the Dose Assessment Team Leader. This discussion should include:                                 the i (-                                                   potential for release, the magnitude of the radioactive source term, meteorological conditions j,

and potential for change, and the number of field survey squads needed. - g 2.1.3 Coordinate the l l 5e su number of 1 field survey sq g U(1 th d by the Operations Supp .. te tu consists j of a Health Physics Tec an anc a E . er. 2.1.4 Obtain drivers and veh 5 the Fire and Damace l Team Leader and have t hr to the TSC. t 2.1.6 Instruct the H.P. Technicians to secure and I inventory the required number of field survey kits and radios, and perform equipment checks. The radios are located in the Dose Assessment Room in 3 the Technical Support Center and the field survey j kits are located in the storage closets in the Personnel Entry Area of the Technical p ort

Center. ,

gp vf (. g,' m ry 9 m 3.9;m n., -

s. 7' c4.'

o

a. w,;..e q 7 '~,
                                                                                .I'S '; u-u .. .

q't. ., .3

                                                                   ,, ; ;j1

[ 8

                                                                                                         ;c
                                                                                                         .J ,h. :)ij }b     }C g} c; '.; ' N . aw-
 !                                                                                                  j
                                                                                                    ~

p gnv 3 1 ,

    ..,..   . . . , . . _ . .        -,m   - , + .
                                                       ,q      . n,... c+r-

7 .~

 ?
        .<.-~.+-w.        a.. w.w.                 - :-  -    -    ---                                     -
                                                                                          ~
      .*'l<                                                                EP-211, Rev. 1
)l                                                        .                  Page 2 of 16

{- 1 REL/ nip 2.1.7 Discuss the situation with each squad, assign each (. squad a unique color designation, and direct them to

;,                                specific initial 1ccations.

l IF THE FIRST SURVEY POINT IS AN ONSITE LOCATION,

;         I                       INFORM THE SQUAD (S) MEMBERS OF ADDITIONAL i         l                       PRECAUTIONS ASSOCIATED WITH THE POTENTIALLY ELEVATED l         l                       RADIATION LEVELS.

f [ METEOROLOGIGAL CONDITIONS, EXPECTED RADIATION j LEVELS, AND OTHER EAZARDS SHALL BE USED TO DETERMINE I THE POSITIONING OF' FIELD SURVEY GROUPS.

                     .2.1.8       Notify Security Team Leader of the names of field f                                  survey squad members so that they will not be
 ;                                detained upon leaving the site.

} ] 2.2 Field Survey Squad' Members shall: l lt 2.2.1 Report to the Field Survey Group Leader (FSGL) at i the Technical Support Center or the Personnel Safety Team Leader after the EOF has ;- been activated. l -- W ._

!                     2.2.2       Obtain a field survey kit and a radio.

j , l 2.2.3 Break the seal on the field survey kit and check j equipment for operability including source check of E ( survey equipment. Document equipment checks on EP-211-2. [ IF THE SEAL ON THE FIELD SURVEY KIT WAS ALREADY BROKEN, PERFORM AN INVENTORY OF THE KIT CONTENTS.

j. 2.2.4 Obtain emergency dosimetry (0-1500 mR and 0-5 a i

Direct Reading Dosimeters (DRDs). Ensure that DRDs are zerced crior to leaving the TSC. 2.2.5 Obtain information from the FSGL on the situation, - plan of action, specific survey locations, and necessary precautions. ISSUANCE OF A 0-5 R DRD IS NOT TO BE INTERPRETED AS AN AUTHORIZATION TO EXCEED STATION ADMINISTRATIVE j GUIDELINES. j 2.2.6 Upon leaving the TSC keep all dosimetry. l-2.2.7 Ensure that the E-520/HP-270 or equivalent is on and operating prior to leaving the TSC. 2.2.8 Perform communication check of radios with the FSGL at the survey vehicle. (

    .y             ,                  . - - . --..

[]'((T}. f "5

                                               ~'

[~*'TS] $^

    - - am-_. i    ,  ,  _ _    _    . _-   ,_
           .- g P-211, Rcv. 1 0                                        -

Page 3 of 16 1' . REL/ nip 4 L 2.2.9 Proceed to the first survey point as directed by the [ FSGL. 4 3.0 ACTIONS - FOLLOW-UP u ! 3.1 Field Survey Grouo leader shall: e 3 1.1 Maintain communication with and direct the activities of the field survey squads. Ensure that + the location of each squad on the Field Survey I display map is updated as necessary. t i 3.1.2 Obtain field survey results as provided by field , survey squads and record results on EP-211-5, Field [ Survey Group Leader Data Record. f 3.1.3 Provide the field survey squads with status updates including: radiological and meteorological conditions, etc. 3.1.4 Dispatch the field survey squads to additional survey locations as necessary. t 3.1.5 Field Survey Group Exposure Record, Appendix EP-211- ." ((. 3, shall be completed as directed by the Field Survey Group Leader. V 3.1.6 If the field survey squad members and/or vehicles h* 1 become contaminated inform the Personnel Safety Team Leader. i U 3.1.7 When advised that the EOF has taken over the Dose Assessment function, inform the field survey squads. Perform a formal turnover with the EOF Field Survey Group Leader and report to the Dose Assessment Team Leader. I j 3.2 Field Survey Scuad Members shall: t i l If an onsite.(out-of-plant) survey is required, take

                 - - - - =

j ._.- j - - an

                                       ~' air sample using a Lapel Air Sampler in
;                                     accordance with the appropriate steps of HP-428, j-                                     Operation of the Gilian Model HFS ll3AUT Lapel Air j                                      Sampler, transport the air sampler assembly to the

] counting room on Elevation 217 of the Radwaste .; Enclosure to.be analyzed, and proceed with the remainder of this procedure.

3.2.1 While in transit, ensure that the E-520/HP-270 or
?                                     equivalent is on and switched to the lowest
-(

I\ appropriate scale. Hold the probe outside the vehicle and have the driver proceed until the r l s a z,;,L_ == ==-- .

j, EP-211, R$v. 1 Paga 4 of 16

 .                                                                                             REL/ nip specified survey location is reached. Continuously monitor the survey instrument while in transit.

( 3.2.2 When survey location is reached, pull off the road and turn on emergency flashers. Exit vehicle and determine the maximum dose rate at waist height in a 360 degree radius using the E-520/HP-270 or equivalent. Take readings with the probe shielded and unshielded. If the unshielded reading is greater than two times the shielded reading, assume that you are immersed in the plume (as opposed to seeing the effects of skyshine). 3.2.3 Record all results on EP-211-2, Field Survey Group Survey Record, and transmit information to the FSGL oy radio. If the radio does not function properly, locat a telechone and recort survey information. Call the Fiel

                                              'TSC) or M EOF) ey Group Leader.

and ask for i 3.2.4 Take air sample at the " field" survey locations if directed.by the FSGL as follows: l CAUTION j l ENSURE THAT THE ON/OFF SWITCH IS OFF PRIOR TO l (. l CONNECTING THE AIR SAMPLER TO THE VEHICLE BATTERY.I l CONNECT RED LEAD TO THE POSITIVE BATTERY TERMINAL l lAND BLACK LEAD TO NEGATIVE BATTERY TERMINAL. l 3.2.4.1 Connect terminals of Radeco H809C or equivalent to vehicle battery with engine running as stated above. Place air sampler on an elevated surface, not the ground. 3.2.4.2 Mark filter and silver zeolite cartridge to indicate air flow direction. 3.2.4.3 Orient the air sampler toward the plant and run air sampler for 5 minutes or as directed by FSGL. Record the. indicated flow rate on EP-211-4, Field Survey Air Sample Data Record. 3.2.4.4 WP.ile air sampler is running, label one envelope and one small plastic bag with the following infccmation: Location, Date, Flow rate, Time On, and

                       ' Time Off.

AIR SAMPLER SHOULD NOT BE RUN AT GREATER THAN 2.5 ( ,

                                                       .;[
                                                                              ,  .   >q      ,)
                                                                                    ..  .,' .1    .
   '. s      a                   -

t

                                                    . . . . .    . . - . . . -.   . . .     -.    . . . - - ~

f l' $P-211,Rav. 1

                                                    .                                 Page 5 of 16 REL/ nip t-4 3.2.5        If so directed by the FSGL take 6 inch and waist
 }k                               level shielded probe measurements using the E-1                                  520/HP-270.      If the 6 inch reading is greater than
 >                                the waist level reading, take several disc smears of l                                 representative flat environmental surfaces. Using
caution to prevent the spread of contamination, l

i' place smears in labelled envelopes for counting at a later time. l-i' 3.2.6 When you have finished collecting the Air Sample, j inform the FSGL that the air sample is ready to be 1 analyzed. Disconnect air sampler, place air sampler i

  • in vehicle, and drive to a low background counting area, as directed by the FSGL. While in transit, l monitor E-520/HP-270 or equivalent for radiation

{ levels. Note minimum and maximum readings and transmit the location of these readings to the FSGL. 3.2.7' Upon arrival at the low background counting area, set up the SAM-2 or equivalent and allow to warm up and stabilize, as follows: 3.2.7.1 Connect cable from RD22 probe to " Detector" jack on the front of the SAM-2. 3.2.7.2 Connect the battery lead to the " Battery" jack on g the back of the SAM-2. Plug other end of lead into { '( the socket on the side of the battery pack. 3.2.7.3 Set the SAM-2 Controls as follows: l Stabilizer: OFF

                              , Count Mode: TIMED l

Meter Channel: 1 Window: Set as shown on Calibration Sticker Threshold: Set as shown on Calibration Sticker Multiplier: x10 Response: " Midrange" "IN" Count Time: 5x1 Channel 1: In, + l Channel 2: Off,out H.V.: As shown on the SAM-2 Calibration Sticker. l

     , ryg-      e g ~e'-       .    &
     -        -         ..                              -       :.: -                       . ,     .                .              1 . ;..:. w .;

I, EP-211, Rev. 1

        )f.

Page 6 of 16 j, REL/ nip 1 g ~ (' 3.2.7.4 Switch the " Power" Switch on the back of-the SAM-2 to "ON". Press the " RESET START" button on the front of the SAM-2 and allow the instrument to count y for 5 minutes to warm up. IF THE "BATT OK" LIGHT IS'NOT LIT, INFORM FSGL. 3.2.8 Remove only the particulate filter from the air a sampler head and perform an analysis of the 1 particulate filter using the E140N/EP-210T with the

)                                              SH4A sample holder. Record background readings and 1

sample readings in EP-211-4, Field Survey Air Sample Data Record. .] d CAUTION

 !                                                   IF BACKGROUND RADIATION LEVELS EXCEED 300 CPM USING
]                                                   THE E-140N/EP-210 T, INFORM THE FSGL AND MOVE TO j '

ANOTHER COUNTING AREA WHERE THE BACKGROUND IS LESS l l THAN OR EQUAL TO 300 CPM. l l 3.2.9 Run the air sampler for one minute with the silver zeolite cartridge in place to purge the cartridge. 3.2.10 Place the Ba-133 check source cartridge against the

       .(                                     end of the RD22 probe and set the count time on the SAM-2 to 2x1 minutes. Fress the " RESET START" i                                             button and count. Record total number of counts on d

Appendix EP-211-4. - 1 3.2.11 To establish the background of the counting system, j exchange a clean silver zeolite cartridge for the i Ba-133 check source and press " RESET START". Record J total number of counts on Appendix EP-211-4. 3.2.12 Compute the net count rate as follows:

t NET (CPM) = GROSS COUNTS-BKG COUNTS 2

o and record on Appendix EP-211-4. 3.2.13 Compare the net count rate to the allowable net count rate listed on the SAM-2 calibration label. If the measured net count rate is within the range specified, proceed to 3.2.14 and use the SAM-2 for j I-131 determination. IF THE NET COUNT RATE FALLS

OUTSIDE OF THE ALLOWABLE RANGE, REPEAT STEPS 3.2.10

.,. TO 3.2.13 ONE TIME. If results are still unsatisfactory, inform the Field Survey Group Leader.

           .-. ,-.~            ~ ,
                           ,                                                               m-     a                                           *
                                           -r.,~v--w---         r  ,-- , , , , -    -
                                                                                         +      g     ,,a,, ,,w-*-.y
         -                                                           , - x.        -  2
. .a..: a a .n: =.i.h a. - ~ ^ ..

7 . l, EP-211, Rev. I j Page 7 of 16 j., REL/ nip a ii THE BA-133 SOURCE CHECK STEPS 3.2.10 to 3.2.13, MUST j (.- BE PERFORMED INITIALLY TO VERIFY SATISFACTORY i OPERATION OF THE SAM-2 COUNTING SYSTEM. THIS CHECK i NEED NOT BE PERFORMED PRIOR TO COUNTING SUBSEQUENT AIR SAMPLES UNLESS THERE IS REASON TO SUSPECT A l

d. PROBLEM WITH THE SAM-2 COUNTING SYSTEM. THE
>i                                                           BACKGROUND, HOWEVER, MUST BE COUNTED PRIOR TO
{ COUNTING EACH AIR SAMPLE.

1

 .j                                              3.2.14      Remove the silver zeolite cartridge'with the field a                                                             sample from the air sampler head and carefully wrap

/ the cartridge in cellophane. d l- l 13.2.15 Place the RD22 prebe next to the wrapped cartridge J and. press " RESET START". Record TOTAL number of j- counts on EP-211-4 when the count is ccmplete. 9 d i 3.2.16 Calculate I-131 concentration using the equation listed in EP-211-4, Part 2 and transmit the results j *o the FSGL. 3.2.17 Rebag the samples for transport back to the site'for analysis. 3.2.18 Await further instructions from the Field Survey Group Leader.

            ~

3.2.19 Before returning to the site, survey self and s vehicle for contamination. If contamination is ' found, inform the Field Survey Group Leader and take

  '                                                          the vehicle to the designated Vehicle .

Decontamination Facility. l 3.2.20 Bring all environmental samples to the Counting Room I in the Radwaste Enclosure and turn them over to a member of the Chemistry Sampling and Analysis Grcup or as directed by the FSGL. 3.2.21 Place all data forms in a clean plastic bag and have a noncentaminated individual bring the bag to the Field Survey Group Leader in the TSC. 3.2.22 The Health Physics Technician shall inventory the field survey kit upon returning to the site and report results to FSGL. 4.0 APPENDICES l 4.1 EP-211-1, Emergency Exposure Guidelines t 4.2 EP-211-2, Field Survey Group Survey Record 4.3 EP-211-3, Field Survey Group Exposure Record

         .h                                  .O
      . . , .                                                       ~_                  - - . . ~ . -           - - <
              . - . . _m.,_     _ _ _ - _ ..      , , , .  . _ ,    .y,                                                    .. _,.__m . , _ . -_
         .- =. .....                                             . , . . .w . . .a .u.x . a.:.ww . :.w. .. . . u .- .                  - ^              - - --        '

u:w.a:

j. g. i, '
                                                                                                                                              'EP-211, Rev. 1 Pagn 8 of 16 REL/nlp i

l 4 4.4 EP-211-4, Field Survey Air Sample Data Record I ('~ l' 4.5 EP-211-5, Field Survey Group Leader Data Record i ? 4.6 EP-211-6, Field Survey Checklist I; i

    ~

Y f 5.0- SUPPORTING INFORMATION ( h 5.1 PURPOSE

  • 3 The purpose of this procedure is to provide
i instructions and guidelines for the actions of the j Field Survey Group.

l- 5.2 Criteria for Use i 5.2.1 An actual or potential release of radioactive material beyond the site boundary in excess of technical specifications. 5.2.2 The Field Survey Group shall be activated at the 4 - Alert level or as determined by the Dose Assessment Team Leader. f 5.2.3 The group members exposure shall be limited to the

\ guidelines in EP-211-1, Emergency Exposure
,                                                       Guidelines.

5.3 Soecial Equipment - 5.3.1 Radio with 2 Battery Packs 5.3.2 Field survey kits ! 5.3.3 Vehicle l ) 5.3.4 Emergency Dosimetry (0-1500 mR and 0-5 R DRD's) l 5.4 References f l 5.3.1 HP-428, Operation of the Gilian Mcdel HFS 113AUT I Lapel Air Sampler 1 s e i i i i a t 5  : , ._... _ _,

,,. ~. .. . . _ . _. . . . . . . _ . . . _ _
                 + ,,            ,   , . - . - . - - . . . - -                   , , . . .       , ,       . . - - . - , - . , - - , -          . , - _ . -      ,-     , - . - -.,     .
                                                 ...a.-                                 :..
                                                                                                                                      . . .            .   .-..a              ..       - . ..

2, p- i . i-

              .                                                                                                                      - P-211, Rav, 1 S                                                                               -

Page 9 of 16

h. REL/ nip 1

9 i _ (~ APPENDIX EP-211-1

, EMERGENCY EXPOSURE GUIDELINES i

j Projected g Whole Body Thyroid Authorized 3 Function Dose Dose By

1. Life Saving and Emergency **

Reduction of Injury 75 rem

  • 375 rem Director
2. Operation of Equipment to Mitigate an Emergency **

Emergency 25 rem

  • 125 rem Director j 3. Protection of Health Emergency **

1 and Safety of the Public 5 rem 25 rem Director 4 ) 4. Other Emergency 10 CFR 20 10 CFR 20 Emergency e- Activities - - - A.,, limits limits Director

5. Re-entry / Recovery Station Station
                                                                         ..Administra-Activities                                                                       Adminis-tive Guide-                       trative

( lines Guide-

             ,                                                                                              lines                        N/A

Reference:

EPA-520/1-75-001 Table 1.1 . .

                     ** Suen exposure shall be on a voluntary basis f
                                                                                                                                                                      - - - -        ---' ~ ~~~

i .[ l

           . s.             p.                                 se -
                        ,...e             .   . . .                    .                                                                                                                         ~ *
  • w---- -t- -- y- ee,-g gw ec.,- --- - - . -w .y -+e-=.ygi veg.-- c .-- , --.r- . y ep
            . , _ , - ~ . , . . . .              = . . . ~ .      ..        . -..   . ...-.a....
                                                                                             .        . . .. : a    . . - . . - .       a   ...;.u.........

l'j ./ '. EP-211, Rev. 1 Page 10 of 16 REL/nlo APPENDIX EP-211-2 .!f FIELD SURVE'l GRO'UP SURVEY RECORD

~

I' 1;.

                                                                              .(Page 1 of 2)

Field Survey Team Team Members: Date: / /

n t

NSTRUMENT INVENTORY

 ;.                   -:nstrument Type'                             Serial Number        Calibration ok        3att ok              Response ok i

RO-2A

 ;                     E-520 if

{ E-140N HP210T f , t Rgdeco E-890C n I (3AMII

 ,               I Lapel Air Sampler i                                                                                                                          .
           .Me                                  p
       ),!          :I        ' j                  ;  l-  t               ;        . i     !   ! iiE                    L:         , ' s i!'   2        7 oui, '

i' , , . 1 6 p n 1 i e n

            ' ,                                        r v f /.                                   u aoT                               e      s E                       l yo 1 R                          'o d p C      ,1 hox 1                                  WBE 1 e 2 g                                       2
              - a                                       m PP                                         c E                                      s0 t0 rl1 au/

esm

                                        ~

meo SRd c c1 - /3 i1 C uI 1 n oB i ts cs Cao D Prr - R MFG O , C d E e R d l m 2 Y 0 et

                            -     E        7 i sR 1      V     )  2 hi       I I

1 R 2 - sa/ - P nwR l 2 i

                            -     S     f  I I   U      M P             o /                                                                                                          '

E P 0 dt =. O-I t 2 2 en X O 5 di I R e - iaR - D G g EcwI I N a i// E Y P h" R . P E ( S6M P V A R n U i S D. i ee iA mr a E T - I F y e v r

                                               /       u

_ eeS t m aif m DTo - n i t o a c I o. - y e v r u S

                                                              .   .   .      .   .       .   .    .       . 0       1   2      3           4        5 1   2   3      4   5       6   7    8       9   1       1   1      1           1        1 x

l l t f: i"Ii  ;

                                                            '                                                     j         ,.         i'       , . .

c .. : .

                                            .3..-.....          .......x        .-..             . . ~ . . ... . w sa. a. . : m .w . . . . . . :.c,   =

3- -> EP-211, Rev. 1 Page 12 of 16 1 REL/ nip ( APPENDIX EP-211-3 FIELD SURVEY GROUP EXPOSURE RECORD Fiold Survey Team Date: / / Time: l Dose 1 l Rec'd. Time Spent Ini l Name 1(mR) Area (Hrs.) iMPC-hours **l I I I  : i l I I i I (A) HP TECH I l l l l l l l i (B) DRIVER l l l l l l l (C) OTHER l l l l l

          ~**MPC-hrs (I 131)=(Detected conc. uCi/cc I 131)(Time in Area)(1.llP8 MPC/uCi/cc)
           ** NOTES:
1. MPC-HOURS ARE CALCULATED USING I-131 AS THE LIMITING ISOTOPE
2. MPC-HOURS ARE ADMINISTRATIVELY CONTROLLED AT 20 MPC-HRS /WK; (xposures>20mpc-hrs /wk to 40 mpc-hrs /wk can be authorized by the Personnel Safety Team Leader (A) (B) (C) (A) (B) (C) l l l l l Previcus Daily Exposures I (mR) W/B 1, l l MFC-nzs.

I i i l Expcsure frcm this entry + l l (mR) W/B l l l MFC-hrs. l l  ! -

                                                                                                                            !    l-Exposure Totals                                    l                   l          (mR) W/B i          ,

i l MPC-nrs. I i i Remaining Balance I(mR) W/B l l l MPC-hrs.

3. INDIVIDUALS SUSPECTED OF EXCEEDING 10 MPC, HRS /WK ARE REQUIRED TO HAVE A~WHOLE BODY COUNT
4. DOSIMETRY RECORDS ARE REQUIRED FOR EXPOSURES > 2 MFC HRS / DAY,
                 >10 MPC HOURS /WK.

COPIES TO: - FIELD SURVEY TEAM LEADER; - DOSE ASSESSMENT TEAM LEADER l (

  , w                            g.   .
 %. W4'    4   W.'  _'M*          *                  *""           W               '

S' , s ,

  , . . : .a . ~. .: .  .                u . .. .                     ~ . . ~          :w. w a u .u. w . < w : - .. .;.. ..~ 1 a u i a:. a t W M w :. k x.

_p.)-

                  ,                                                                                                          EP-211, Rev. 1 Paga 13 Of 16 REL/ nip i

( ' APPENDIX EP-211-4

q. FIELD SURVEY AIR SAMPLE DATA RECORD Date: / / Time:

Survey. Team " " Location Sector i' 1. Air Samole " Time On"

2. Air Samble " Time Off" b 3. Air Samble Run Time minutes
 !                4.         Air Samble Flow Rate                                                                                 cfm
  ?               5.         E-140N/SP-210T Background                                                                            cpm
6. Particulate Filter Gross Count Rate cpm
7. Particulate Filter Net Count Rate cpm (net)
   ,              8.         AgX Cartridge Gross Count Rate                                                                       cpm
9. AqX Cartridge Net Count Rate cpm (net)
                *10.HSAM-2 Ba-133 Check source                                                                     Counts /2 min.
11. SAM-2 Background (clean cartridge) Counts /2 min.
                *12. Ba-133 Net Counts                                                                             Counts /2 min.
13. SAM-2 I-131 field sample Counts /2 min.
  • Perform initially to verify operation of SAM-2-See NOTE, sec. 3.2.13 3 ( PART 2 i

Determination of I-131 Concentration

 !              1. Air Sample Volumet i

P Run Time (43) X Flow Rate (44) = cubic feet (ft3) 1 2. (213)(*11) b  !~' Counts - Skg ~' l~ l ~l

                                                                                        ~

l -l l~ 1 -l j l_ 2 Minures _ l _ Eff _l _ Volume _l l _ 0.95 _! x 1.59 Nil = uCL/cc

,                 l  _     2 Min _                _            _       _             _      l _ 0.95 _.      x 1.59 Nil =                         uCi/cc j                                                                                        PART 3 4

Determination of MPC Fraction (If directed by FSGL)

                       - E-140N - (Net CPM)

(Volume) (18.7) 4 i wr s , . ~ . . -,

                                                          .g .s p , -sy                             e.                        nn:   _ e= ~p ow ,,   .w~

s -

       , _ _ _ _ . , _               _         . . .   ._.m_..mmmm,               - - . . . _ . .
                                                                                   .                    =~ ~ <- .       .       u .u..esx . .= w-.        - -, - - - -
               ,i*                                                                                                                         EP-211, Rsv. 1 Pags 14 of 16 REL/ nip
      -(                                                                        APPENDIX EP-211-5 FIELD SURVE'l GROUP LEADER RECORD l

! Date: / / Time: EST A Survey Team " " Location i 6" Waist High Sector

                                                                 !                                        l
;                       Area Dose Rate ( )l                                                                  mR/Hr (shielded)E-520/HP-270 l                                          'mR/Hr(unshielded)E-520/HP-270

( ll i L U- Direct Frisk of Air Sample Filters AgX net cpm F Particulate Filter net cpm Air Sample Data , (Part) MPC Fraction (unidentified) ) s) (. (I - 131) uCi/cc .

                                                                                                                                                    ~~

l Copies to: Field Survey Team Leader - Status Board Keeper - Dose Assessment Team Leader ' A

     .m y                          - y so-           <           ..>.-n..seee-~                 .m.

w ,y - .-#y gn - *.e ,-y,, 3 .-e y &=

                                                                          +*/**     **r     *   **'7'"      ***'W*i    '"N**          "!
                                                                                                                      ,       ,        bf,
                                                            .a.
                                                            .       . .. m w wmav ; , . w.                 ,   . .
                                                                   ~
1. EP-211, Rev. 1
         '                                                                                                          Paga 15 of 16 r

REL/ nip } . ) ) (- APPENDIX EP-211-6 1 FIELD SURVEY CHECKLIST i

1. BEFORE LEAVING SITE f

A) All Equipment accounted for and operable

 ,-                             B)         Have been briefed on situation, etc.

1 ' C) Have Emergency Dosimetry and they are zerced D) Communication check performed t E) ES20/HP270 is ON l 1 A j 2. AT THE SURVEY LOCATION AND WHILE IN TRANSIT A) Locked for and reported location where increasing

 ,                                          radiation levels occurred while still in transit to specified survey location j

l( l i B) Performed air sample using lapel air sampler, if necessary

}                l              C)         Performed survey using E-520/HP-270 to look for maximum dose rate at waist level in 360 deg. radius l              D)        Survey with E-520/HP-270 with probe shielded and unshielded i              I)        Have notified TSGL of arrival and dose rate encountered l                      "

i F) If advised to take air sample: j 1) Particulate filter and silver =eolite cartridge marked to indicate direction of air flow

2) Air Sampler head loaded with filter located outside g of cartridge
3) Air Sampler head oriented toward the plant and
running. .

$ 4) Flow Rate observed and recorded G) If Jirected by FSGL, 6 inch gamma readings taken with E-920/HP-270 i e 4 -e>v> *e,

    .gie     p                a    de - g y       ,,                  's
                                                                         ,ey vy3 g Qt# ? 41 m - # ' q -- #

9

         .w. : . . . s u.a.:.~ . m .u = a n-sur m := a n :.;. .                                                .

EP-211, Rav. 1 e' Paga 16 of 16 REL/ nip k 4 ( H) If 6" readings higher than waist level readings, smears taken i k I) Notified FSGL that Air Sample has been pulled and

- advised to move to low background counting area to i analyze sample .

9 g J) ES20/HP270 is ON during transit - lcoking for and , reporting locations of maximum and minimum dose rates ? i k 3) AT LOW BACKGROUND COUNTING AREA f A) SAM 2 set up and counting for 5 minutes to warm up

                                 *B)         2 minute count of Ba-133 check source (for initial b

analysis only) h

C) Remove and count particulate filter with E-140N/HP-210T 1

j D) Purge Silver zeolite cartridge for 1 minute

E) 2 minute count of Clean Silver Zeolite cartridge

( F) 2 minute count of Sample Silver Zeolite cartridge

       .,-                        G)         I-131 Concentration calculated H)        All results recorded and relayed to FSGL I)        Advised to move to new .ocation i

J) If advised to return, monitor self and vehicle and > relay findings to FSGL K) All samples turned over to Chemistry Sampling & Analysis Group at Personnel Decon Facility in Radwaste Enclosure

       .____-e             .- - L )--g11-~ f e rms ~ tnined 6 e r t'Il~~ E F"SGL for subsequent dispostion
  • Perform initially to verify satisfactory operation of SAM-2 counting system only i (

O e S S g*- = e g , que.a .- e .- e.e m.-+=,.-ep-wee gem - e-.. s w p . - . .?, .~. 3 q.p gsy,g ,. p.g. .a e~ r-_-e-. , ~ ~ - - - . ~ -

7 ' l EP-29l Rev. 5 1 1 3852051720 Dago 1 of 7

VAW/JLP/mc e .

PHILADELPHIA ELECTRIC COMPANY j ( LIMERICK GENERATING STATION 2*M N i EMERGENCY PLAN IMPLEMENTING PROCEDURE EP-291 STAFFING AUGMENTATION i j 1.0 PARTICIPANTS \

- 1.1 Shift Clerk or other assigned person shall perform tne following procedure.

I 2.0 ACTIONS - IMMEDIATE 2.1 Shift Clerk or other assigned person shall: 2.1.1 Ask the Emergency Director if the TSC and EOF or the l TSC only is to be activated so that this information can be given to the Dose Assessment Team Leader and Communicators and what groups are to be activated for transmission to Team Leaders. Event Classification I i b I

     .(                                                          Facilities to be activated TSC TSC & EOF Groups to be             I   .

l ,1 f i [i g q at ( Personnel Sa v y y 'Q f.] Plant Survey h. ,[, ) - ist Aid / Search a b hg ue e Desimetry, Bioassay & g f'

Respiratory Protection
?

i Dose Assessment Team I

,                                                                      Dose Assessment group Field Survey Security                                      ,p,             M

(- 'E '7 p"Jg4Al%7

 !                                                               e O. O.
  • m '

s .

                                                                                                                                ' . " 9;(}

( t 'i s - 0

                                                                                                       , y,          _
                                                                                                                          . ':r a        L l                                                                 d
          =e p
  • am e e rep ee s - y t otes - e t. e*je
  • I
          * '*                                                                                                  EP-291 rov. 5 Pagg 2 of 7

./ VAW/JLP/mc t - l  ? ( Access Control Personnel Accountability Fire and Damage Fire Fighting Damage Repair Chemistry Sampling and Analysis 2.1.2 Contact in sequence the personnel listed in Section 2.2.

 )                                 2.1.3     Inform each person contacted of tne event i

classification, that they are to respond to their assigned location and what :roups under enem are to be activated. If the person is unable to respond, go to the next person on the list. 2.1.4 Attempt to contact personnel who have pagers, by that method if they are known to be "on the page", or the phone is busy or there is no answer. ( 2.1.5 Inform Emergency Director of results including discrepancies.

 )                                 2.2       Personnel to be contacted are:                              .

2.2.1 SHIFT I&C TECHNICIAN Ccmmunicator shall request in -

                                                                                                    -ne TSC "        activated.

(Shift I&C Technician ext.

)

IGC Technician Time 3v

                                                                                                      ~

l l

                                                                            ,w      *) Yg     '
                                                                                              ,                      ')
                                                                                                      )... '
                                                                                                                .o      3
                                                                ~.
                                                                             .   :   n 1. ,  A          ~
a. .
                                              ,~~
                                                                            .:) .k i            '
                                                                                                  ,   ';: -,. '\        v
. \ .';.%.
                                                       .   .: .    . .,,.                        i I                                           i                'b        "
  ,   !, ,                                                                                                                                                                           EP-291 Rev. 5 Page 3 of 7 VAW/JLP/mc 2.2.2                                                                     EMERGENCY DIRECTOR The Station Superintendent or Assistant Station Superintendent is contacted by communicator and is one contact. Do not re-contact if he has been successfully reached.

Disposition-Busy, d ime Called No Ans.-Centacted Called By Station Supt.

      'G.M. Leitch Asst. Station Supt.

J. F. Fran: [ 2.2.3 OPERATIONS ENGINEER Disposition-Busy, G Time Called No Ans.-Contacted Called By Operations Eng. ' l J. Doering

    /

(i J. Armstrong

    \

l 2.2.4 PERSCNNEL SAFETY EAM LEADER (CNE) - Communicator shall request that the Team Leader call in Group Leaders cf groups to be ac:ivated and that the Gecup Leaders call in heir grcups.

       ./                                                                                                                                                 D t s ec a i::.0 n-3 u s v Mc hns.-C ntacted              Called Bv t Senior Health Physicist R. W. Dubiel Applied HP R. Titolo B.meCal'ed           .

i m a, m a, 3 0.; a\ e *3r k n-9 n g* * *' d

                                                                                                                                                    .1 .      ,
                                                                                                                                                                   .,e     s- ,s   k
                                                                                                ** ,.5           ,                                  i  ,.
r. v .. .a .3 2 .. , . -

( { - .) e VM @ #

  • 0
        -                             ~                      -        -
                                                                                                                                . . . _   i EP-291 Rev. 5 I

Page 4 of 7 VAW/JLP/mc

                                                                                                                                          \

i

/ 2 . '2 . S DOSE ASSESSMENT TEAM LEADER (ONE) k

( ( Communicator shall request the Team Leader to call in f team and the Field Survey Group Leader, and to report to l the TSC or EOF as determined by Step 2.1. I

Disposition-Busy, i

e-- _ Time Called No Ans.-Contacted Called By i e i Technical Support , ! [ Health Physicist G. Murpny ! i j I Physicist Rad. Proc. i t D. Rembold 6 ? ', 2.2.6 SHIFT MAINTENANCE SUB-FOREMAN Extensic f page. C:mmunicator shall request the l I Maintenance Sub-foreman to call three maintenance ' mechanics, preferably, one electrician and two machinists l i or fitters. 1 1 j Sub-foreman Time Bv ' I 4 ! 2.2.7 TECHNICAL SUPPORT PERSONNEL (ONE) , 1 - j Cor:'.municator shall reques call in of "echnical Supper: j Group Members. ' Dispcsition-Busy, [ . Time Called No Ans.-C ntacted Called 31 1 , 7 b f Perf rmance Engineer l . A. Hopkins k l 7. Cwietniewic I&C Engineer { l l G. R. Rainey j l ( Reactor Engineer  ! ! K. W. Hunt - %N ' i # ...- .- A T1 i

_ _. 1 c yl a -c. > 3- 1
                                                         .,       y,n. 7
                                                                               *   \     _      g   n%
                                                                                                    'A      'V.'s   t 5            '
  • 4 q., .

l J ... . d.- - l s a l - ,

   ,     I,   ,                                                                                                                   EP-291 Rev. S l                                                                                                                                      Page 5 of 7
                                                                                                                                         'IAW/JL P/mc 2.2.8   COMMUNICATORS (ONE per facility)

I ' ( Communicator shall request call in of members for the TSC l l or EOF as determined by Step 9.1.1.1. , Disposition-Busy, Time Called No Ans.-Contacted Called By Technical Support Center (TSC: Communicator 4 l 3. Feaster 1 l  ! Alternate [ l E. Boscola EOF Communicator K. Cenci

                                                                       ~
                                                                           ~

Alternate - W. Lewis . ( 2.2.9 CHEMISTRY SAMPLING and ANALYSIS. TEAM LEADER (ONE) Communicator shall request call in of Chemistry Sampling and Analysis Team Members by Group Leader. Dispcsitien-Busy,

            /,                                                   Time Called                 Ne Ans.-Centacted                          Called av
           /

( Sr. Chemist J. S. Wiley Supv.-Chemist J. Sabados

                                                                                                                                    - - - -  - - - - - ~ ~ -

t

                                                                                                    .s f. , , .z   '

Z.eb I f '. - p . .ap, s.1..,.f,. , \ y'3 .ss g; 3

                                                                                                              . 3a s 3.             .
                                                                                          \s;5 o
. s
                                                    .          ,\
                                                                    . '. -)           y y       ; s :7

( '

                                                  .. ' a,  -      '
                                                                                   '3=                                                                           ,
                                       ' ,) u.'.. .,. %3 L.j            $

l

                                                  -                                                                                                             \

w8 eunum. , , , - '* -. .

                                                                                                                                                     , . _ . _          ,. .. .. ~ .. _,               . . , _ _ - . _ . ,        _.m__
          .i.                                        -

EP-291 Rev. 5 Page 6 of 7 VA*d/JLP/mc l l l . 2.2.10 FIRE AND DAMAGE TEAM LEADER (ONE) i k. Communicator shall request the Team Leader to call the l appropriate Group Leaders and have Group Leader call in l Group Members. i l

                     /                                                                                                           Tim.- Called Disposition-Busy-No Ans. -Contactec                      Called Bv i

i. Engineer Maintenance J. 3. Cotton I C. *iyler o l

                         ,       R. 3 aun
                                                                                                                     /                                                                                                                   :

l 2.2.11 SECURITY TEAM *EADER (ONE) i t Communicator shall request :he Team Leader :o call  !' appropriate Group Leaders and have Group Leaders call in personnel. I Disposition-Busy, f

  • ime Called No Ans.-Contacted Called By
        \                                                                                                                           i i Security I                                Administrative Assistant                                                                                                                                             .
P. Supplee i Site Captain (Protected Area)

M. Berner

                  .             Access               '.t.
                ;               Ricnard Par <er                                                                                       !

1 ( i l 3.0 ACTIONS-FOLLOW-UP A f.C n

                                                                                                                                                                                                           @ .i.

l 3.1 None Required. e.g 3 '3 l I; g 'R,. } .'

                                                                                                                                                                                                                               /

Sc, 3 . 3*s

                                                                                                                                      .e4                '.:.t . c..l1f*
                                                                                                                                                                      .I 1

T"'\ l

                                                                                                                                                                                          !; ^     .

2

                                                                                                                                                                                                          \ \-

a-3

                                                                                                                                ','      Ml s' t-.. ;1.

4.0 APPENDICES * -

                                                                                                                                                             .1 g.s ,.4          .s                         -
                                                                                                                           'fi            ". 'a None.
                                                                                                                                              ~

g (

        \

i l d

   -p.---.+-ew,---..--...._..-.-._.,,_.___m,,                      _ . - . . , - - _ _ , . , - - , . - _ , , , _ _
   ..                        ,             .                     . ...             _ _ . -._. . .u..                n.:  c . c a . a -. .        .
 ; . ,;,*                                                                                                         EP-291 Rev. 5 Paga 7 Of 7 VAW/JLP/mc i.'

5.0 SUPPORTING INFORMATION - 5.1 Pureose ) The purpose of this procedure is to provide guidelines and information necessary to perform staff augmentation. 5.2 Criteria for Use h- This procedure shall be implemented at an Aler:, a Site  ! Emergency or a General Emergency or at :he discrecien of the

i Emergency Director.

5.3 Special Eculpment t None. References 5.4 ! None. B } 3 1 l

/      {-

d 0 9 . i. i 1 o 4

      -{
      ,yp s                    ..,p.,. _%,..   ~....-..-4                  .-

j , ' _, _ , , , .

                                                                       ,~.--.        --- 4-- -u   -

_ . . ~. , . .. _-. ._. , _ . - _

       . . (..              !.                                                                                                                       EP-35.2 Rev. 3 i
  • 3852051730 Page 1 of 3 7AW/GWM/rgs PHILADELPHIA ELECTRIC COMPANY

(- LIMERICK GENERATING STATION - EMERGENCY PLAN IMPLEMENTING PROCEDURE 22 M E1-312 5 RADIOACTIVE LIQUID RELEASE 1.0 PARTICIPANTS 1.1 Emercency Director shall have the necessary actions performed to terminate the liquid release and evaluate the consequences of the release. 1.2 Site Emergency coordinator, if activated, or Emergency Director snall direct tne folicw-up actions of notification of downstream water users and river sampling, if required. 2.0 ACTIONS-!MMEDIATE 2.1 Emergency Director shall: ( 2.1.1 Direct the immediate steps necessary to terminate the discharge to the river. 2.1.2 Direct the Chemistry Sampling and Analysis Team Leader to initiate sampling of the blowdown line in accordance with EP-23 inia- 3' 7g nym e Water Samples Following Rad *lk asp iter Accident Conditions. .

                                                                                                                                              ,3     $

2.1.3 g y I E AJs Me Direct 4h ec@r.> Asshs sme<lt: Na- p%eg ,t::.n.< est;na e g os @ rosjeatio f i d s ti: N i i nefe $ (d . ng -a er 4 +?.and?fishtin. accordayct Mit;: SPd u;d .:e_ ease

                                             %* ? .i                 Dose Calculart;).ok Metnod 'f t: 6t.r.M
                                                                                                                                           ,'.'ter and E.:-319,
                                 . ,,                                Tish'Iigesti'on      l         P'athway Dose Calculatigna rey                                 tively.
                                  .                .12-              dite Emergency Coord                                    ,          i '.          r            rgency
                                    . .\          'S       '

Director snall:

                                     .2 2.2.1        Based on results of estimated dose projections for downstream water users and fish ingestion, direct his communicator to notify the Department of Environmental Rey urces.                         _
                                                                                                                     ~

A. 4 i

m. , .s. .
      --m                               ,,                           .%, , ,                    .                                                                             ~ * " "
                                                                                                            .          m.                                                             .%

_. __, . . .._ .. ~ - . - . . - - , . . s.th

                    !a                                                                                 EP-312 Rev. 3 Page 2 cf 3 i

VAW/GWM/rgs B ,

        ~

C . gional Office) ' V 2.2.2' If requested by the Department of Environmental Resources, direct his communicator to notify the downstream domestic water users in EP-287, Nearby Public and Industrial Users of Downstream Waters. 2.2.3 If necessary, direct the HPSC Cecrdinator to activate and request the Environmental Sampling Coordinator to assign personnel to sample the river water near the intake for the following water companies sampled at the appropriate time based on the Estimated Transit Time for that location. The Estimated Transit Time is the time recuired for the material released to reach the loca:idn of l 1 interest. Estimated Iransit i \ c Lo'ation Time (hrs) A. Citizens Utilities Ecce 1.5 Water Ccmpany-Royersford

3. Phoenixville Water 10 _.

I C. Philadelphia Suburban 16 l Water l D. Norristown Water 27 l E. Philadelphia Belmont Water 50 2.2.4 Direct :he Chemistry Sampling and Analysis Team ~_eader and/or Environmental Sampling Cecrdina::: :: ::ansmi: the sampling results oack Onem. 3.0 ACTIONS-FOLLOW-UP None 4.0 APPENDICES N N_

                                                           .4 npsm;a.
                                                              -4 . i
n. ,. i ;u .:, _

c c.T. _1 c2 ci- f l (. . T

                                                                                                                                ~ ' ' * * *
                                                                       ._._____~

E . o,t , ,l , EP-312 Rav. 3 Paga 3 of 3 i 7AN/GWM/rgs

       <       5.0 SUPPORTING INFORMATION 5.1   Purpose The purpose of this procedure is to provide guidelines for the actions to be taken wnen an uncontrolled
 ;                       liquid release of radioactive material occurs.

5.2 Criteria for Use l 5.2.1 A liquid effluent release in excess of Technical

. I Specification 3.11.1.1 or 3.11.1.2 has occurred.

5.3 Soecial Ecuioment None 3 5.4 References 'f q 5.4.1 Limerick Generating Station Emergency Plan i 's 5.4.2 EP-236 Obtaining Blowdown Line Water Samples Following j Radioactive Liquid Release After Accident Conditions I i 5.4.3 EP-318 Liquid Release Dose Calculation Method For j . Drinking Water 1 1 1 (- 5.4.4 EP-319 Fish Ingestion Pathway Dose Calculation 5.4.5 EP-287 Nearby Public And Industrial Users Of Downstream Waters - i 5.4.6 EROL Appendix 5.2A Radiological Dose Model-Liquid 1 Effluents 5.4.7 10CFR Part 20 Appendix B

            !      5.4.8 LGS Technical Specifications

[ e ( s

          +

p aw,

 /       'q,                           UNITED STATES 8'         'i               NUCLEAR REGULATORY COMMISSION h           .$                       WASHINGTON, D. C. 20555
         /                              April 1, 1985 50-352/353    Limerick MEMORANDUM FOR: Chief, Document Management Branch, TIDC FROM:             Director, Division of Rules and Records, ADM

SUBJECT:

REVIEW 0F UTILITY EMERGENCY PLAN DOCUMENTATION The Division of Rules and Records has reviewed the attached document and has determined that it may now be made publicl available.

                                                         /
                                       /                  /
                                             . M. Felton, Director ivisionofRulesandRecord/ U Office of Administration

Attachment:

As stated

y, - -- l: 9. . s.  % PEGULATORt 1"FC f4 ATION DISTRInUTION SYSTEN (RIOS) ACCESSIo9 hbR "^'" DuC.DATE: 85/03/15 NOTAHIZED: YES 00CKET *

      ;          FACIL:50-352 Limerick denerating Station, Unit 1, Philadelphia Ele                  u5000352 50-3b3 Limeric< venera*ing Station, unit 2, Philadelphia Ele                 v5000353 AUTH hAME             AUTHuR AFF.LIATION DALTdOFF,S.L.        unilaaelonf. Electric Co.

RLCIP.1Avt HECIPItNf AFFILIATI0tJ AURLEY,T.E. Region la Otfice of Director SchnENCER,A. Licensing Branch 2 SU6 JECT: Forwards Central Files version of Rev 7 to Procedure tP-102, i " unusual Lvent Response," Rev 1 to EP-211, " Field Survey j Group," Rev 5 to cP-291, " Staffing Augmentation" & Rev 3 to i

     !                      EF-312, "nadioactive Liquio haste." ditnneld.

DISTRIbuTIv4 CODE: X00dD TITLL: Emerg Plan (CF Avdil) LOPIES RECEIVED:LTR _ ENCL __ 5IZE d. i NOTES: LPb" 2cys Transcripts. u5000352 JL:1v/26/8u LPOR 2cys Transcripts. 050003S3

 'i                           MELIFIENT         LOPIES            RECIPIEf.T              COPTES Iv CODE /NAME       LTIR ENCL        ID CODE /NAME           LTTN ENCL vR4 LS eC               1    0      4ARTIN,d          pp;5i     1     1 INTE W L W 4/oRk 3           k6      1    1      IE/DEPEH/EPo dT3y(.f 2            2 it/DEPER/IR8 p           1    1      NdR / DS I/ A Ett 47 '2._
$$~j 1 1
                          .~Rn/vSI/RAo             1    0      REG FILES                   1     1 NOTES:                               2    2
                                                     \
                                         \

TAL 'lb4bFn GF CvPIES nEaViscD: LTTP 11 E..CL o}}