Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20101B632 + (10:12:29, 13 December 2024)
- ML20101B630 + (10:12:30, 13 December 2024)
- ML20101B625 + (10:12:31, 13 December 2024)
- ML20101B624 + (10:12:32, 13 December 2024)
- BSEP-96-0026, Forwards Rev 0 to NF-2495.0080, Brunswick Unit 2,Cycle 12 Core Operating Limits Rept,non-proprietary Rev 0 to 24A5195, Proprietary Rev 3 to NEDC-31624P & Rev 0 to NEDC-31624P. Encls Withheld (Ref 10CFR2.790) + (10:12:33, 13 December 2024)
- ML20101B619 + (10:12:34, 13 December 2024)
- ML20101B608 + (10:12:35, 13 December 2024)
- ML20101B605 + (10:12:36, 13 December 2024)
- 05000412/LER-1992-006, :on 920501,bistables for Channel I Pressurizer Pressure Tripped,Resulting in Safety Injection Block Signal & ESF Actuation.Caused by Inadequate Work Request Review.Signal Reset + (10:12:38, 13 December 2024)
- ML20101B581 + (10:12:40, 13 December 2024)
- ML20101B584 + (10:12:40, 13 December 2024)
- ML20101B575 + (10:12:41, 13 December 2024)
- ML20101B571 + (10:12:42, 13 December 2024)
- ML20101B569 + (10:12:43, 13 December 2024)
- ML20101B560 + (10:12:44, 13 December 2024)
- 05000220/LER-1984-018, :on 841113,during Startup,Mechanical Pressure Regulator Sent Erroneous Signal to Bypass Valve Relay. Reactor Scram Initiated by Low Water Level.Mechanical Pressure Regulator Cleaned & Lubricated + (10:12:46, 13 December 2024)
- ML20101B544 + (10:12:47, 13 December 2024)
- ML20101B536 + (10:12:48, 13 December 2024)
- AECM-84-0533, Forwards Response to Generic Ltr 83-28,Item 3.1 Re post-maint Testing of Reactor Trip Sys Components.Responses to Other Items of Generic Ltr Will Be Provided Per Schedule Discussed in Util + (10:12:49, 13 December 2024)
- ML20101B530 + (10:12:50, 13 December 2024)
- ML20101B528 + (10:12:51, 13 December 2024)
- ML20101B526 + (10:12:52, 13 December 2024)
- ML20101B511 + (10:12:53, 13 December 2024)
- ML20101B509 + (10:12:53, 13 December 2024)
- ML20101B502 + (10:12:54, 13 December 2024)
- ML20101B501 + (10:12:55, 13 December 2024)
- ML20101B497 + (10:12:56, 13 December 2024)
- ML20101B500 + (10:12:56, 13 December 2024)
- ML20101B493 + (10:12:57, 13 December 2024)
- ML20101B479 + (10:12:58, 13 December 2024)
- 05000321/LER-1984-027-01, :on 841117,diesel Generator 1B Declared Inoperable Because Lube Oil Temp Dropped Below 105 F,Causing Three Diesel Generators to Be Inoperable Simultaneously.W/ + (10:13:00, 13 December 2024)
- 05000321/LER-1984-012-01, :on 841114 & 20,reactor Protective Sys Logic Actuations Occurred for No Apparent Reason.Further Investigation Revealed No Cause + (10:13:03, 13 December 2024)
- ML20101B469 + (10:13:04, 13 December 2024)
- 05000483/LER-1984-060, :on 841114,high Steam Generator Level Caused Reactor Trip,Feedwater Isolation,Auxiliary Feedwater Actuation & Steam Generator Blowdown Isolation + (10:13:07, 13 December 2024)
- 05000454/LER-1984-009-08, :on 841116,auxiliary Bldg Vent Stack Monitor 1RE-PR028 Tripped Due to Filter Loading.Particulate Filter & Iodine Cartridge Not Analyzed within 48 H Because of Lack of Instructions from Lab Foreman to Technician + (10:13:13, 13 December 2024)
- ML20101B445 + (10:13:19, 13 December 2024)
- ML20101B438 + (10:13:20, 13 December 2024)
- 05000261/LER-1984-003-01, :on 840521,two Steam Generator Snubbers Being Tested Offsite Were Low on Fluid.Rear Monoball Bearing on One Steam Generator Snubber Failed at Less than Design Load. All Snubbers Rebuilt + (10:13:23, 13 December 2024)
- ML20101B424 + (10:13:24, 13 December 2024)
- ML20101B422 + (10:13:25, 13 December 2024)
- ML20101B416 + (10:13:26, 13 December 2024)
- HL-2229, Responds to NRC Re Violations Noted in Insp Repts 50-321/92-08 & 50-366/92-08.Corrective Actions:Design Change Request 92-075 Implemented to Install Jumpers Around Thermal Overload Devices of 12 Unit 1 motor-operated Valves + (10:13:29, 13 December 2024)
- ML20101B403 + (10:13:30, 13 December 2024)
- HL-2204, Submits Proposed Schedule for Addressing Items in App a of Se, ,of Second 10-yr Insp Insp Interval,Per 920416 Telcon W/Nrc.Response/Revised Relief Request for Table 1 & 2 Items Will Be Submitted by 920605 + (10:13:31, 13 December 2024)
- ML20101B395 + (10:13:32, 13 December 2024)
- 1CAN128403, Forwards Info Re Insp Techniques to Be Employed for Exam of 10 Sleeved once-through Steam Generator Tubes,Per 841010 Commitment + (10:13:33, 13 December 2024)
- 05000219/LER-1984-027, :on 841103,during Startup,Standby Liquid Control Sys Vol/Concentration Below Tech Spec Min Limit. Caused by Personnel Error & Improper Procedures.Chemicals Added & Procedures Will Be Improved + (10:13:36, 13 December 2024)
- ML20101B381 + (10:13:37, 13 December 2024)
- ML20101B375 + (10:13:41, 13 December 2024)
- ML20101B369 + (10:13:42, 13 December 2024)
- ML20101B355 + (10:13:43, 13 December 2024)