Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000499/LER-1992-006, :on 920522,component Cooling Water Outlet Valve from RHR HX 2C Opened & Header Pressure Decreased & Pump 2A Automatically Started.Possibly Caused by Loss of Power to Solenoid Valve.Visual Insp of Valve Performed + (10:00:45, 13 December 2024)
- ML20101F153 + (10:00:47, 13 December 2024)
- ML20101F152 + (10:00:48, 13 December 2024)
- ML20101F148 + (10:00:50, 13 December 2024)
- ML20101F151 + (10:00:50, 13 December 2024)
- TXX-9226, Notifies That Util Has Completed Implementation of Requirements of GL 89-13, Svc Water Sys Problems Affecting Safety Related Equipment, for Unit 2.Informs That Documentation of Actions Available for NRC Review + (10:00:51, 13 December 2024)
- ML20101F141 + (10:00:53, 13 December 2024)
- ML20101F143 + (10:00:53, 13 December 2024)
- ML20101F136 + (10:00:54, 13 December 2024)
- ML20101F135 + (10:00:55, 13 December 2024)
- ML20101F134 + (10:00:57, 13 December 2024)
- 05000373/LER-1984-078-01, :on 841117,control Room Received High Ammonia/ Chlorine Alarm Resulting in ESF Actuation.Caused by Broken Chemcassette Tape in Tape Carriage Mechanism.Tape Reattached & Procedure LIP-GM-940 Revised + (10:00:59, 13 December 2024)
- ML20101F130 + (10:01:00, 13 December 2024)
- PY-CEI-NRR-1516, Part 21 Rept Re Defects in MSIV Poppets Supplied by Atwood & Morrill Co,Inc.Intially Reported on 920522.Measures Will Be Established to Ensure That Adequate Repair Methods Are Employed During Future Repairs of Modified MSIV Poppets + (10:01:01, 13 December 2024)
- ML20101F126 + (10:01:03, 13 December 2024)
- ML20101F121 + (10:01:04, 13 December 2024)
- ML20101F123 + (10:01:04, 13 December 2024)
- 05000327/LER-1996-002-01, :on 960215,SRs Associated W/Fire Protection Hose Stations Not Performed as Required by Ts.Caused by Inadequate Procedure Rev.Entered Action of LCO & Established Measures to Address Issue + (10:01:06, 13 December 2024)
- 3F0692-16, Responds to NRC Re Violations Noted in Insp Rept 50-302/92-10.Corrective Actions:Rev Will Be Made to Plant Operating Qam Procedure (AI-400) to Provide More Definite Criteria to Implement Dept Policy for CR-3 Organizations + (10:01:12, 13 December 2024)
- ML20101F112 + (10:01:13, 13 December 2024)
- ML20101F109 + (10:01:14, 13 December 2024)
- 05000352/LER-1996-006-01, Forwards LER 96-006-01 Re Multiple Instances of Loss of Safety Function of Control Room Emergency Fresh Air Sys, Resulting in Operating Conditions Prohibited by Tech Specs + (10:01:17, 13 December 2024)
- ML20101F104 + (10:01:18, 13 December 2024)
- 05000336/LER-1996-005-01, :on 960212,discovered PEO Improperly Utilized to Replace Automatic Backwash Function of Svc Water Strainer Backwash Sys.Caused by Failure to Enter TS Action Statement. Revise Procedures for IST SWS Pump Operability + (10:01:20, 13 December 2024)
- ML20101F101 + (10:01:21, 13 December 2024)
- ML20101F100 + (10:01:22, 13 December 2024)
- 05000397/LER-1984-079, :on 840809,reactor Scrammed Due to Loss of Power to Feedwater Pump.Caused by Startup Transformer Overload Producing Voltage Drop on Secondary Transformer. Electrical Configuration Restored + (10:01:23, 13 December 2024)
- ML20101F080 + (10:01:24, 13 December 2024)
- ML20101F070 + (10:01:26, 13 December 2024)
- ML20101F069 + (10:01:26, 13 December 2024)
- ML20101F063 + (10:01:27, 13 December 2024)
- ML20101F059 + (10:01:28, 13 December 2024)
- 05000413/LER-1984-021-02, :on 841114,feedwater Isolation Experienced Due to Steam Generator hi-hi Level Signal.Caused by out-of-svc Sticker Placed on Channel Select Switch for Steam Generator C.Controls Returned to Normal + (10:01:30, 13 December 2024)
- 05000272/LER-1984-026, :on 841107,Tech Spec Action Statement Not Followed Verbatim After Seat Leakage on Main Steam Stop Valve Bypass Valve 11MS18 Resulted in Rupture of West Low Pressure Turbine Rupture Disk 12 + (10:01:32, 13 December 2024)
- TXX-4387, Requests Staff Approval for Usage of Listed Portions of ASME Code Section Iii,Subsection Nf + (10:01:33, 13 December 2024)
- ML20101F044 + (10:01:34, 13 December 2024)
- ML20101F040 + (10:01:34, 13 December 2024)
- ML20101F036 + (10:01:35, 13 December 2024)
- ML20101F029 + (10:01:36, 13 December 2024)
- BECO-92-064, Forwards Proprietary Deterioration & Repair of Concrete in Nuclear Power Facilities Survey for Plants for Pilgrim Nuclear Power Station,In Response to NRC .Survey Withheld + (10:01:37, 13 December 2024)
- ML20101F026 + (10:01:37, 13 December 2024)
- ML20101F023 + (10:01:38, 13 December 2024)
- 05000254/LER-1996-002-04, :on 960220,CR HVAC Sys Inoperable.Caused by Design Oversight Involving Toxic Gas Anlayzer.On 960223 Procedure Change to Qcop 5750-09, CR Ventilation Sys, Made to Allow for Operation of Booster Fans + (10:01:40, 13 December 2024)
- ML20101F019 + (10:01:41, 13 December 2024)
- 3F0692-12, Forwards 1992 Internal Cash Flow Projection to Satisfy Requirements of 10CFR140.21.Anniversary Date for Util Indemnity Agreement Is 920620 + (10:01:42, 13 December 2024)
- ML20101F014 + (10:01:42, 13 December 2024)
- ML20101F008 + (10:01:43, 13 December 2024)
- ML20101F002 + (10:01:44, 13 December 2024)
- ML20101E999 + (10:01:45, 13 December 2024)
- ML20101E996 + (10:01:46, 13 December 2024)
- ML20101E991 + (10:01:47, 13 December 2024)