Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20101G590 + (09:54:57, 13 December 2024)
- ML20101G588 + (09:54:57, 13 December 2024)
- ML20101G585 + (09:54:58, 13 December 2024)
- ML20101G583 + (09:54:59, 13 December 2024)
- ML20101G581 + (09:55:00, 13 December 2024)
- ML20101G582 + (09:55:00, 13 December 2024)
- ML20101G578 + (09:55:01, 13 December 2024)
- ML20101G577 + (09:55:02, 13 December 2024)
- 1CAN069207, Forwards Proprietary Pages to Summary Rept for Reactor Coolant Pumps Per Requirements of ASME Code Case N-481, Submitted by .Pages Withheld + (09:55:03, 13 December 2024)
- ML20101G575 + (09:55:03, 13 December 2024)
- ML20101G552 + (09:55:04, 13 December 2024)
- ML20101G549 + (09:55:05, 13 December 2024)
- ML20101G526 + (09:55:06, 13 December 2024)
- ML20101G528 + (09:55:06, 13 December 2024)
- ML20101G525 + (09:55:07, 13 December 2024)
- ML20101G524 + (09:55:07, 13 December 2024)
- LD-92-076, Forwards Draft Dctr 10, Sys 80+ Shutdown Risk Evaluation Rept, in Fulfillment of Commitment from .Final Version of Shutdown Risk Rept Will Be Provided by 920731. W/Eight Oversize Drawings + (09:55:08, 13 December 2024)
- ML20101G516 + (09:55:09, 13 December 2024)
- ML20101G513 + (09:55:09, 13 December 2024)
- ML20101G496 + (09:55:10, 13 December 2024)
- ML20101G475 + (09:55:11, 13 December 2024)
- ML20101G464 + (09:55:11, 13 December 2024)
- ML20101G447 + (09:55:12, 13 December 2024)
- ML20101G429 + (09:55:13, 13 December 2024)
- ML20101G434 + (09:55:13, 13 December 2024)
- ML20101G427 + (09:55:14, 13 December 2024)
- ML20101G416 + (09:55:15, 13 December 2024)
- ML20101G394 + (09:55:15, 13 December 2024)
- 2CAN069203, Forwards C-E Proprietary Final Rept CEN-600-P, Asociacion Nuclear Asco Units 1 & 2 SG Tube Repair Using Leak Tight Sleeves to Aid in Forthcoming Tech Spec Change Request for Facility.Encl Rept Withheld (Ref 10CFR2.790) + (09:55:17, 13 December 2024)
- ML20101G390 + (09:55:17, 13 December 2024)
- ML20101G372 + (09:55:18, 13 December 2024)
- ML20101G371 + (09:55:19, 13 December 2024)
- 05000285/LER-1992-014, :on 920514,steam Leak Identified Coming from Capped Connection on Turbine Trip Switch on Moisture Separator,Resulting in Reactor Trip.Caused by Communication Problems.Training Provided & Order Issued + (09:55:21, 13 December 2024)
- ML20101G367 + (09:55:22, 13 December 2024)
- 05000302/LER-1992-009, :on 920507,determined That Area Immediately Above Pressurizer Experiencing Temps in Excess of Design for Equipment in Area.Caused by Lack of Adequate Insulation. Insulation to Be Repaired Prior to Outage + (09:55:24, 13 December 2024)
- ML20101G356 + (09:55:25, 13 December 2024)
- ML20101G358 + (09:55:25, 13 December 2024)
- ML20101G355 + (09:55:26, 13 December 2024)
- ML20101G351 + (09:55:27, 13 December 2024)
- ML20101G350 + (09:55:27, 13 December 2024)
- ML20101G337 + (09:55:28, 13 December 2024)
- ML20101G335 + (09:55:29, 13 December 2024)
- ML20101G321 + (09:55:29, 13 December 2024)
- ML20101G307 + (09:55:30, 13 December 2024)
- 05000275/LER-1984-031, :on 841128,during Mode 1,turbine Tripped Due to hi-hi Steam Generator Level on Steam Generator 1-1.Caused by Personnel Error & Possible Instrument Failure.Controller Replaced + (09:55:31, 13 December 2024)
- 05000280/LER-1984-024, :on 841116,spurious Safety Injection Occurred When Returning Consequences Limiting Safeguards,High Phase (Equivalent to Containment Depressurization Actuation Sys) to Svc.Impact on Unit Minimal + (09:55:33, 13 December 2024)
- L-84-329, Responds to NRC Re Violations Noted in Insp Repts 50-250/84-27 & 50-251/84-28.Corrective Actions:Procedure Revised to Include 45-day Tech Spec Time Limit for Sample Analysis & New Decontamination Procedure Generated + (09:55:35, 13 December 2024)
- ML20101G296 + (09:55:35, 13 December 2024)
- ML20101G290 + (09:55:36, 13 December 2024)
- 05000454/LER-1984-016-06, :on 841121,during insp,125-volt 1E Batteries Declared Inoperable.Caused by Battery to Rack Spacing Exceeding Manufacturer Physical Seismic Test Parameter Limit.Spacers Added to Gap + (09:55:38, 13 December 2024)
- ML20101G288 + (09:55:39, 13 December 2024)
- ML20101G286 + (09:55:40, 13 December 2024)