Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- B15616, Submits Supplemental Info Re GL 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment, for Unit 3 + (09:20:01, 13 December 2024)
- ML20101N381 + (09:20:02, 13 December 2024)
- ML20101N375 + (09:20:03, 13 December 2024)
- ML20101N370 + (09:20:04, 13 December 2024)
- ML20101N368 + (09:20:04, 13 December 2024)
- NRC-96-0043, Submits Rev 27 to Physical Security Plan.Rev Withheld,Per 10CFR50.54(p)(2) & GL 96-02 + (09:20:08, 13 December 2024)
- ML20101N345 + (09:20:09, 13 December 2024)
- ML20101N333 + (09:20:09, 13 December 2024)
- ML20101N330 + (09:20:10, 13 December 2024)
- ML20101N323 + (09:20:11, 13 December 2024)
- ML20101N310 + (09:20:13, 13 December 2024)
- ML20101N307 + (09:20:14, 13 December 2024)
- ML20101N299 + (09:20:14, 13 December 2024)
- ML20101N296 + (09:20:15, 13 December 2024)
- LIC-96-0017, Notifies NRC of Implementation of Alternate Methods for Determining Integrity of Waste Disposal Sys Components/ Piping,Including Solid Waste Disposal,Liquid Waste Disposal & Gaseous Waste Disposal + (09:20:16, 13 December 2024)
- ML20101N275 + (09:20:17, 13 December 2024)
- 05000338/LER-1984-021-01, :on 841125,reactor Trip/Turbine Trip Occurred from 100% Power.Caused by Low Level Coincident W/Steam Flow/Feed Flow Mismatch Due to Failure of Controller Power Supply Card.Card Replaced + (09:20:19, 13 December 2024)
- ML20101N218 + (09:20:20, 13 December 2024)
- ML20101N215 + (09:20:21, 13 December 2024)
- 05000374/LER-1984-080, :on 841121,vacuum Breaker 2PC001A Tripped & Containment Venting Occurred.Caused by Primary Containment Chiller Trip.Pressure Equalized & Breaker Closed + (09:20:22, 13 December 2024)
- ML20101N208 + (09:20:24, 13 December 2024)
- 05000373/LER-1984-064, :on 841004,valve 1B21-F010A Discovered Not Fully Seated & Containment Leakage Limit Exceeded.Caused by Loose Hinge Pin Bushing.Valves 1B21-F032B & 1E51-F064 Also Exceeded Tech Spec Limits + (09:20:25, 13 December 2024)
- ML20101N191 + (09:20:27, 13 December 2024)
- ML20101N187 + (09:20:28, 13 December 2024)
- ML20101N185 + (09:20:28, 13 December 2024)
- ML20101N183 + (09:20:29, 13 December 2024)
- ML20101N182 + (09:20:31, 13 December 2024)
- ML20101N176 + (09:20:31, 13 December 2024)
- ML20101N175 + (09:20:32, 13 December 2024)
- ML20101N172 + (09:20:33, 13 December 2024)
- ML20101N165 + (09:20:34, 13 December 2024)
- ML20101N162 + (09:20:35, 13 December 2024)
- ML20101N160 + (09:20:36, 13 December 2024)
- ML20101N159 + (09:20:37, 13 December 2024)
- 05000352/LER-1992-010, :on 920605,north Stack wide-range Accident Monitor Discovered Inoperable & Unable to Perform Design Function Since 920507.Caused by Equipment Malfunction & Procedure Deficiency.Procedure Revised + (09:20:39, 13 December 2024)
- ML20101N150 + (09:20:40, 13 December 2024)
- 05000302/LER-1992-010, :on 920604,determined That Inadequate Level of Detail of Initial Plant Design Calculation Causes Operation Outside Design Basis.Control Transformers Replaced W/Larger Control Transformers + (09:20:42, 13 December 2024)
- RC-96-0099, Submits Response to GL 96-01, Testing of Safety-Related Logic Circuits + (09:20:43, 13 December 2024)
- U-602001, Responds to Rev 1 to Generic Ltr 92-01 Re Reactor Vessel Structural Integrity.All Reactor Vessel Beltline Matls Determined to Be Capable of Maintaining Charpy Upper Shelf Energy Above 50-ft Pounds + (09:20:44, 13 December 2024)
- ML20101N143 + (09:20:45, 13 December 2024)
- 05000302/LER-1992-011, :on 920605,failure to Install Electrical Isolation Device in Interlock Relay Branch Circuit Results in Potential Loss of Control Power to Containment Isolation Valve.Control Power Will Be Uninterrupted + (09:20:46, 13 December 2024)
- ML20101N135 + (09:20:48, 13 December 2024)
- 05000412/LER-1992-009, :on 920605,auxiliary Feedwater Pump Started, Causing Automatic Isolation of SG Blowdown & Trip of Main Feedwater Pump B.Caused by Faulty Latch Mechanism in MG-6 Relay.Latch Mechanism Adjusted + (09:20:50, 13 December 2024)
- ML20101N132 + (09:20:51, 13 December 2024)
- ML20101N131 + (09:20:52, 13 December 2024)
- RC-96-0095, Forwards Present Level of Property Insurance & Cash Flow Statement for Facility,Per 10CFR50.54(w)(3) & 10CFR140.21(e) + (09:20:53, 13 December 2024)
- ML20101N127 + (09:20:54, 13 December 2024)
- ML20101N117 + (09:20:55, 13 December 2024)
- ML20101N124 + (09:20:55, 13 December 2024)
- SNRC-1982, Identifies Changes Lipa Desires to Implement in Activities Identified in Shoreham Dp & Supplements + (09:20:56, 13 December 2024)
- ML20101N107 + (09:20:57, 13 December 2024)
- 05000341/LER-1992-020, :on 911120,HPCI Sys Start Failure Occurred During Quarterly Surveillance Test.Caused by Egr Not Responding to Signal from EG-M Control Unit.Egr Replaced + (09:20:59, 13 December 2024)