Proposed Tech Specs Re Control Rod over-travel Indication Surveillance
ML20101N185
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 04/04/1996
From:
VERMONT YANKEE NUCLEAR POWER CORP.
To:
Shared Package
ML20101N168 List:
References
NUDOCS 9604080283
Download: ML20101N185 (6)


Text

.

WNPS 3.3 LIMITING CCNDITICMS FCR 4.3 SURVEILLANCE REQUIREMENT 3 OPERATICN pcsitive coupling and the results of each test shall be recorded _J Thi;

...11 wa i= C f cheekdng cht-~

-ep:::bi'ity ;f t:..

'::: ::a^. 1

--. i nd i::ter c i.... ;-

-pric: t; ;; g ling--

- by A -W rfin g t;..

- drive -:n4-ebe r ':L ; )

  • ba

-,ye r. 9 -,.rmi j

L-1i:StfThe drive I

and blade shall

@ led anc cullysbeQi---diste. d coup 1

withdrawn.

The position and over-travel lights shall be observed.

2.

The Control Red Drive 2.

The Control Red Drive Housing Support System Housing Support System shall be in place when shall be inspected after the Reactor Ccolant reassembly and the System is pressuri:ed results of the above atmospheric inspection recorded.

pressure with fuel in the reactor vessel unless ell crerable centrol rods are fully inserted.

3.

htile the reactor is 3.

Prior to control rod below 20% pcwer, the Rod withdrawal for startup Worth Minimi:er (RhE) the Rod Worth Minimizer shall be operating while (RhE) shall be verified moving centrol rods as operable by except that:

performing the following:

(a)

If after withdrawal (a)

The Reactor of at least 12 Engineer shall control rods during verify that the a startup, the Rhh centrol red fails, the startup withdrawal sequence may continue for the Red Worth provided a second Minimizer ccmputer licensed operator is correct.

verifies that the cperater at the reactor console is following the control red program; or (b)

If all rods, except (b)

The Rod Worth those that cannot Minimi:er be moved with diagnostic test control red drive shall be performed.

Amendment No. -iHP-83 j

e' 9604080283 960404 PDR ADOCK 05000271 p

PDR

r l

VYNPS BASES:

3.3 & 4.3 CONTFCL FCC SYSTEM l

A.

Reactivity Limitatiens f

1.

Peactivity Marcin - Cere Leadir.;

l The core reactivity limitacien is a restricticn to be applied l

principally to the design of new fuel which may be leaded in the core or inte a particular refueling pattern. Satisfaction of the limitation can only be demonstrated at the time of Icading and must be such that it will apply to the entire subsequent fuel l

cycle.

At each refueling the reactivity of the core loading will i

be limited so the core can be made suberitical by at least R + 0.25% Ak with the highest worth control rod fully withdrawn l

and all others inserted. The value of R in % Ak is the amcunt by which the calculated core reactivity, at any time in the operating cycle, exceeds the reactivity at the time cf the demonstraticn.

R must be a positive quantity or cerc. The value of R shall include the potential shutdown margin loss assuming full B C settling in all inverted poison tubes present in the 4

core.

The 0.25% Ak is provided as a finite, demonstrable, sub-criticality margin.

2.

Reactivity Marcin - Inceerable Centrol Feds Specificaticn 3.3. A.2 requires that a rod be taken cut of service if it cannet be moved with drive pressure.

If a red is disarmed electrically, its position shall be consistent with the shutdewn reactivity limitation stated in Specification 3 3.a,1z This assures that the core can be shutdown at all times with the remaining centrol reds, assuming the highest worth, cperable control red does rod insert.

An allowable pattern fcr centrol rods valved cut of service will be available to the reacter The number of rods permitted to be inoperable could be cperator.

many more than the six allcwed by the Specification, particularly late in the cperatien cycle; however, the occurrence of mere than six could be indicative of a generic control rod drive problem and the reactor will be shutdewn.

Also if damage within the control red drive mechanism and in particular, cracks in drive internal hcusing, cannet be ruled out, then a generic problem affecting a number of drives cannot be ruled out.

Circumferential cracks resulting frem stress assisted intergranular corrosien have occurred in the collet housing of drives at several BWRs.

This type of cracking could occur in a number of drives and if the cracks propagated until severance of the collet housing occurred, scram could be prevented in the affected reds.

Limiting the peried of cperation with a potentially severed collet housing and requiring increased surveillance after detecting one stuck red will assure that the reactor will not be cperated with a large number of rods with failed collet housings.

B.

Centrol Pods 1.

Control red dropout accidents as discussed in the FSAR can lead ir ained, If coupling integrity is ma My to significant core damage.

accident is eliminated.

the_ possibigy of a rod dropout verprave) posvtion/ eature p-videya p@ityve cXeck/as crJy,/

f i

unegupl@ drifes mg/ readh W. s e#1 tic (._/~ Neutron l

l Instrumentation response to rod movement provides a verification that the red is follcwing its drive.

p 105Cd 6%

l N

89 Amendment No. es,'~~l '...

.. ~. -... -

.. _. -.. = -. -

4 INSERT 89A Coupling verification is performed to ensure the control rod is connected to the control rod drive mechanism and will perform its intended function when necessary. The surveillance requires verifying a centrol rod does not go to the withdrawn over-travel position. The over-travel position feature provides a positive check on the coupling integrity since only an uncoupled CRD can reach the over-travel position. The verification is required to be performed when a control rod is fully withdrawn after each refueling outage (since work on the control rod or CRD system may have affected coupling), and after each uncoupling.

I 1

i

VYNPS 3.3 LIMITING CONDITIONS FOR 4.3 SURVEILLANCE REQUIREMENTS OPERATION positive coupling and the results of each test shall be recorded. The l

drive and blade shall be coupled l

and fully withdrawn. The position and over-travel lights shall be observed.

2.

The Control Rod Drive 2.

The Control Rod Drive Housing Support System Housing Support System shall be in place when shall be inspected after the Reactor Coolant reassembly and the System is pressurized results of the above atmospheric inspection recorded.

pressure with fuel in the reactor vessel unless all operable control rods are fully inserted.

3.

While the reactor is 3.

Prior to control rod

)

below 20% power, the Rod withdrawal for startup Worth Minimizer (RWM) the Rod Worth Minimizer l

shall be operating while (RWM) shall be verified moving control rods as operable by l

except that:

performing the following:

(a)

If after withdrawal (a)

The Reactor of at least 12 Engineer shall control rods during verify that the a startup, the RWM control rod fails, the startup withdrawal sequence may continue for the Rod Worth provided a second Minimizer computer licensed operator is correct.

verifies that the operator at the reactor console is following the control rod program; or (b)

If all rods, except (b) The Rod Worth those that cannot Minimizer be moved with diagnostic test control rod drive shall be performed.

Amendment No. -39, 83

VYNPS BASES:

I l

3.3 & 4.3 CONTROL RCD SYSTEM A.

Reactivity Limitations 1.

Reactivity Marcin - Core Loading The core reactivity limitation is a restriction to be applied principally to the design of new fuel which may be loaded in the core or into a particular refueling pattern.

Satisfaction of the limitation can only be demonstrated at the time of loading and must be such that it will apply to the entire subsequent fuel cycle. At each refueling the reactivity of the core loading will be limited so the core can be made suberitical by at least R + 0.25% Ak with the highest worth control rod fully withdrawn and all others inserted. The value of R in % Ak is the amount by which the calculated core reactivity, at any time in the operating cycle, exceeds the reactivity at the time of the j

demonstration. R must be a positive quantity or zero.

The value of R shall include the potential shutdown margin loss assuming full B C settling in all inverted poison tubes present in the 4

core.

The 0.25% Ak is provided as a finite, demonstrable, sub-criticality margin.

2.

Reactivity Margin - Inoperable Control Rods i

Specification 3.3.A.2 requires that a rod be taken out of service if it cannot be moved with drive pressure.

If a rod is disarmed electrically, its position shall be consistent with the shutdown reactivity limitation stated in Specification 3 3.A.1.

This assures that the core can be shutdown at all times with the remaining control rods, assuming the highest worth, operable control rod does rod insert. An allowable pattern for control rods valved out of service will be available to the reactor operator.

The number of rods permitted to be inoperable could be many more than the six allowed by the Specification, particularly late in the operation cycle; however, the occurrence of more than six could be indicative of a generic control rod drive problem and the reactor will be shutdown. Also if damage within the control rod drive mechanism and in particular, cracks in drive internal housing, cannot be ruled out, then a generic problem affecting a number of drives cannot be ruled out.

Circumferential cracks resulting from stress assisted intergranular corrosion have occurred in the collet housing of drives at several BWRs.

This type of cracking could occur in a number of drives and if the cracks propagated until severance of the collet housing occurred, scram could be prevented in the affected rods.

Limiting the period of operation with a potentially severed collet housing and requiring increased surveillance after detecting one stuck rod will assure that the reactor will not be operated with a large number of rods with failed collet housings.

l B.

Control Rods 1.

Control rod dropout accidents as discussed in the FSAR can lead to significant core damage.

If coupling integrity is maintained, the possibility of a rod dropout accident is eliminated. Neutron instrumentation response to rod movement provides a verification that the rod is following its drive. Coupling verification is performed to ensure the control rod is connected to the control rod drive mechanism and wil_ perform its intended function when necessary.

The surveillanco requires verifying a control rod does not go to the withdrawn over-travel position. The over-travel position feature provides a positive check on the Amendment No. BO, "VY 07 131, 89

O a

VYNPS i

BASES:

3.3 & 4.3 (Cont'd) coupling integrity since only an uncoupled CRD can reach the over-travel position. The verification is required to be performed when a control rod is fully withdrawn after each t

refueling outage (since work on the control rod or CRD System may

)

have affected coupling), and after each uncoupling, j

2.

The control rod housing support restricts the outward movement of a control rod to less than 3 inches in the extremely remote event of a housing failure. The amount of reactivity which could be added by this small amount of rod withdrawal, which is less than a normal single withdrawal increment, will not contribute to any damage of the primary coolant system.

The design basis is given in Subsection 3.5.2 of the FSAR, and the design evaluation is given in Subsection 3.5.4.

This support is not required if the reactor coolant system is at atmospheric pressure since there would then be no driving force to rapidly eject a drive housing.

3.

In the course of performing normal startup and shutdown procedures, a pre-specified sequence for the withdrawal or I

insertion of control rods is followed.

Control rod dropout accidents which might lead to significant core damage, cannot occur if this sequence of rod withdrawals or insertions is followed. The Rod Worth Minimizer restricts withdrawals and j

insertions to those listed in the pre-specified sequence and provides an additional check that the reactor operator is following prescribed sequence. Although beginning a reactor I

I startup without having the RWM operable would entail unnecessary risk, continuing to withdraw rods if the RWM fails subsequently is acceptable if a second licensed operator verifies the withdrawal sequence. Continuing the startup increases core power, reduces the rod worth and reduces the consequences of dropping any rod.

Withdrawal of rods for testing is permitted with the RWM inoperable, if the reactor is suberitical and all other rods are fully inserted. Above 20% power, the RWM is not needed since even with a single error an operator cannot withdraw a rod with sufficient worth, which if dropped, would result in anything but minor consequences.

4.

Refer to the Vermont Yankee Core Performance Analysis report.

5.

The Source Range Monitor (SRM) system has no scram functions.

It does provide the operator with a visual indication of neutron level.

The consequences of reactivity accidents are a function of the initial neutron flux. The requirement of at least three counts per second assures that any transient should it occur, begins at or above the initial value of 10-8,of rated power used in the analyses of transients from cold conditions. One operable SRM channel is adequate to monitor the approach to criticality, therefore, two operable SRM's are specified for added conservatism.

l 6.

The Rod Block Monitor (RBM) is designed to automatically prevent i

fuel damage in the event of erroneous rod withdrawal from loca-l tions of high power density during high power level operation.

l During reactor operation with certain limiting control rod patterns, the withdrawal of a designated single control rod could result in one or more fuel rods with MCPR less than the fuel cladding integrity safety limit.

During use of such patterns, it is judged that testing of the RBM system prior to withdrawal of such rods will provide added assurance that improper withdrawal does not occur.

It is the responsibility of the Nuclear Engineer i

to identify these limiting patterns and the designated rods either when the patterns are initially established or as they develop due to the occurrence of inoperable control rods.

Amendment No. G6, 39, 61, VO, 90 i