Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20113D471 + (05:18:01, 13 December 2024)
- ML20113D470 + (05:18:02, 13 December 2024)
- ML20113D466 + (05:18:03, 13 December 2024)
- ML20113D461 + (05:18:03, 13 December 2024)
- ML20113D460 + (05:18:04, 13 December 2024)
- ML20113D450 + (05:18:05, 13 December 2024)
- ML20113D443 + (05:18:05, 13 December 2024)
- ML20113D438 + (05:18:06, 13 December 2024)
- W3P84-3360, Verifies That Design,Const & Testing Essentially Completed. Unit Ready to Load Fuel.List of Items That Will Be Completed During Low Power Testing & Prior to Exceeding 5% Power Encl + (05:18:07, 13 December 2024)
- ML20113D429 + (05:18:08, 13 December 2024)
- 05000334/LER-1996-008, :on 960531,reactor Trip Occurred.Caused by Test Circuit Applying More Test Current than Amount Required to Test Solenoid Coil.Performed Mod to Reduce Test Current for This Circuit to Lowest Practical Value + (05:18:10, 13 December 2024)
- ML20113D420 + (05:18:11, 13 December 2024)
- ML20113D413 + (05:18:12, 13 December 2024)
- ML20113D417 + (05:18:12, 13 December 2024)
- ML20113D409 + (05:18:13, 13 December 2024)
- ML20113D401 + (05:18:14, 13 December 2024)
- ML20113D398 + (05:18:15, 13 December 2024)
- ML20113D400 + (05:18:15, 13 December 2024)
- ML20113D386 + (05:18:16, 13 December 2024)
- ML20113D385 + (05:18:17, 13 December 2024)
- 05000370/LER-1984-032, :on 841205,notification Received of Event at Korean Unit 5 Re CRD Mechanism Design Similar to Mechanism Installed at Facility.Safety Implications of Continued Operation Evaluated & Interim Actions Taken + (05:18:18, 13 December 2024)
- RBG-20568, Responds to NRC Re Violations Noted in Insp Rept 50-458/84-38.Corrective Actions:Testing of Emergency Diesel Generators a & B Will Be Completed on 850417 Using Test Procedures SST-24-1 & SST-24-2,respectively + (05:18:19, 13 December 2024)
- ML20113D366 + (05:18:20, 13 December 2024)
- ML20113D358 + (05:18:21, 13 December 2024)
- ML20113D365 + (05:18:21, 13 December 2024)
- ML20113D351 + (05:18:22, 13 December 2024)
- GO2-83-959, Forwards Updated Const Status Repts as of 830930.One Oversize Figure Encl.Aperture Card Available in PDR + (05:18:23, 13 December 2024)
- ML20113D349 + (05:18:23, 13 December 2024)
- W3P85-0151, Informs of Delay of Approx 10 Days in Achieving Mode 4 (Hot Shutdown) Milestone Event.Delay Due to Replacement of Reactor Coolant Pump Seals & Rework of in-core Detector Thermocouple Cables.Operation Date of 850108 Unchanged + (05:18:24, 13 December 2024)
- ML20113D334 + (05:18:25, 13 December 2024)
- ML20113D330 + (05:18:25, 13 December 2024)
- ML20113D327 + (05:18:26, 13 December 2024)
- RBG-20632, Forwards marked-up FSAR Figure 13.1-5,representing Shift Compliment.Figure Will Be Included in Future FSAR Amend, Providing Option to Use Separate Shift Technical Advisor If No Shift Senior Reactor Operator Qualified + (05:18:27, 13 December 2024)
- ML20113D323 + (05:18:28, 13 December 2024)
- ML20113D322 + (05:18:28, 13 December 2024)
- ML20113D319 + (05:18:29, 13 December 2024)
- ML20113D317 + (05:18:30, 13 December 2024)
- ML20113D314 + (05:18:34, 13 December 2024)
- ML20113D316 + (05:18:34, 13 December 2024)
- B15777, Special Rept:On 960528,Train B Emergency Diesel Generator Failed.Caused by Low Lube Oil Pressure.Instituted Procedural Changes Re Low Lube Oil Pressure During Strainer Swaps + (05:18:35, 13 December 2024)
- ML20113D312 + (05:18:35, 13 December 2024)
- ML20113D301 + (05:18:36, 13 December 2024)
- ML20113D296 + (05:18:37, 13 December 2024)
- ML20113D297 + (05:18:37, 13 December 2024)
- ML20113D290 + (05:18:38, 13 December 2024)
- ML20113D289 + (05:18:39, 13 December 2024)
- ML20113D285 + (05:18:39, 13 December 2024)
- TXX-4431, Responds to 841005 Request for Addl Info Re Final Draft Tech Specs.Util Will Participate in Industry Resolution of Five Listed Concerns.Answers to Questions & marked-up Tech Specs Encl + (05:18:43, 13 December 2024)
- ML20113D279 + (05:18:44, 13 December 2024)
- ML20113D273 + (05:18:45, 13 December 2024)
- ST-HL-AE-1223, Forwards Complete Attachment 2 of Util Responding to Environ & Hydrologic Engineering Branch Request for Addl Info + (05:18:46, 13 December 2024)
- W3P84-2899, Responds to IE Bulletin 84-03 Re Evaluation of Potential for & Consequences of Refueling Cavity Water Seal Failure. Failure of Refueling Cavity Water Seal Cannot Occur at Plant Because of Different Seal Design.Seals Noninflatable + (05:18:47, 13 December 2024)