Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ST-HL-AE-1230, Nuclear Training Program + (04:18:23, 13 December 2024)
- ML20115F933 + (04:18:23, 13 December 2024)
- ML20115F928 + (04:18:24, 13 December 2024)
- ML20115F915 + (04:18:25, 13 December 2024)
- PY-CEI-NRR-0230, Advises That NRC Review of Generic SPDS in 841218 Draft SER for GESSAR-II SPDS Applicable to Facilities,Per Util 850321 Response to Addl NRC Questions + (04:18:25, 13 December 2024)
- ML20115F911 + (04:18:26, 13 December 2024)
- ML20115F893 + (04:18:27, 13 December 2024)
- 05000285/LER-1992-019, :on 920531,indication Received That CEA 35 Dropped Into Reactor Core Resulting in Plant Shutdown,Due to Clutch Coil Failure.Util Will Verify Whether Resistor Is Installed in Series W/Cea 35 Clutch Coil + (04:18:33, 13 December 2024)
- ML20115F882 + (04:18:34, 13 December 2024)
- ML20115F872 + (04:18:35, 13 December 2024)
- ML20115F856 + (04:18:36, 13 December 2024)
- ML20115F854 + (04:18:36, 13 December 2024)
- ML20115F853 + (04:18:37, 13 December 2024)
- LIC-96-0096, Monthly Operating Rept for June 1996 for Fort Calhoun Station Unit 1 + (04:18:38, 13 December 2024)
- U-602610, Monthly Operating Rept for June 1996 for Clinton Power Station Unit 1 + (04:18:38, 13 December 2024)
- NG-92-4781, Monthly Operating Rept for Sept 1992 for Duane Arnold Energy Ctr + (04:18:39, 13 December 2024)
- ML20115F818 + (04:18:40, 13 December 2024)
- ML20115F823 + (04:18:40, 13 December 2024)
- TXX-4459, Informs of Continuing Effort to Assure Design of Plant Adequate for Safety.Info Re Qualification of Piping & Supports Provided.Meetings to Discuss Util Comprehensive Program for Licensing Issues Requested + (04:18:41, 13 December 2024)
- ML20115F801 + (04:18:42, 13 December 2024)
- TXX-4454, Significant Deficiency Rept SDAR-172 Re Drawing Requirements That No Tube Fittings Be Installed Between Two 45 Degree Bends in Instrumentation Tubing.Installations Will Be Reinspected & Tube Length Will Be Reduced to 8 Inches + (04:18:48, 13 December 2024)
- ML20115F785 + (04:18:48, 13 December 2024)
- ML20115F775 + (04:18:49, 13 December 2024)
- 3F0796-03, Forwards Action Plan to Upgrade Design of Post-Accident Monitoring Instrumentation + (04:18:50, 13 December 2024)
- ML20115F769 + (04:18:50, 13 December 2024)
- ML20115F765 + (04:18:51, 13 December 2024)
- B15771, Forwards Rev 9 to Updated FSAR in Form of Replacement Pages. Rev Accurately Presents Changes Completed Since Previous Submittal,Per 10CFR50.71(e)(2)(i).Addendum to Annual Rept Dtd 960228,also Encl + (04:18:52, 13 December 2024)
- ML20115F748 + (04:18:52, 13 December 2024)
- ML20115F740 + (04:18:53, 13 December 2024)
- B15772, Addendum to Mnps,Units 1,2 & 3 Annual Rept for 1995 Millstone Unit 2 Section + (04:18:54, 13 December 2024)
- ML20115F736 + (04:18:54, 13 December 2024)
- ML20115F730 + (04:18:55, 13 December 2024)
- ML20115F728 + (04:18:56, 13 December 2024)
- ML20115F726 + (04:18:56, 13 December 2024)
- ML20115F723 + (04:18:57, 13 December 2024)
- ML20115F708 + (04:18:58, 13 December 2024)
- ML20115F721 + (04:18:58, 13 December 2024)
- ML20115F702 + (04:18:59, 13 December 2024)
- ML20115F693 + (04:18:59, 13 December 2024)
- ML20115F690 + (04:19:00, 13 December 2024)
- BSEP-85-0404, Monthly Operating Repts for Feb 1985 + (04:19:01, 13 December 2024)
- ML20115F648 + (04:19:01, 13 December 2024)
- ML20115F646 + (04:19:02, 13 December 2024)
- 05000338/LER-1992-012-01, :on 920925,determined That Two Ci Instrument Air Supply Trip Valves Not Tested Per TS 4.6.3.1.2.(a),due to Personnel Error.Changes to Periodic Test Procedure Will Be Made During Next Refueling Outage + (04:19:09, 13 December 2024)
- 1CAN038506, Monthly Operating Rept for Feb 1985 + (04:19:10, 13 December 2024)
- ML20115F626 + (04:19:16, 13 December 2024)
- ML20115F618 + (04:19:19, 13 December 2024)
- ML20115F614 + (04:19:20, 13 December 2024)
- ML20115F608 + (04:19:20, 13 December 2024)
- 05000528/LER-1985-012, :on 850312,two Channels of Low Steam Generator Pressure Signals Spuriously Actuated,Resulting in All Four Breakers to Reactor Trip Switchgear Opening.Cause Unknown + (04:19:27, 13 December 2024)
- 05000237/LER-1985-013-02, :on 850310,ATWS Alternate Rod Insertion Initiated.Caused by Leaking Isolation Valve Which Allowed Hydrostatic Pressure to Bleed Into One Side of Level Diaphragm Causing Low Level Condition + (04:19:34, 13 December 2024)