Monthly Operating Rept for Feb 1985
ML20115F693
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 02/28/1985
From: Climer, Will Smith, Svensson B
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8504190630
Download: ML20115F693 (9)


Text

_ _ _ _ _ _ _ _ - - _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

l n o

~ '

N.R.C. OPERATING DATA REPORT DOCKET NO. 50-315

~"

DATE 3/1/35 COMPLETED BY CLIMER TELEPHONE 616-465-5901 OPERATING STATUG -

1. Unit Name D. C. Cook Unit 1 -----------------------
2. Reporting PerioJ Feb. G5 Inotes i
3. Licensed Thermal Power-(MWt) 3250 i I

~~

4. Name Plata Rating (Gross MWe) 1152 ! -
5. Design Electrical Rating (Net MWe) 1030 : i
6. Maximum Dependable Capacity (GROSS MWo) 1056 ! 1
7. Maximum Dependable Capacity (Net MWo) 1020 --- -
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons __________________________________________
9. Power.Lovel To Which Routricted. IF Any (Net MWe) _________________
10. Reasons For Restrictions. If Any -_--__-__..____--_______--_____-_

This Mo. Yr. to Date Cumm.

11. Hours in Reporting Period 672.0 1416.0 09000.0
12. No. of Urn. Reactor Wan Critical 672.0 1001.6 66695.4

~13. Reactor Ruserve Shutdown Hours 0.0 0.0 463.0 1<4.-Hours Generator on Lino 672.0 909.0 65351.3

15. Unit Reserve Shutdown Hours 0.0 0.0 321.0
16. Oross Therm. Energy Gen. (MWH) 2075041 2775517 192557090
17. Oromu Elect. Courgy Gen. (MWH) 675900 G97750 62669640
18. Net Elect. Energy Gen. (MWH) 631770 062052 60290447

'19.lunit Servico Factor .100.0 69.9 75.1

20. Unit Availability Factor 100.0 69.9 75.1
21. Unit Capacity Factor (MDC Net) 95.1 59.7 60.0
22. Unit Capacity Factor (DER Net) 94.2 59.1 65.4
23. Unit Garced Outage Rato 0.0 0.0 7.3
24. Shutdowns Scheduled over Neitt Dix Months (Type,Date,and Duration):

lo._ year. outage._tenatively.. scheduled._to..atar.t.. April.. Oi..19.8_L.__--

. Duration approximately.120 .. days.----------- ------------- ----_-

25. If Shut Dawn At End of Report Period, Estimated Date of Startups
26. Units in Tnnt Status (Prior to Commercial Operation):

Forcant Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION I

I

. . 's AVERAGE DAILY POWER LEVEL' (MWe-Net)

DOCKET NO. 50-315 UNIT ONE DATE 3/1/85 COMPLETED BY CLIMER TELEPHONE bi6-465-5901 MONTH Feb. 85 AVERAGE DAILY AVERAGE DAILY DAY POWER LEVEL DAY POWER LEVEL 1 1022 17 1024 2 1021 18 1025 3 1015 19 1024 4 717 20 1023 5 690 21 1026 6 679 22 1022 7 727 23 1026 8 803 24 1025 9 1025 25 1024 10 1025 26 1025 11 1025 27 1024 12 1022 20 1022 13 1024 29 0 14 1026 30 0 15 1024 31 0 16 1023

. ~ .-.

-en.

hammm.- ___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ________m_______ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ . _ .__. ___._ _ _ _ . _ _ ___.____2

i BlOCKET NO. 50-315 ilNIT SIRJIlMlWNS ANin POWEM kEl>UCTIONS UNIT NAME D.C. Cook Unit 1 IBATE 3-9-85 February, 1985 COMPI ETEli NY B.A. Svensson HLPORT M ONill - TEllPilONE 616/465-5901 N. e . Date g

.$E 3g

};; )E j E a:

liensec livent

,E,t Qy n f*3 Cause & Causective Acsiini tas in O ' Psevent Hecusreiice 6 y$ cli j gy, g Nep.wI #

6 243 850203 F 0 B 4 N.A. HC HTEXCH Reactor powcr was reduced to 70% for

- main turbine condenser tube leak checks., Several leaking tubes were plugged. Reactor power was returned to 100% on 850208.

j 4

I 2 3 4 17: I uccJ Heas.m: Metheal: Eminbit G - Inssanctiims S. Stheilule.1 A liiphpnicr.: l'ailine (1 aptain) 1-Mannat fin l'scpasatinus of Data

- H Maintenance in: Tess 2-Mainial Sciani. Entey Slicens fin 1.icensec

! O Hefucibig 3 Autonialic Stvani. I!vens Hepini(1 l'H)l'ile INilHl'.G-l D Hegulainiy Hesinicciani -l Oilies (limplabel 01til n li Opesasos Isahnng A Iiccesse I manninati.us l 5 ILAiladuissoasive G Op sala mal Laso llixplahin lixhibit I - Sanic Souice l'

l's/ll) II Othes (lisplain) l 1

., n' h

. Dockst No.: 50-315 Unit Namn D.C. Cook Unit 1 Completed By: A. S. Puplis Telephone: (616) 465-5901 Date: March 11, 1985 Page: 1 of 3 MONTHLY OPERATING ACTIVITIES - FEBRUARY, 1985 HIGHLIGHTS:

'The reporting period began and ended with the Unit in Mode 1 at 100% rated thermal power. The Unit operated continuously during the reporting period with the major power reductions required to remove condenser halves from service to check for condenser tube leaks.

Gross electrical generation for the month was 675,980 MWH.

Summary:

2-03-85' At 1952 reactor power was decreased to 70% to remove "A" South main condenser half from service for tube leak checks.

2-04-85 At 2318 while power was at 70%, "A" South main condenser half was returned to service and "C" North main con-denser half removed from service for tube leak checks.

2-06-85 At 0027 "C" North condenser half was returned to service; at 0037 "C" South condenser half was removed from service for tube leak checks.

2-06-85 At 1743 "C" South condenser half was returned to service; at 1755 "A" North condenser half was removed from service for tube leak checks.

2-07-85 At 0325 "A" North condenser half returned to service.

One tube was plugged. At 0340 "B" North condenser half was removed from service.

2-07-85 At.0345 reactor power was increased to 80%.

2-07-85 At 1507 reactor power was decreased from 80% to 70% to remove "B" North main condenser half from service to inspect for tube leaks. "B" North was returned to service at 1952.

2-07-85 At 2019 "A" North condenser half was removed from service to inspect for tube leaks.

5

. Dockst No.: 50-315 Unit Namas D.C. Cook Unit 1 Completed By: A. S. Puplis Telephone: (616) 465-5901 Date: March 11, 1985 Page 2 of 3 2-08-85 At 0342 "A" North condenser half was restored to service. At 0425 "B" South condenser half was removed from service.

2-08-85 At 0800 started increasing reactor power. Stopped increase at 74% at 1008. At 1420 began increasing reactor power to 100%.

2-08-85 At 1430,"B" South ccndenser was restored to service.

2-08-85 At 1920, reactor power reach 6d 100%.

2-11-85 At 0710 the Turbine Driven Auxiliary Feedwater Pump was declared inoperable, due to an air leak on the trip and throttle valve causing the valve to go wide open.

2-11-85 At 1450 the TDAFP was declared operable after the air k leak was repaired.

2-16-85 At 1915 "C" South condenser half was removed from service for leak checks. At 0024 "C" South was re-turned-to service.

2-22-85 At 1105 the control room ventilation system was de-clared inoperable.

At 1200 at Unit shutdown was commenced.

At 1201 the NRC was notified.

At 1216 the power decrease was halted at 99% and power held while the control room ventilation system problem was being reviewed.

At 1654 the control room ventilation system was de-clared operable. At 1655 the NRC was notified.

At 1656 reactor power increase to 100% was start and was reached at 1830.

2-26-85 At 1628 the TP7dP was declared inoperable because the trip and throttle valve would not latch. Later at 2023 the TDAFP was declared operable.

t-n - . . . .

n -

~

. e-

.,.. . . .. Dockst No.: 50-315 Unit N2 mas D.C. Cook Unit 1 Completed By: A. S. Puplis Telephone: (616) 465-5901 Date: March 11, 1985 Page: 3 of 3 2-27-85 At 0623, the "E" Containment Spray Pump was inoperable to repair weld leak on eductor line.

2-28-85 At 0705 "E" CTS. pump declared operable.

2-28-85 At 1442 Control Room cable vault CO2 was operable.

At the close of-the reporting period the Control Room CO2 system was operable while the Control Room Cable Vault Halon System remains inoperable.

NOTE: The monthly Operating Activities Report for January, 1985 incorrectly stated that the Control Room CO 2 System remains operable. The system was removed from service on January 7, 1985, to install a design change.

The. system was inoperable from January 7, 1985, to February 26, 1985. Compliance with the Technical Specification Action Statement was maintained during this period..

~

E~ , ,

V.. 4 ,

s.'

  • . :e-DOCKET NO.- 50 - 315 UNIT NAME D. C. Cook - Unit No. 1 DATE 3-9-85 COMPLETED-BY B. A. Svensson TELEPHONE (616) 465-5901 PAGE 1 of.1 MAJOR SAFETY-RELATED MAINTENANCE ~

' FEBRUARY, 1985 M--l Investigated No. 2 RCP motor to determine reason for high

' break-away_ torque when attempting to rotate the shaft manu-ally. Removal of the flywheel exposed the oil pot, revealing 1 a broken oil lift'line. The line was secured using a new fitting and-the motor reassembled. . Break-away torque was ~

checked with the oil lift system in service and found to be within acceptable limits.

M-2 Repaired leak at 2 inch socket weld in the East Containment Spray _ Pump eductor line connection to the spray pump suction line. A hydrostatic test was performed to verify weld repair integrity.

+-

e

(

,~

m

' h _, **

i; * * ;

_= .

ysterra . . NOMMA & MICHIGAN ELECTRIC COMBRMX Donald C. Cook Nuclear Plant P.O. Som 458. Bndgman, Mchgan 49106 March 9, 1985 Director, Office Of Management Information and Program Control U. S. Nuclear Regulatory Commission

' Washington, D. C. 20555 Gentlemen:

Pursuant to the requirements of Donald C. Cook Nuclear Pla.nt Unit 1 Technical Specification 6.9.1.6, the attached Monthly Operating Report for the Month of February, 1985 is submitted.

Sincerely, lAA/ '

W. G. Smith, r.

Plant Manager WGS:ab Attachments cc: J. E. Dolan M. P. Alexich

~

R. W. Jurgensen NRC Region III B. L. Jorgensen R. O. Bruggee-(NSAC)

R. C. Callen

'S. J. Mierzwa R. F. Kroeger

-B. H. Bennett' P.~D. Rennix

'J. H. Hennigan-Z.. Cordero J. J. Markowsky J. F. Stietzel