Special Rept 85-03:on 850313,four Fire Barriers Inoperable in Excess of 7 Days.Caused by Insufficient Matl Available to Complete Mod.Hourly Fire Watch Established.Mod Expected to Be Complete by 850419
ML20115F646
Person / Time
Site: Sequoyah 
Issue date: 04/12/1985
From: Wallace P
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
RO-85-03, RO-85-3, NUDOCS 8504190609
Download: ML20115F646 (2)


Text

G a

TENNESSEE VALLEY AUTHORITY Sequoyah Nuclear Plant Post Office Box 2000 Soddy Daisy, Tennessee 37379

. April 12, 1985 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC. 20555 Gentlemen:

TENNESSEE VALLEY AUTHORITY - SEQUOYAH NUCLEAR PLANT UNIT 2 - DOCKET.NO.

50-328 - FACILITY OPERATING LICENSE DPR SPECIAL REPORT 85-03 The enclosed special report.provides details concerning the inoperability of four fire barriers in excess of seven days. This event is reported in accordance with Sequoyah Unit 2 Technical Specifications 3.7.12 and 6.9.2.

Very truly yours, TENNESSEE VALLEY AUTHORITY D,%. &

P. R. Wallace Plant Manager Enclosure cc '(Enclosu're) :

J. Nelson Grace, Regional Administrator U.S. Nuclear' Regulatory Commission Suite 2900 101 Marietta Street, NW Atlanta, Georgia 30323 Records Center Institute of Nuclear Power Operations Suite 1500 1100 circle 75 Parkway Atlanta, Georgia 30339 NRC Inspector, NUC PR, Sequoyah hh2 ADOC PDR U

I)j g

1983-TVA SOTH ANNIVERSARY An Equal Opportunity Employer

C 4',

SEQUOYAH NUCLEAR PLANT UNIT 2 SPECIAL REPORT 85-03:

~

On March 13,.1985, with unit 1 in mode.1 (100 percent power, 2235' psig, 578 degrees F) the following fire barrier penetrations were opened:

Auxiliary. Building elevation 669 valve gallery to Boric Acid Room A.

a.

- b. - Auxiliary Building elevation 669_ Boric Acid Room A to Boric Acid Room B.

Auxiliary Building elevation 669 Boric Acid Room B to the Hot Tool Room.

c.

d.

Auxiliary Building elevation 669 Hot Tool Room to the Holdup Tank Room.

~

.5These six-inch pipe penetrations were opened to allow modifications to the heat tracing (circuit 32S)' of _the boric acid piping. This modification will increase the life expectancy. of the heat tracing and, therefore, reduce repairs and subscquent penetration breaches needed to effect repairs. While these modifications were underway, heat trace circuit 32P became inoperable due to a short circuit,'and.the decision was made to proceed with similar modifications to this circuit. Because-of the increase in the scope of the work involved, insufficient material was available to complete the modifica-tions. This-delay resulted in the subject penetrations being open for more -

than the seven days prescribed by Technical Specification 3.7.12.

-Based on the existing procurement schedule, modifications are expected to be complete and_the penetrations closed-by-April 19, 1985. - The hourly fire watch estab-f lished when the pentrations were first breached will continue until the

' penetrations are closed.