Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20116B039 + (03:57:58, 13 December 2024)
- PY-CEI-NRR-2075, Informs of Withdrawal of 941221 Amend Requests,Involving Rev of TS 3/4.3.7.7 & 961102,involving Rev of TS 3/4.8.3.1 + (03:57:59, 13 December 2024)
- ML20116B024 + (03:58:00, 13 December 2024)
- ULNRC-03403, Informs Commission of Implementation of Amend 112 to License NPF-30,revising TS 3/4.8 & Associated Bases to Improve Overall EDG Reliability & Availability + (03:58:01, 13 December 2024)
- RBG-37626, Responds to Questions Re Seismic Qualification of thermo-lag Fire Barriers,Per 920924 NRC Visit + (03:58:02, 13 December 2024)
- ML20116B007 + (03:58:03, 13 December 2024)
- ML20116A991 + (03:58:03, 13 December 2024)
- 05000528/LER-1985-018, :on 850305,diesel Generator a Failed to Attain Required Voltage Frequency & Determined Inoperable.On 850308,diesel Generator B Declared Inoperable.Caused by Invalid Surveillance Test.Test Modified + (03:58:06, 13 December 2024)
- ML20116A971 + (03:58:10, 13 December 2024)
- ML20116A967 + (03:58:11, 13 December 2024)
- ML20116A960 + (03:58:13, 13 December 2024)
- PY-CEI-NRR-2078, Withdraws Request Dtd 960626,that Requirements for Position of Perry Nuclear Assurance Dept Director as Delineated in Chapter 17.2 of USAR Be Changed.Encl Provides Details & Bases for Deviation Proposed in Lieu of USAR Change + (03:58:20, 13 December 2024)
- ML20116A950 + (03:58:20, 13 December 2024)
- 3F0796-15, Forwards Response to RAI Re GL 95-03, Circumferential Cracking of Steam Generator Tubes + (03:58:21, 13 December 2024)
- PY-CEI-NRR-2079, Submits Organization Change Involving Nuclear Training & Qa. Review of Change Requested Per Provisions of 10CFR5.054(a)(3) + (03:58:22, 13 December 2024)
- ML20116A929 + (03:58:23, 13 December 2024)
- ML20116A927 + (03:58:24, 13 December 2024)
- 05000366/LER-1984-030, :on 841115,29 & 850313,determined That Listed Functional Tests of Plant Equipment Not Performed Per Tech Specs.Caused by Personnel Error.Procedures Will Be Revised + (03:58:26, 13 December 2024)
- ML20116A922 + (03:58:28, 13 December 2024)
- ML20116A921 + (03:58:29, 13 December 2024)
- ML20116A912 + (03:58:29, 13 December 2024)
- ML20116A910 + (03:58:30, 13 December 2024)
- 05000254/LER-1992-024-02, :on 920923,discovered That Valve 1-1601-23, Drywell Vent Valve Closed Due to Personnel Error.Licensee Plans to Make Changes to Scaffolding Construction Process.W/ + (03:58:33, 13 December 2024)
- RBG-20660, Interim Deficiency Rept DR-280 Re Reliance Class RM Motors for Limitorque Motor Operated Valve Actuators.Interim or Final Rept Expected by 850529 + (03:58:34, 13 December 2024)
- ML20116A890 + (03:58:35, 13 December 2024)
- ML20116A888 + (03:58:36, 13 December 2024)
- ML20116A886 + (03:58:37, 13 December 2024)
- ML20116A883 + (03:58:38, 13 December 2024)
- ML20116A880 + (03:59:27, 13 December 2024)
- ML20116A879 + (03:59:30, 13 December 2024)
- ML20116A873 + (03:59:31, 13 December 2024)
- ML20116A872 + (03:59:32, 13 December 2024)
- ML20116A868 + (03:59:33, 13 December 2024)
- ML20116A859 + (03:59:34, 13 December 2024)
- ML20116A853 + (03:59:36, 13 December 2024)
- 05000237/LER-1984-019, :on 841206,w/unit in Refuel & Inservice Insp in Progress,Welds Located in Reactor Water Cleanup Sys Identified as Having Rejectable Indications.Welds Repaired by Weld Overlay or Pipe Replacement + (03:59:38, 13 December 2024)
- ML20116A829 + (03:59:39, 13 December 2024)
- ML20116A751 + (03:59:40, 13 December 2024)
- ML20116A744 + (03:59:41, 13 December 2024)
- ML20116A723 + (03:59:42, 13 December 2024)
- ML20116A702 + (03:59:43, 13 December 2024)
- 3F1092-10, Withraws 910815 TS Change Request 190 to License DPR-72, Proposing Addition of New Action to Containment Air Lock Spec.Change No Longer Appropriate Since Facility Lead Plant Implementation Scheduled to Occurr in 1993 + (03:59:43, 13 December 2024)
- ML20116A637 + (03:59:49, 13 December 2024)
- RBG-20661, Interim Deficiency Rept DR-267 Re GE Optical Isolators. Interim or Final Rept Will Be Submitted by 850508 + (03:59:50, 13 December 2024)
- ML20116A626 + (03:59:52, 13 December 2024)
- RBG-20663, Interim Deficiency Rept DR-156 Re GE Conductivity Cells & Indicators.Interim or Final Rept Will Be Submitted by 850507 + (03:59:53, 13 December 2024)
- 05000336/LER-1996-020, :on 960401,determined Potential Loss of RBCCW Inventory Through Primary Water make-up Line.Caused by Original Design Deficiency.Implemented Permanent Design Change + (03:59:55, 13 December 2024)
- 05000301/LER-1992-004-02, :on 920926,reactor Manually Tripped During Hot CR Drop Testing Due to Unexpected CR Buttom Indications. Caused by Lack of Communication.Cr Testing Terminated. Procedure Resp 1.1 Will Be Revised + (03:59:58, 13 December 2024)
- ML20116A594 + (04:00:03, 13 December 2024)
- ML20116A583 + (04:00:04, 13 December 2024)
- ML20116A573 + (04:00:05, 13 December 2024)