Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20212F8831999-09-21021 September 1999 Application for Amend to License NPF-42,proposing to Modify Effective Full Implementation Date for Amend 120 from 991231 to 000630 ML20209D3561999-07-0808 July 1999 Application for Amend to License NPF-42 to Revise Allowable Value for CTS Table 3.3-4,functional Unit 8.a.,4 Kv Undervoltage - Loss of Voltage & Functional Unit 8.b.,4 Kv Undervoltage - Grid Degraded Voltage.Se & Nshc,Encl ML20209C2001999-06-30030 June 1999 Application for Amend to License NPF-42 for Temporary Change to CTS Without Action to Reduce Power ML20195G0211999-06-11011 June 1999 Application for Amend to License NPF-42,revising TS 3.7.1.6 & Associated Bases.Proposed Change Would Modify LCO to Require Four ARVs to Be Operable;Eliminate Use of Required in Action Statements;Add New Action for Three or More ARVs ML20195F7801999-06-10010 June 1999 Application for Amend to License NPF-42,proposing to Revise Z,S & Allowable Value Terms for Current TS Table 3.3-4, Functional Unit 7.b,automatic Switchover to Containment Sump (RWST Level - Low-Low) ML20207L0401999-03-0505 March 1999 Suppl 1 to 970515 Application for Amend to License NPF-42 Incorporating Changes to WCGS TSs & Adding License Conditions to Address Surveillance Requirements.Suppl Submits Mods Submitted to NRC During Review Process ML20199G7211999-01-15015 January 1999 Application for Request of Partial Issuance of Amend to License NPF-42,proposing TS SR Be Revised to Delete During SD Requirement & Reflect Appropriate Plant Conditions in Associated 3/4.7.3 Bases ML20199F4411999-01-12012 January 1999 Application for Amend to License NPF-42,to Revise TS 3/4.7.5 by Adding New Action Statement Requiring Verification of Operability of Two RHR Trains,Or Initiation of Power Reduction with Only One RHR Train Operable ML20198P1161998-12-29029 December 1998 Application for Amend to License NPF-42,revising Tech Specs to Incorporate Revised RCS Heatup & Cooldown Limit Curves & Revised Cold Overpressure Mitigation Sys (COMS) PORV Setpoint Limit Curve ML20195E5421998-11-10010 November 1998 Suppl Application for Amend to License NPF-42,transferring Control of Kg&E & Kansas Power & Light Possessory Ownership Interests to Westar Energy,Inc ML20155C4481998-10-26026 October 1998 Application for Amend to License NPF-42,transferring Kansas Gas & Electric Co & Kansas City Power & Light Co Interest in Operating Subject License for WCGS & Reflecting Transfer of Ownership ML20154S5651998-10-23023 October 1998 Application for Amend to License NPF-42,revising TS 3.5.1 by Increasing AOT in Action B. to 24 Hours in Lieu of Current AOT of One Hour ML20236R4711998-07-17017 July 1998 Application for Emergency Amend to License NPF-42 Revising TS 3/4.7.5, UHS, by Adding New Action Statement ML20247F8551998-05-0808 May 1998 Application for Amend to License NPF-42,revising TS 3/4.3.2, Table 3.3-3,ESF Actuation Sys Instrumentation ML20216J8151998-03-20020 March 1998 Application for Amend to License NPF-42,increasing Spent Fuel Storage Capacity & Max Nominal Fuel Enrichment to 5.0 W/O (Nominal Weight Percent) U-235.Proprietary & non-proprietary Holtec Repts,Encl.Proprietary Encl Withheld ML20202D1171998-02-0404 February 1998 Application for Amend to License NPF-42,revising TS 3/4.2.4, Quadrant Power Tilt Ratio & Associated Bases, to Clarify Required Actions for Limiting LCO & Other Change Consistents W/Ts Conversion Application Previously Submitted ML20202C4501998-02-0404 February 1998 Application for Amend to License NPF-42,revising Tech Specs 3/4.3, Changes to ESFAS Functional Units 6.f,8.a & 8.b ML20199H3431998-01-28028 January 1998 Application for Amend to License NPF-42,revising TS 6.3 & 6.12 to Reflect Position Change within Organization ML20198Q4321997-11-0606 November 1997 Application for Amend to License NPF-42,revising TS Sections 3/4.8.1,3/4.8.2 & 3/4.8.3 Re Installation of Spare Battery Chargers ML20217K2121997-10-17017 October 1997 Application for Amend to License NPF-42,revising TS Surveillance Requirements 4.5.2b & Associated Bases Re Requirement to Vent ECCS Pump Casings ML20216F7121997-09-0606 September 1997 Application for Amend to License NPF-42,alleviating Need for Enforcement Discretion Granted by NRC on 970905 ML20216D1471997-09-0202 September 1997 Application for Amend to License NPF-42,adding Requirements for Essential Svc Water Flowpaths to Turbine-Driven Auxiliary Feedwater Pump ML20196J3991997-07-29029 July 1997 Application for Amend to License NPF-42,revising Wording of Action Statement 5a to TS Table 3.3-1, Reactor Trip Sys Instrumentation ML20141G7641997-07-0303 July 1997 Application for Amend to License NPF-42,incorporating Addl Info Into TS 6.9.1.9, Colr ML20141F4361997-05-15015 May 1997 Application for Amend to License NPF-42,requesting Approval of Full Conversion of TS from Current to Set Based Upon Improved Std Ts,Per NUREG-1431 ML20138B9011997-04-23023 April 1997 Application for Amend to License NPF-42,revising TS 3/4.9.4, Containment Bldg Penetrations & Associated Bases Section to Allow Selected Containment Isolation Valves to Be Opened Under Administrative Controls During Core Alterations ML20137X3211997-04-15015 April 1997 Suppl to Application for Amend to License NPF-42,requesting TS 6.8.5.b, Reactor Coolant Pump Flywheel Insp Program ML20147F8121997-03-21021 March 1997 Application for Amend to License NPF-42,revising Tech Specs 6.8.5b Re Reactor Coolant Pump Flywheel Insp Program to Provide Exception to Exam Requirements in Reg Guide 1.14,Rev 1, Reactor Coolant Pump Flywheel Integrity ML20137B9311997-03-18018 March 1997 Application for Amend to License NPF-42,revising TS Section 5.3.1,fuel Assemblies to Allow Use of Alternate Zr Based Fuel Cladding Matl ZIRLO ML20137B8971997-03-18018 March 1997 Application for Amend to License NPF-42,revising TS SR 4.5.2.c to Clarify When Containment Entry Visual Insp Is Required ML20134Q0701997-02-17017 February 1997 Application for Amend to License NPF-42,revising TS 1.7, Containment Integrity, TS 3/4.6.1, Containment Integrity & TS 3/4.6.3, Containment Isolation Valves ML20132G9821996-12-20020 December 1996 Application for Amend to License NPF-42,requesting Rev to Bases for TS 3.8.1.1 Re Electrical Power Systems - AC Sources ML20135D8411996-12-0303 December 1996 Application for Amend to License NPF-42,requesting Rev to TS 6.8.5b Re Reactor Coolant Pump Insp Program ML20135D9781996-12-0303 December 1996 Application for Amend to License NPF-42,changing TS Table 3.3-3 to Correct Ref to Applicable Action Statement for Item 7.b,RWST Level - Low-Low Coincident W/Safety Injection ML20112A5471996-05-16016 May 1996 Application for Amend to License NPF-42,revising Tech Spec Surveillance Requirements 4.7.6.e.4 to Reflect Proposed Design Change to Output Rating of Charcoal Filter Adsorber Unit Heater in Pressurization Sys Portion CREVS ML20108C8191996-05-0101 May 1996 Application for Amend to License NPF-42,revising TS Section 6.0 to Reflect Position Title Changes within WCNOC Organization ML20101B0201996-03-0808 March 1996 Application for Amend to License NFP-42,revising TS Figure 2.1-1, Reactor Core Safety Limit - Four Loops in Operation, Table 2.2-1, RTS Instrumentation Setpoints, & Table 3.2-1, DNB Parameters ML20097D3281996-02-0808 February 1996 Application for Amend to License NPF-42,revising TS 3/4.6.1.1, Containment Integrity, TS 6.8.4i, Containment Air Locks & Adding TS 6.8.4i, Containment Leakage Rate Testing Program ML20097D3081996-02-0808 February 1996 Application for Amend to License NPF-42,revising TS 3.9.4 Re Containment Bldg Penetrations ML20099L7061995-12-20020 December 1995 Application for Amend to License NPF-42,revising TSs 3/4.6.1.1 & 3/4.6.1.3 to Incorporate Option B of 10CFR50,App J ML20095F8711995-12-13013 December 1995 Application for Amend to License NPF-42,revising TS Surveillance Requirement 4.1.3.1.3 to Delete Requirement for Performing Control Rod Drop Surveillance Test W/Tavg Greater than 551 F.Proprietary SE Encl.Se Withheld ML20095F0071995-12-13013 December 1995 Application for Amend to License NPF-42,revising Minimum & Maximum Flow Requirements for Centrifugal Charging & SI Pumps Specified in TS SR 4.5.2.h ML20095F9371995-12-13013 December 1995 Application for Amend to License NPF-42,revising TSs 3/4.8.2.1,3/4.8.2.2,3/4.8.3.1 & 3/4.8.3.2 Re Electrical Power Sys Dc Sources & Onsite Power Distribution ML20094P0591995-11-22022 November 1995 Application for Amend to License NPF-42,revising TS 3/4.3.1 to Reflect Deletion of Boron Dilution Mitigation Sys ML20094P0691995-11-22022 November 1995 Application for Amend to License NPF-42,revising TS 3.9.4 & Bases Section to Allow Containment Personnel Airlock Doors to Be Open During Core Alterations & Movement of Irradiated Fuel in Containment & TS 4.9.4 ML20094B3661995-10-24024 October 1995 Application for Amend to License NPF-42,revising TS SR 4.7.6.c,d & E to Reflect Proposed Design Change to Output Rating of Charcoal Filter Adsorber Unit Heater in Pressurization Sys of CR Emergency Ventilation Sys ML20093K6491995-10-18018 October 1995 Application for Amend to License NPF-42,replacing Current Fuel Oil Vol Requirement in EDG Day Tank in TS 3.8.1.1.b.1 & 3.8.1.2.b.1 W/ Fuel Oil Level Requirement ML20092J4071995-09-15015 September 1995 Application for Amend to License NPF-42,revising TS 3/4.8.1, Electrical Power Sys - AC Sources & Associated Bases, Proposing That Guidance of RG 1.9,Rev 3,GL 93-05 & 94-01 Be Adopted ML20092F5831995-09-14014 September 1995 Application for Amend to License NPF-42,revising TS 3/4.5.5, ECCS - RWST to Increase AOT of RWST for Adjustment of Boron Concentration from One H to Eight H ML20091K7851995-08-22022 August 1995 Application for Amend to License NPF-42,revising TS to Relocate Instrumentation Response Time Limits 1999-09-21
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20212F8831999-09-21021 September 1999 Application for Amend to License NPF-42,proposing to Modify Effective Full Implementation Date for Amend 120 from 991231 to 000630 ML20209D3561999-07-0808 July 1999 Application for Amend to License NPF-42 to Revise Allowable Value for CTS Table 3.3-4,functional Unit 8.a.,4 Kv Undervoltage - Loss of Voltage & Functional Unit 8.b.,4 Kv Undervoltage - Grid Degraded Voltage.Se & Nshc,Encl ML20209C2001999-06-30030 June 1999 Application for Amend to License NPF-42 for Temporary Change to CTS Without Action to Reduce Power ML20195G0211999-06-11011 June 1999 Application for Amend to License NPF-42,revising TS 3.7.1.6 & Associated Bases.Proposed Change Would Modify LCO to Require Four ARVs to Be Operable;Eliminate Use of Required in Action Statements;Add New Action for Three or More ARVs ML20195F7801999-06-10010 June 1999 Application for Amend to License NPF-42,proposing to Revise Z,S & Allowable Value Terms for Current TS Table 3.3-4, Functional Unit 7.b,automatic Switchover to Containment Sump (RWST Level - Low-Low) ML20207L0401999-03-0505 March 1999 Suppl 1 to 970515 Application for Amend to License NPF-42 Incorporating Changes to WCGS TSs & Adding License Conditions to Address Surveillance Requirements.Suppl Submits Mods Submitted to NRC During Review Process ML20199G7211999-01-15015 January 1999 Application for Request of Partial Issuance of Amend to License NPF-42,proposing TS SR Be Revised to Delete During SD Requirement & Reflect Appropriate Plant Conditions in Associated 3/4.7.3 Bases ML20199F4411999-01-12012 January 1999 Application for Amend to License NPF-42,to Revise TS 3/4.7.5 by Adding New Action Statement Requiring Verification of Operability of Two RHR Trains,Or Initiation of Power Reduction with Only One RHR Train Operable ML20198P1161998-12-29029 December 1998 Application for Amend to License NPF-42,revising Tech Specs to Incorporate Revised RCS Heatup & Cooldown Limit Curves & Revised Cold Overpressure Mitigation Sys (COMS) PORV Setpoint Limit Curve ML20195E5421998-11-10010 November 1998 Suppl Application for Amend to License NPF-42,transferring Control of Kg&E & Kansas Power & Light Possessory Ownership Interests to Westar Energy,Inc ML20155C4481998-10-26026 October 1998 Application for Amend to License NPF-42,transferring Kansas Gas & Electric Co & Kansas City Power & Light Co Interest in Operating Subject License for WCGS & Reflecting Transfer of Ownership ML20154S5651998-10-23023 October 1998 Application for Amend to License NPF-42,revising TS 3.5.1 by Increasing AOT in Action B. to 24 Hours in Lieu of Current AOT of One Hour ML20236R4711998-07-17017 July 1998 Application for Emergency Amend to License NPF-42 Revising TS 3/4.7.5, UHS, by Adding New Action Statement ML20247F8551998-05-0808 May 1998 Application for Amend to License NPF-42,revising TS 3/4.3.2, Table 3.3-3,ESF Actuation Sys Instrumentation ML20216J8151998-03-20020 March 1998 Application for Amend to License NPF-42,increasing Spent Fuel Storage Capacity & Max Nominal Fuel Enrichment to 5.0 W/O (Nominal Weight Percent) U-235.Proprietary & non-proprietary Holtec Repts,Encl.Proprietary Encl Withheld ML20202D1171998-02-0404 February 1998 Application for Amend to License NPF-42,revising TS 3/4.2.4, Quadrant Power Tilt Ratio & Associated Bases, to Clarify Required Actions for Limiting LCO & Other Change Consistents W/Ts Conversion Application Previously Submitted ML20202C4501998-02-0404 February 1998 Application for Amend to License NPF-42,revising Tech Specs 3/4.3, Changes to ESFAS Functional Units 6.f,8.a & 8.b ML20199H3431998-01-28028 January 1998 Application for Amend to License NPF-42,revising TS 6.3 & 6.12 to Reflect Position Change within Organization ML20198Q4321997-11-0606 November 1997 Application for Amend to License NPF-42,revising TS Sections 3/4.8.1,3/4.8.2 & 3/4.8.3 Re Installation of Spare Battery Chargers ML20217K2121997-10-17017 October 1997 Application for Amend to License NPF-42,revising TS Surveillance Requirements 4.5.2b & Associated Bases Re Requirement to Vent ECCS Pump Casings ML20216F7121997-09-0606 September 1997 Application for Amend to License NPF-42,alleviating Need for Enforcement Discretion Granted by NRC on 970905 ML20216D1471997-09-0202 September 1997 Application for Amend to License NPF-42,adding Requirements for Essential Svc Water Flowpaths to Turbine-Driven Auxiliary Feedwater Pump ML20196J3991997-07-29029 July 1997 Application for Amend to License NPF-42,revising Wording of Action Statement 5a to TS Table 3.3-1, Reactor Trip Sys Instrumentation ML20141G7641997-07-0303 July 1997 Application for Amend to License NPF-42,incorporating Addl Info Into TS 6.9.1.9, Colr ML20141F4361997-05-15015 May 1997 Application for Amend to License NPF-42,requesting Approval of Full Conversion of TS from Current to Set Based Upon Improved Std Ts,Per NUREG-1431 ML20138B9011997-04-23023 April 1997 Application for Amend to License NPF-42,revising TS 3/4.9.4, Containment Bldg Penetrations & Associated Bases Section to Allow Selected Containment Isolation Valves to Be Opened Under Administrative Controls During Core Alterations ML20137X3211997-04-15015 April 1997 Suppl to Application for Amend to License NPF-42,requesting TS 6.8.5.b, Reactor Coolant Pump Flywheel Insp Program ML20147F8121997-03-21021 March 1997 Application for Amend to License NPF-42,revising Tech Specs 6.8.5b Re Reactor Coolant Pump Flywheel Insp Program to Provide Exception to Exam Requirements in Reg Guide 1.14,Rev 1, Reactor Coolant Pump Flywheel Integrity ML20137B9311997-03-18018 March 1997 Application for Amend to License NPF-42,revising TS Section 5.3.1,fuel Assemblies to Allow Use of Alternate Zr Based Fuel Cladding Matl ZIRLO ML20137B8971997-03-18018 March 1997 Application for Amend to License NPF-42,revising TS SR 4.5.2.c to Clarify When Containment Entry Visual Insp Is Required ML20134Q0701997-02-17017 February 1997 Application for Amend to License NPF-42,revising TS 1.7, Containment Integrity, TS 3/4.6.1, Containment Integrity & TS 3/4.6.3, Containment Isolation Valves ML20132G9821996-12-20020 December 1996 Application for Amend to License NPF-42,requesting Rev to Bases for TS 3.8.1.1 Re Electrical Power Systems - AC Sources ML20135D8411996-12-0303 December 1996 Application for Amend to License NPF-42,requesting Rev to TS 6.8.5b Re Reactor Coolant Pump Insp Program ML20135D9781996-12-0303 December 1996 Application for Amend to License NPF-42,changing TS Table 3.3-3 to Correct Ref to Applicable Action Statement for Item 7.b,RWST Level - Low-Low Coincident W/Safety Injection ML20112A5471996-05-16016 May 1996 Application for Amend to License NPF-42,revising Tech Spec Surveillance Requirements 4.7.6.e.4 to Reflect Proposed Design Change to Output Rating of Charcoal Filter Adsorber Unit Heater in Pressurization Sys Portion CREVS ML20108C8191996-05-0101 May 1996 Application for Amend to License NPF-42,revising TS Section 6.0 to Reflect Position Title Changes within WCNOC Organization ML20101B0201996-03-0808 March 1996 Application for Amend to License NFP-42,revising TS Figure 2.1-1, Reactor Core Safety Limit - Four Loops in Operation, Table 2.2-1, RTS Instrumentation Setpoints, & Table 3.2-1, DNB Parameters ML20097D3281996-02-0808 February 1996 Application for Amend to License NPF-42,revising TS 3/4.6.1.1, Containment Integrity, TS 6.8.4i, Containment Air Locks & Adding TS 6.8.4i, Containment Leakage Rate Testing Program ML20097D3081996-02-0808 February 1996 Application for Amend to License NPF-42,revising TS 3.9.4 Re Containment Bldg Penetrations ML20099L7061995-12-20020 December 1995 Application for Amend to License NPF-42,revising TSs 3/4.6.1.1 & 3/4.6.1.3 to Incorporate Option B of 10CFR50,App J ML20095F0071995-12-13013 December 1995 Application for Amend to License NPF-42,revising Minimum & Maximum Flow Requirements for Centrifugal Charging & SI Pumps Specified in TS SR 4.5.2.h ML20095F9371995-12-13013 December 1995 Application for Amend to License NPF-42,revising TSs 3/4.8.2.1,3/4.8.2.2,3/4.8.3.1 & 3/4.8.3.2 Re Electrical Power Sys Dc Sources & Onsite Power Distribution ML20095F8711995-12-13013 December 1995 Application for Amend to License NPF-42,revising TS Surveillance Requirement 4.1.3.1.3 to Delete Requirement for Performing Control Rod Drop Surveillance Test W/Tavg Greater than 551 F.Proprietary SE Encl.Se Withheld ML20094P0591995-11-22022 November 1995 Application for Amend to License NPF-42,revising TS 3/4.3.1 to Reflect Deletion of Boron Dilution Mitigation Sys ML20094P0691995-11-22022 November 1995 Application for Amend to License NPF-42,revising TS 3.9.4 & Bases Section to Allow Containment Personnel Airlock Doors to Be Open During Core Alterations & Movement of Irradiated Fuel in Containment & TS 4.9.4 ML20094B3661995-10-24024 October 1995 Application for Amend to License NPF-42,revising TS SR 4.7.6.c,d & E to Reflect Proposed Design Change to Output Rating of Charcoal Filter Adsorber Unit Heater in Pressurization Sys of CR Emergency Ventilation Sys ML20093K6491995-10-18018 October 1995 Application for Amend to License NPF-42,replacing Current Fuel Oil Vol Requirement in EDG Day Tank in TS 3.8.1.1.b.1 & 3.8.1.2.b.1 W/ Fuel Oil Level Requirement ML20092J4071995-09-15015 September 1995 Application for Amend to License NPF-42,revising TS 3/4.8.1, Electrical Power Sys - AC Sources & Associated Bases, Proposing That Guidance of RG 1.9,Rev 3,GL 93-05 & 94-01 Be Adopted ML20092F5831995-09-14014 September 1995 Application for Amend to License NPF-42,revising TS 3/4.5.5, ECCS - RWST to Increase AOT of RWST for Adjustment of Boron Concentration from One H to Eight H ML20091K7851995-08-22022 August 1995 Application for Amend to License NPF-42,revising TS to Relocate Instrumentation Response Time Limits 1999-09-21
[Table view] |
Text
,
WOLF CREEK ' NUCLEAR OPERATING CORPORATION =
l 1
SN. MEff" or Aou,anc. October 28, 1992-NA 92-0073 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station F1-1.7 Washington, D. C. 20555 ;
Subject:
Docket No. 50-482: Revision to Technical Specifications-for Cycle 7 Gentlemen E
-This letter transmits an application for amendment to Facility Operating i License No. NPF-42 for Wolf Creek Ger.erating Station (WCGS), . Unit 1. This lit. ens e ameadment request proposes revisions to various Technical Spec 3fication_ sections to support the use of VANTAGE SH fuel with Intermediate
-Flow Mixers beginning in cycle 7; to include results of analyses performed for o: era tion at-an increased power level; to allow main steam safety valve setpoint tolerance increases: and to relocate cycle-specific parameters to the Core Operating Limits Report.
The analyser performed to support these revisions were done in accordance with the .- me thodolohies described in Wolf Creek Nt.clea r Operating Corporation's (WCNOC) topical- reports shich are currently with the NRC for approval.
Although the analyses have been performed for operation at an increased power level, approval for_ operation at this level is not being requested at this time. The - relocation of cycle-specific parameters to the Crr. Operating Limi- Report is - being done as all iwed by Generic Letter 88-16 " Removal-of Cyci specific Parameter Limits frut Technical Specifications."
Implementation of this proposed revisica to the WCGS technical specifications ,
is needed to support the upcoming refueling outage. -Therefore, WCNOC requests. i approval of this proposed amendment prior to.the sixth refueling. outage which is scheduled-to begin in March, .1993. The proposed revision will be fully implemented within 30 days of formal Nuclear Regulatory Commission appreval.
Attachment I,-provides a; safety evaluation, Attachment II provide _s a significant hazards _ consideration determination, . and Attachment III provides an environmental impact determination. Attachment IV ' provides the specific-changes to the . technical specification and the detailed evaluation / analyses associated with each change. .
30.1();
1 Dox a n / Burlington, KS 66839 / Phone: (316) 364-8831 -
9210300184 921028 2 An Eaual oppoqunity Employer M/F/HCWET
[n PDR ADOCR 0500
- P- '
j w _
3
_ . - _ - _ . . . _ . < _ _ _ ._ _- _. ___. . ,. _ _ - _ ..-- - _ . _ _ _. _ m_ - _ . _
_l
-i 3:A 92-0073
- Page 2 of 2 In accordance with 10 - CFR 50.91, a copy of this application, with attachments, is being provided'to the designated Kansas State Official.
If you have any questions concerning this matter, please contact me at (316) 364-8831 Ext. 4553 or Mr. Kevin J. Moles of my staff at (316) 364-8831
-- Ext. 4565.
Very Atruly yours, y-
/g,/,/ , e
/ g e '/
/
i R$bert C. Hagan g,'
Vice President Nuclear Assurance RCH/jra
. Attachments: I - Safety Evaluation II - Significant Hazards Consideration Determination III - Environmental Impact Determitation IV - Safety Evaluation and Cycle 7 Technirsl Specification-Change Report
- cc -G'. W Allen (KDHE), w/a A'. T.-Howell (NRC), w/a J. L. Millican (NRC), w/a G. A. Pick (NRC), w/a W. - D. Reckley'(NRC), w/a
?
4
/*
+ p - -
, . , - ,, , , , . , ,,,,,..n , - . - - - -
1 l
1 STATE OF KANSAS }
} SS COUNTY OF COFFEY )
l 1
1 Robert C. Hagan, of lawful age, being first duly sworn upon oath says that he is Vice President Nuclear Assurance of Wolf Creek Nuclear Operating Corporation; that he has read the foregoing document and knows the content thereof; that he has executed that same for and on behalf of said Corporation with full power and authority to dc so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.
f)
!! l -
By 8 1 h/L / !fM [ _
Rob"erjtC.'Hagan /
Vice Uresident ,#
I Nuclear Assurance SUBSCRIBED and sworn to before me this c2E day of CCl , 1992. ,,,.." "*"<,,,
a : us i'w b yn,b n l fe ~4.f. W3- S . ,{A
'*4 \+.,,
l A W 10Nj ,}
Notary Public f fo O'Oi i"%.).h*.")&
. g 4?h'5 Expiration Date i fDF f 9(/ $, "*"lq /
i l
i
Attachment I to NA 92-0073 Page 1 of 2
)
ATTACIIMENT I SAFETY EVALUATION
- ._- . ~ - . - -. . - - - . _ , - . . _ -
. - --.-~ -- ~ , . - - . - ~ ~
Attachment I to NA 92-0073 Page 2 of 2 Safety Evaluation
!- Proposed Channe The proposed technical specification revisions are being made to support the .
use of VANTAGE SH fuel with the Intermediate Flow Mixer (IFM) grid feature incorporated. In addition this evaluation supports the analyses associated with operation at an increased power level, an increase in main steam safety valve setpoint tolerances, and the relocation of_ cycle-specific parameters to
,- the Core Operating Limits Report, j Evaluation The changes proposed above were evaluated using the following criteria to determine any effects on safe operation of the plant.
- 1. Departure from Nuclear Boiling (DNB) design basis
- 2. Fuel Temperature Design Basis
- 3. Reactor Coolant System Pressure
- 4. Loss of Coolant Design Basis The evaluation considered non-LOCA transients. LOCA transients, and the radiological consequences of accidents. The results showed that; the proposed changes and assumptions are not initiators of any accidents the consequences of evaluated accidents are not increased and the radiological consequences remain well within 10 CFR 100 guidelines _for a full core of. VANTAGE 5H with IFM as well as the transition cores; and no new performance requirements are '
being imposed on any system or component to _ _ support ~ the revised analysis.
l Therefore, there is no change in the probability or consequences of the types_
( of accidents previously evaluated._ __ The evaluation also _ showed that~ with_ the
!_ proposed changes and assumptions the operating envelope'would-remain bound by, and in -no ca r.e exceed the acceptance limits defined in the technical' specifications.
L . Based en the - above findings and the detailed evaluations included with l Attachment IV, the proposed changes - do not increase fthe. probability of occurrence or the consequences of an accident - or malfunction of equipment important to . .saf ety previously ~ evaluated in the safety . analysis , report, or create a possibility for an accident or malfunction of a different type than any previously evaluated in the safety analysis reports _or reduce the margin ~
of safety as defined.in the basis for any technical. specification. _Therefore, the proposed r$anges do-not adversely affect or endanger.the health or safety of the general public or involve a significant _ safety hazaru.
t
l i
Attachment 11 to NA 92-0073 Page 1 of 2 I
ATTACIDiENT II SIGNIFICANT lit.ZARDS CONSIDERATION DETERMINATION C
^
Attachment-II to NA 92 0073 Fage 2 of 2 Significant 11azards Consideration Determination The proposed technical specification revisions are being made to support the use of VANTAGE SH fuel with Intermediate Flow 7"xers beginning in cycle 7; to
='
include results of analyses performed for an increased power level _ an increase in main steam safety vcive setpoint tolerancest and to relocate cycle specific parameters to the Core Operating Limits Report as allowed by Generic Letter 88-16.
The following standards were considered in tr 4 mining if any significant hazards would be created by this proposed change.
Standard 1 - Involve a Sinnificant Increase in the Probability or Conneouences of an Accident Previously Evaluated The proposed changes have been found not to be initiators of any accident and therefore do not affect the probability of occurrence. The proposed changes '
do not introduce any new performance requirements for any -systems or components, therefore, the ability of the_ systems or-components to limit the consequences of an accident is not decreased.
Standard 2 - Create the Possibility of a New or Different Kind of Accident From any Previousiv Evaluated The proposed changes do not introduce any new performance requirements or modes of operation to any systems or components and therefore, do not introduce any new f ailure modes. Therefore, there is no possibility of the-creation of a new or different kind of accident from any previously evaluatsd.
Standard 3 - Involve a-Sinnificant Reduction in the Marnin of Safety An evaluation of the proposed changes and assumptions ha's shown that operation under the new conditions would remain bound by the: operating envelope' defined by technical specifications. Therefore, the margin of safety is not' reduced.
Based' on the above discussion it has been de te rmined .: that the requested technical specification revision does not violate any of the three standards.
Therefore, the requested license - amendment does not - involve a significant.
hazards consideration.
I i i
! .' i i
n _ . -.
- Attachment III to NA- 92-0073-Page 1 of 3 ATTACllMENT III ENVIRONMENTAL IMPACT DETFRMINATION p-i
Attachment III to NA 92-0073 Page 2 of 3 l l
Environmental ]mpact Determination This amendment request meets the criteria specified in 10 CFR 51.22(c)(9).
Specific criteria contained in this section are discussed below.
(1) this amendment involves no significant hazards consideration As demonstrated in Attachment II. this proposed amendment does not involve any significant hazards considerations.
(ii) there is no significant change in the types or significant increase in the amounts of any effluents that may be released offsite this proposed technical specification change involves the following F
- Incorporating Intermediate Flow Mixer grid feature of the VANTAGE 5H fuel assembly Increase in Fag /Fq e Positive Moderator Temperature Coefficient
- OTAT/0 PAT Setpoint Changes
- Decrease in Allowed RCS Thermal Design Flowrate
- Core Operating Limit Report In addition to the technical specification changes noted above, the following ,
conservative assumptions were incorporated into the analysis:
- Increase rated thermal power (from 3411 MWt to 3565 MWt) '
- Analysis over a range of temperatures
- -Thimble plug-removal The current radiation source terms used in the current Updated Safety Analysis Report-(USAR) dose consequences analyses were based on a core power level of 3565 MWt and on a 12 month operating cycle. The radiation source terms were then re-calculated when' the Jesign change that converted the 12-month fuel cycle to 18-month was implemented. The impact of extended fuel burnup-as a result of increased cycle length on the radiological consequences of-accidents was found to be insignificant since the calculated radiation - doses are directly related to the core inventory of radioactive isotopes which is not strongly influenced by the extension of fuel burnup.
.._ _ ..__.._ - _.-.~ - __.._. _ _ -.-
.__._>..m_..._.m Attachment III to NA 92-0073 Page 3 of 3 l
l While the effects f rom the t nsition 9 an extended fuel cycle and a core thermal power of 3565 IEt on these s.nalyses have been evaluated to be minor, Wolf Creek . Nuclear Operating Corporation (WCNOC) has elected to use the revised source terms to update the radiological consequ'.nce analyses contained in the USAR. The revised source terms are describA for the various USAR Chapter 15 accidents in Section 5.7 of Attachment IV.- The revised source terms will not re: ult in any eignificant chang in the types or sign 3ficant increase in the amounts of any effluents that may be released offsite.
(iii) there is no s!.gnificant increase in individual or cumulative-occupational radiation exposure As described above, the analysis shows the revised source term changes to be '
minor. Therefore, there will be no significant increase in individual or cu'nul a t ive occupational radiation exposure associated with the proposed change.
Based on the above, there will be no significant impact 7n the environment
- re su1 *.ing from this change and the change meets the criteria specified in 10 CFR 51.22(c)(9) for a categorical exclusion from the requirements of 10 CFR 51.21 relative to a specific environmental assessment by. the Commission, i
l 1
l I
J
. - . - . , - - , .- e ., ., , , , , . - . _ , , , , - , .
. . , , _ . - . ~ , . . . - . . . , . . . . , . . ~ . - . . . . . . - , .c...-
.. ]
Att achtnent IV to . NA 92-00_7 3
'I
-l ATTACIMENT IV i
i Safety Evaluation and Cycle 7 Technical Specification Change Report I
i
- ... .. .. .. _ . - - . _ _ _ . _ _ .. . -- _ _