Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20116F818 + (03:31:51, 13 December 2024)
- AECM-85-0094, Part 21 & Interim Deficiency Rept 85/02 Re Tdi Air Start Valve for Emergency Diesel Generator Engine.Initially Reported on 850319.Valves on Both Diesel Generators Replaced & 800 H Limit Placed on Use.Updated Rept by 850426 + (03:31:52, 13 December 2024)
- ML20116F814 + (03:31:53, 13 December 2024)
- TXX-4465, Interim Significant Deficiency Rept SDAR-174 Re Unauthorized & Undocumented Welding Repairs to Pipe Support & Two Cable Tray Supports.Initially Reported on 850322.Structurally Impaired Support to Be Replaced by 850501 + (03:31:54, 13 December 2024)
- ML20116F797 + (03:31:55, 13 December 2024)
- TXX-4464, Interim Significant Deficiency Rept SDAR-176 Re Reliance Supplied Control Board Which Differs from Equipment Qualification Rept.Initially Reported on 850226.Evaluation Continuing.Completion Expected by 850531 + (03:31:56, 13 December 2024)
- ML20116F749 + (03:31:57, 13 December 2024)
- ML20116F769 + (03:31:57, 13 December 2024)
- NSD-NRC-96-4769, Forwards Response to Open Item Tracking Sys Item 2259 Re COLR Treatment for AP600 Design Certification + (03:31:59, 13 December 2024)
- ML20116F735 + (03:31:59, 13 December 2024)
- AECM-85-0101, Special Rept 85-003/0:on 850302,Phase C Linear Reactor of Div II Diesel Generator Failed During Maint Run.Caused by Breakdown of Reactor Insulation Due to Excessive Heat.All Linear Reactors in Div II Replaced + (03:32:00, 13 December 2024)
- 3F0485-19, Florida Progress Corp Annual Rept 1984. Annual Financial Statements for Util & Participants Encl + (03:32:01, 13 December 2024)
- AECM-85-0096, Part 21 & Interim Deficiency Rept 85/30 Re MSIV Failure to Remain in Closed Position Due to Failure of Automatic Switch Co Dual Solenoid.Initially Reported on 850321.Listed Matl Nonconformance Rept Issued.Updated Rept Expected by 850430 + (03:32:02, 13 December 2024)
- ML20116F684 + (03:32:03, 13 December 2024)
- ML20116F663 + (03:32:11, 13 December 2024)
- ML20116F659 + (03:32:12, 13 December 2024)
- ML20116F654 + (03:32:13, 13 December 2024)
- ML20116F644 + (03:32:14, 13 December 2024)
- ML20116F643 + (03:32:16, 13 December 2024)
- ML20116F639 + (03:32:17, 13 December 2024)
- ML20116F634 + (03:32:18, 13 December 2024)
- 3F0485-16, Application for Amend to License DPR-72 Consisting of Tech Spec Change Request 135 Re Current Reactor Refueling for Cycle Vi.Certificate of Svc Encl + (03:32:19, 13 December 2024)
- ML20116F624 + (03:32:19, 13 December 2024)
- ML20116F619 + (03:32:20, 13 December 2024)
- ML20116F617 + (03:32:21, 13 December 2024)
- ML20116F592 + (03:32:22, 13 December 2024)
- ML20116F591 + (03:32:23, 13 December 2024)
- ML20116F581 + (03:32:24, 13 December 2024)
- ML20116F568 + (03:32:25, 13 December 2024)
- ML20116F567 + (03:32:26, 13 December 2024)
- ML20116F562 + (03:32:27, 13 December 2024)
- ML20116F561 + (03:32:28, 13 December 2024)
- ML20116F551 + (03:32:30, 13 December 2024)
- ML20116F545 + (03:32:32, 13 December 2024)
- ML20116F527 + (03:32:32, 13 December 2024)
- ML20116F510 + (03:32:34, 13 December 2024)
- ST-HL-AE-4247, Proposes Rev to Emergency Plan to Increase Amount of Time Allowed to Augment Onshift Emergency Response Organization in Event of Emergency,As Reflected in Encl Table C-2,Rev 15 of Emergency Plan + (03:32:35, 13 December 2024)
- ML20116F504 + (03:32:36, 13 December 2024)
- ML20116F503 + (03:32:37, 13 December 2024)
- ML20116F502 + (03:32:39, 13 December 2024)
- 05000352/LER-1992-017-01, :on 921012,isolation Signal Resulted in Actuations of Primary Containment & Rv Isolation Control Sys.Caused by Personnel Error.Special Training Session Held to Emphasize Mgts Work Practices + (03:32:42, 13 December 2024)
- ML20116F499 + (03:32:43, 13 December 2024)
- ML20116F494 + (03:32:44, 13 December 2024)
- NSD-NRC-96-4788, Forwards Three Copies of Response to NRC RAI 410.283 & 288 on Section 9 of Ssar,Rai 440.434 Adressing Notrump ADS & Wgothic RAIs 480.280 & 480.347 Through 480.351 + (03:32:44, 13 December 2024)
- ML20116F493 + (03:32:45, 13 December 2024)
- 3F0796-25, Thermal-Lag & Mecatiss Ampacity Test Investigation of Raceway Fire Barriers for Conduit & Cable Tray Sys + (03:32:46, 13 December 2024)
- ML20116F478 + (03:32:47, 13 December 2024)
- 05000443/LER-1992-020, :on 921005,determined That 24 H Sample Interval for Train B Pcc Water Sys Taken Out of Svc on 920924 Exceeded by One H & 25 Minutes.Caused by Personnel Error. Responsible Personnel Counseled + (03:32:49, 13 December 2024)
- ML20116F460 + (03:32:50, 13 December 2024)
- DCL-96-141, Submits Change 9 to Rev 18 of Physical Security Plan.Plan Withheld + (03:32:51, 13 December 2024)
- ML20116F455 + (03:32:52, 13 December 2024)