Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000293/LER-1992-011, :on 920821,unplanned Actuation of Portion of RHR Sys Circuitry Occurred During Logic Sys Functional Test. Caused by Util non-licensed Technician Error.Procedure Changed & Technician Counseled + (02:20:12, 13 December 2024)
- 05000277/LER-1992-011, :on 920624,discovered Unqualified Fire Barriers During NRC Bulletin 92-001 Review.Caused by Design Defects During Initial Installation of Thermo-Lag Barriers.Fire Watches Established in HPSW Pump Structure + (02:20:14, 13 December 2024)
- ML20118A752 + (02:20:15, 13 December 2024)
- 05000285/LER-1992-028, :on 920822,RPS Automatically Tripped Reactor on Thermal Margin/Low Pressure,Causing Increase in RCS Pressure Caused by Failure of Ac to Dc Power Converter in EHC Panel. Power Source Modified & Pressures Adjusted + (02:20:17, 13 December 2024)
- ML20118A748 + (02:20:18, 13 December 2024)
- ML20118A747 + (02:20:19, 13 December 2024)
- ML20118A745 + (02:20:20, 13 December 2024)
- ML20118A743 + (02:20:21, 13 December 2024)
- ML20118A740 + (02:20:22, 13 December 2024)
- ML20118A742 + (02:20:22, 13 December 2024)
- ET-NRC-92-3751, Forwards List of AP600 Sys for Which Westinghouse Will Be Providing Itaac,Per 920904 Commitment.Remaining 27 Sys ITAAC Will Be Sent on 921023 + (02:20:23, 13 December 2024)
- ET-NRC-92-3748, Provides Comments on Draft Policy Design Certification & Licensing Policy Issues Pertaining to Passive & Evolutionary Advanced LWR Designs + (02:20:24, 13 December 2024)
- ML20118A725 + (02:20:24, 13 December 2024)
- ML20118A720 + (02:20:25, 13 December 2024)
- 05000327/LER-1991-009, :on 910506,LCO 3.7.11.1 Entered When Fire Suppression Sys for Auxiliary Bldg Declared Inoperable. Caused by Inability of HPFP Sys to Pass Periodic Surveillance Test.Wr Initiated + (02:20:27, 13 December 2024)
- ML20118A718 + (02:20:28, 13 December 2024)
- ML20118A716 + (02:20:28, 13 December 2024)
- ML20118A714 + (02:20:29, 13 December 2024)
- ML20118A709 + (02:20:30, 13 December 2024)
- ML20118A713 + (02:20:30, 13 December 2024)
- ML20118A707 + (02:20:31, 13 December 2024)
- 05000254/LER-1991-022, :on 911104,CR Train B Air Filtration Unit Declared Inoperable Due to Failing to Attain 15 F Differential Temp.Caused by Inaccurate Flow Measuring Device.Flow Measuring Device Recalibr + (02:20:33, 13 December 2024)
- ML20118A700 + (02:20:34, 13 December 2024)
- ML20118A702 + (02:20:34, 13 December 2024)
- HL-2376, Forwards Response to NRC 920708 Meeting Request to Provide Addl Info Re Resolution of Human Engineering Discrepancies, Specifically,Differences in Annunicator Arrangements Between Units 1 & 2 & History of Dcrdr Project + (02:20:36, 13 December 2024)
- 05000423/LER-1992-016, :on 920704,both Trains of Auxiliary Bldg Filters Declared Inoperable When Access Door on Common Intake Plenum for Subj Bldg Found Open.Caused by Impoper Design.Door Locked Wired Shut + (02:20:38, 13 December 2024)
- ML20118A691 + (02:20:39, 13 December 2024)
- ML20118A689 + (02:20:40, 13 December 2024)
- ML20118A686 + (02:20:40, 13 December 2024)
- ML20118A684 + (02:20:41, 13 December 2024)
- ML20118A681 + (02:20:42, 13 December 2024)
- ML20118A682 + (02:20:42, 13 December 2024)
- ML20118A680 + (02:20:43, 13 December 2024)
- ML20118A678 + (02:20:44, 13 December 2024)
- ML20118A674 + (02:20:44, 13 December 2024)
- ML20118A673 + (02:20:45, 13 December 2024)
- ML20118A671 + (02:20:46, 13 December 2024)
- ML20118A660 + (02:20:46, 13 December 2024)
- 3F0992-05, Forwards Update to Util 900102 Response to GL 89-10 & Suppls 1 Through 4 Re safety-related MOV Testing & Surveillance. Util Intends to Complete Implementation of MOV Program During Refuel 9,currently Scheduled for Apr 1994 + (02:20:47, 13 December 2024)
- 05000456/LER-1992-010-06, :on 920814,dual Accounting for Samarium to Boron Value Contained in Curvebook Table 1-1 Re Min Required Boron Concentration for Shutdown Margin Occurred.Caused by Procedural Flaw.Procedure Revs Submitted + (02:20:49, 13 December 2024)
- ML20118A655 + (02:20:50, 13 December 2024)
- ML20118A649 + (02:20:51, 13 December 2024)
- ML20118A654 + (02:20:51, 13 December 2024)
- ML20118A648 + (02:20:52, 13 December 2024)
- ML20118A645 + (02:20:53, 13 December 2024)
- ML20118A646 + (02:20:53, 13 December 2024)
- 05000327/LER-1992-016, :on 920819,LCO 3.0.3 Entered for 18 Minutes When Both CREVS Trains Taken Out of Svc to Replace Inlet Damper in Each Train.Caused by Bypass Leakage Through Existing Dampers.Both Dampers Replaced + (02:20:55, 13 December 2024)
- ML20118A641 + (02:20:56, 13 December 2024)
- ELV-04004, Application for Amends to Licenses NPF-68 & NPF-81,revising TS Re Overtemp delta-T & Overpower delta-T Reactor Trip Functions to Provide Addl Operating Margin to Reactor Trip & Turbine Runback Setpoints to Account for Flow Phenomena + (02:20:57, 13 December 2024)
- 05000219/LER-1992-009, :on 920822,reactor Scrammed on Low Water Level Due to Failure of Proportional Amplifier.Failed Proportional Amplifier Replaced & Plant Restarted + (02:20:58, 13 December 2024)
- ML20118A636 + (02:20:59, 13 December 2024)