Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML12254B467 + (03:38:13, 12 January 2025)
- ML12254B148 + (03:38:13, 12 January 2025)
- Press Release-12-101, NRC Completes FY12 Nuclear Education Grant Awards and Announces FY13 Federal Funding Opportunities + (03:38:14, 12 January 2025)
- BSEP 12-0093, 3 to Updated Final Safety Analysis Report and Changes to Quality Assurance Program Description + (03:38:15, 12 January 2025)
- ML12254B086 + (03:38:18, 12 January 2025)
- ML12254B064 + (03:38:18, 12 January 2025)
- Press Release-12-100, NRC Issues Draft Guidance for Examining Plant Response to Updated Seismic Hazards + (03:38:19, 12 January 2025)
- ML12254B002 + (03:38:20, 12 January 2025)
- L-12-335, Supplemental Reply to Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application (TAC No. ME4640) and License Renewal Application Amendment No. 34 + (03:38:21, 12 January 2025)
- CY-12-011, Watch Information - Economic Consequences within NRC Regulatory Framework + (03:38:22, 12 January 2025)
- ML12254A869 + (03:38:25, 12 January 2025)
- ML12254A852 + (03:38:26, 12 January 2025)
- ML12254A648 + (03:38:26, 12 January 2025)
- ML12254A404 + (03:38:27, 12 January 2025)
- ML12254A378 + (03:38:32, 12 January 2025)
- ML12254A331 + (03:38:33, 12 January 2025)
- GNRO-2012/00107, Vibration Data Report and Commitment Change + (03:38:34, 12 January 2025)
- 3F0812-06, Response to Second Request for Additional Information to Support NRC Mechanical and Civil Engineering Branch (Emcb) Technical Review of the CR-3 Extended Power Uprate LAR + (03:38:34, 12 January 2025)
- TMI-12-137, Request to Use a Provision of a Later Addenda of the ASME Code for Operation and Maintenance of Nuclear Power Plants + (03:38:35, 12 January 2025)
- IR 05000315/2012301 + (03:38:38, 12 January 2025)
- ML12254A090 + (03:38:39, 12 January 2025)
- ML12254A061 + (03:38:40, 12 January 2025)
- ML12254A057 + (03:38:40, 12 January 2025)
- ML12254A018 + (03:38:41, 12 January 2025)
- ML12254A005 + (03:38:42, 12 January 2025)
- NRC 2012-0068, Licensee Qualification for Performing Dynamic Rod Worth Measurement Analysis + (03:38:43, 12 January 2025)
- PNP 2012-071, Response to Request for Additional Information — License Amendment Request — Replacement of Spent Fuel Pool Region I Storage Racks + (03:38:44, 12 January 2025)
- LIC-12-0127, Management Change + (03:38:47, 12 January 2025)
- LIC-12-0128, Management Change + (03:38:48, 12 January 2025)
- ML122540962 + (03:38:48, 12 January 2025)
- IR 05000275/2012404 + (03:38:50, 12 January 2025)
- ML12251A731 + (03:38:50, 12 January 2025)
- RNP-RA/12-0057, License Amendment Request for Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection and Application of Permanent Alternate Repair Criteria (H*) + (03:38:52, 12 January 2025)
- ML12251A336 + (03:38:54, 12 January 2025)
- ML12251A359 + (03:38:54, 12 January 2025)
- ML12251A334 + (03:38:55, 12 January 2025)
- ML12251A335 + (03:38:55, 12 January 2025)
- ML12251A322 + (03:38:56, 12 January 2025)
- ML12251A317 + (03:38:57, 12 January 2025)
- NL-12-1795, Revision to License Amendment Request to Extend the Inspection Interval for Reactor Coolant Pump Flywheels + (03:38:57, 12 January 2025)
- ML12251A270 + (03:38:58, 12 January 2025)
- ML12251A268 + (03:39:06, 12 January 2025)
- ML12251A267 + (03:39:07, 12 January 2025)
- ML12251A250 + (03:39:11, 12 January 2025)
- L-2012-314, License Amendment Request No. 224 Regarding Technical Specification 3/4.6.2.3 - Recirculation Ph Control System and Natb Basket Minimum Loading Requirement + (03:39:12, 12 January 2025)
- ML12251A231 + (03:39:13, 12 January 2025)
- ML12251A197 + (03:39:13, 12 January 2025)
- ML12251A155 + (03:39:14, 12 January 2025)
- BSEP 12-0098, Enclosure 15 to BSEP 12-0098, Areva Report No. 51-9189034-000, Brunswick Unit 2 Cycle 21 SLMCPR Analysis with SAFLIM3D Methodology - Operability Assessment + (03:39:15, 12 January 2025)
- ML12251A146 + (03:39:16, 12 January 2025)
- ML12251A145 + (03:39:16, 12 January 2025)