ML12254A404

From kanterella
Jump to navigation Jump to search
IR 05000346-12-403(DRS); 08/06/2012 - 08/10/2012; Davis-Besse Nuclear Power Station; Routine Security Baseline Inspection - Cover Letter Only
ML12254A404
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/07/2012
From: Reynolds S
Division of Reactor Safety III
To: Allen B
FirstEnergy Nuclear Operating Co
References
EA-12-179 IR-12-403
Download: ML12254A404 (5)


See also: IR 05000346/2012403

Text

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE ROAD, SUITE 210

LISLE, IL 60532-4352

September 7, 2012

EA-12-179

Mr. Barry Allen

Site Vice President

FirstEnergy Nuclear Operating Company

Davis-Besse Nuclear Power Station

5501 North State Route 2, Mail Stop A-DB-3080

Oak Harbor, OH 43449-9760

SUBJECT: DAVIS-BESSE NUCLEAR POWER STATION

NRC SECURITY BASELINE INSPECTION REPORT 05000346/2012403(DRS)

PRELIMINARY GREATER THAN GREEN FINDING

Dear Mr. Allen:

On August 10, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a security

baseline inspection at your Davis-Besse Nuclear Power Station. The inspection covered one or

more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process.

The enclosed inspection report documents the inspection results, which were discussed on

August 10, 2012, with you and other members of your staff.

The inspection examined activities conducted under your licenses as they relate to security and

compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed

personnel.

This report documents a finding that has the potential for significance of greater than very low

security significance (i.e., greater than Green) as determined by the Physical Protection

Significance Determination Process. The final resolution of this finding will convey the

increment in the importance to safety by assigning the corresponding color. The deficiencies

were corrected or compensated for, and the plant was in compliance with applicable physical

protection and security requirements within the scope of this inspection before the inspector left

the site.

Enclosure contains Sensitive Unclassified

Non-Safeguards Information. When separated

from enclosure, this transmittal document is

decontrolled.

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

B. Allen -2-

The finding is also an apparent violation (AV) of NRC requirements and is being considered for

escalated enforcement action in accordance with the NRC Enforcement Policy. The current

Enforcement Policy can be found at the NRCs Web site at http://www.nrc.gov/reading-rm/doc-

collections/enforcement.

A cross-cutting aspect was identified in the area of Human Performance (H.1(b)) because your

staff failed to conduct an effectiveness review of safety significant decisions to verify the validity

of the underlying assumptions, and identify possible unintended consequences.

In accordance with Inspection Manual Chapter (IMC) 0609, Significance Determination Process

(SDP), we intend to complete our evaluation using the best available information and issue our

final determination within 90 days of the date of this letter.

The SDP encourages an open dialogue between the NRC staff and the licensee; however, the

dialogue should not impact the timeliness of the staffs final determination. Before the NRC

makes its enforcement decision, we are providing you an opportunity to either: (1) present to

the NRC your perspectives on the facts and assumptions used by the NRC to arrive at the

finding and its significance at a Regulatory Conference, or (2) submit your position on the

finding to the NRC in writing. If you decline to request a Regulatory Conference or submit a

written response, you relinquish your right to appeal the final SDP determination, in that by not

doing either; you fail to meet the appeal requirements stated in the Prerequisite and Limitation

Section of Attachment 2 of IMC 0609.

If you request a Regulatory Conference, it should be held within 30 days of the receipt of this

letter and we encourage you to submit supporting documentation at least one week prior to the

conference in an effort to make the conference more efficient and effective. In the interest of

protecting sensitive, security-related information, if a Regulatory Conference is held, it will not

be open for public observation. If you decide to submit only a written response, such submittals

should be sent to the NRC within 30 days of the receipt of this letter. Because this issue

involves security-related information, if you choose to respond, your response will not be made

available electronically for public inspection in the NRC Public Document Room or the NRCs

document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html. If Safeguards Information is necessary to provide an acceptable response,

please provide the level of protection described in 10 CFR 73.22. Otherwise, mark your entire

response Security-Related Information - Withhold Under 10 CFR 2.390 and follow the

instructions for withholding in 10 CFR 2.390(b)(1).

Please contact Mel Holmberg, Chief, Plant Support Branch, at (630) 829-9757, and in writing

within 10 days of the date of this letter to notify the NRC of your intended response. If we have

not heard from you within 10 days, we will continue with our significance determination and

enforcement decision and you will be advised by separate correspondence of the results of our

deliberations on this matter.

Since the NRC has not made a final determination in this matter, no Notice of Violation is being

issued for these inspection findings at this time. In addition, please be advised that the number

and characterizations of the AVs described in the enclosed inspection report may change as a

result of further NRC review.

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

B. Allen -3-

In addition, if you disagree with the cross-cutting aspect assigned to the finding in this report,

you should provide a response within 30 days of the date of this inspection report, with the basis

for your disagreement, to the Regional Administrator, Region III, and the NRC Resident

Inspector at the Davis-Besse Nuclear Power Station.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records System (PARS) component of NRC's document system, ADAMS.

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html

(the Public Electronic Reading Room). However, because of the security-related concerns

contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters

enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for

your response, if any. This practice will ensure that your response will not be made available

electronically for public inspection in the NRC Public Document Room or from the NRCs

document system, ADAMS. If Safeguards Information is necessary to provide an acceptable

response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark

your entire response Security-Related Information-Withhold Under 10 CFR 2.390 and follow

the instructions for withholding in 10 CFR 2.390(b)(1).

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

/RA/

Steven A. Reynolds

Division Director

Division of Reactor Safety

Docket No. 50-346

License No. NPF-3

Nonpublic Enclosure: Inspection Report 05000346/2012403(DRS)

w/Attachment: Supplemental Information

cc w/encl: S. Coker, NSIR/DSO/DDSO/ST

R. Albert, NSIR

T. Dimitriadis, RI

B. Desai, RII

M. Hay, RIV

M. Bear, State Liaison Officer,

Ohio Emergency Management Agency

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

B. Allen -3-

In addition, if you disagree with the cross-cutting aspect assigned to the finding in this report, you should

provide a response within 30 days of the date of this inspection report, with the basis for your

disagreement, to the Regional Administrator, Region III, and the NRC Resident Inspector at the Davis-

Besse Nuclear Power Station.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available

electronically for public inspection in the NRC Public Document Room or from the Publicly Available

Records System (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from

the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your

response, if any. This practice will ensure that your response will not be made available electronically for

public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If

Safeguards Information is necessary to provide an acceptable response, please provide the level of

protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related

Information-Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Steven A. Reynolds

Division Director

Division of Reactor Safety

Docket No. 50-346

License No. NPF-3

Nonpublic Enclosure: Inspection Report 05000346/2012403(DRS)

w/Attachment: Supplemental Information

cc w/encl: S. Coker, NSIR/DSO/DDSO/ST

R. Albert, NSIR

T. Dimitriadis, RI

B. Desai, RII

M. Hay, RIV

M. Bear, State Liaison Officer,

Ohio Emergency Management Agency

cc w/o encl: Distribution via ListServ TM

DISTRIBUTION w/o encl:

See next page

DOCUMENT NAME: DAV 2012 403 DRS OUO Cover Ltr Only.docx

9 Publicly Available 9 Non-Publicly Available 9 Sensitive 9 Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with

attach/encl "N" = No copy

OFFICE RIII RIII RIII RIII

NAME JMaynen for NEgan:jb MHolmberg PLougheed for SOrth SReynolds

DATE 09/07/12 09/07/12 09/07/12 09/07/12

OFFICIAL RECORD COPY

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

Letter to Barry Allen from Steven Reynolds dated September 7, 2012.

SUBJECT: DAVIS-BESSE NUCLEAR POWER STATION

NRC SECURITY BASELINE INSPECTION REPORT 05000346/2012403(DRS)

PRELIMINARY GREATER THAN GREEN FINDING

DISTRIBUTION w/o encl:

Silas Kennedy

RidsNrrDorlLpl3-2 Resource

RidsNrrPMDavisBesse Resource

RidsNrrDirsIrib Resource

Chuck Casto

Cynthia Pederson

Steven Orth

Jared Heck

Allan Barker

Christine Lipa

Carole Ariano

Linda Linn

DRPIII

DRSIII

Patricia Buckley

Tammy Tomczak

Nick Hilton

Dave Furst

ROPassessment.Resource@nrc.gov

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION