Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20127A049 + (22:49:46, 12 December 2024)
- ML20127A045 + (22:49:47, 12 December 2024)
- ML20127A044 + (22:49:47, 12 December 2024)
- ST-HL-AE-1263, First Interim Part 21 & Deficiency Rept Re Phoenix Steel Thun Wall Pipe.Initially Reported on 850506.Bechtel Directed to Place Hold Tags on Lengths of Pipe in Yard.Phoenix SA106 Grade B Pipe Not Installed Will Be Scrapped + (22:49:48, 12 December 2024)
- ML20127A039 + (22:49:49, 12 December 2024)
- IR 05000245/1992032 + (22:50:39, 12 December 2024)
- ML20127A036 + (22:50:40, 12 December 2024)
- ST-HL-AE-1264, Interim Part 21 & Deficiency Rept Re Core Exit Temp Measurement Sys.Initially Reported on 850509.Specific Corrective Actions for RCS Subcooling Margin Under Investigation.Next Rept by 850920.Related Correspondence + (22:50:41, 12 December 2024)
- ML20127A026 + (22:50:42, 12 December 2024)
- ML20127A027 + (22:50:42, 12 December 2024)
- ST-HL-AE-1267, First Interim Deficiency Rept Re Unanalyzed Seismic Interactions.Initially Reported on 850508.Seismic Displacement Response & Contact Sensitivity Evaluated to Establish Acceptance Criteria.Next Rept Expected by 850920 + (22:50:43, 12 December 2024)
- ML20127A022 + (22:50:44, 12 December 2024)
- ML20127A021 + (22:50:45, 12 December 2024)
- ML20127A020 + (22:50:45, 12 December 2024)
- ML20127A018 + (22:50:46, 12 December 2024)
- ML20127A017 + (22:50:47, 12 December 2024)
- ML20127A015 + (22:50:47, 12 December 2024)
- RBG-21211, Interim Deficiency Rept DR-273 Re Relocation of Rosemount Pressure Transmitters.Next Rept to Be Provided by 850613 + (22:50:48, 12 December 2024)
- ML20127A010 + (22:50:49, 12 December 2024)
- ML20127A012 + (22:50:49, 12 December 2024)
- ML20127A007 + (22:50:50, 12 December 2024)
- ML20127A005 + (22:50:51, 12 December 2024)
- RBG-21213, Interim Deficiency Rept DR-290 Re Pressure Test Performed for Charcoal Filtration Units Ductwork.Next Rept to Be Provided by 850617 + (22:50:52, 12 December 2024)
- ML20127A002 + (22:50:52, 12 December 2024)
- ML20127A000 + (22:50:53, 12 December 2024)
- ML20126M938 + (22:50:54, 12 December 2024)
- ML20126M933 + (22:50:55, 12 December 2024)
- 3F0785-33, Responds to 841001 Request for Addl Info Re Procedures Generation Package for Emergency Operating Procedures. Abnormal Transient Operating Guidelines (Atog) Comparison of Crystal River Unit 3 to Oconee Nuclear... Encl + (22:50:56, 12 December 2024)
- ML20126M932 + (22:50:56, 12 December 2024)
- ML20126M930 + (22:50:57, 12 December 2024)
- ML20126M926 + (22:50:58, 12 December 2024)
- ML20126M928 + (22:50:58, 12 December 2024)
- ML20126M924 + (22:50:59, 12 December 2024)
- ML20126M923 + (22:51:03, 12 December 2024)
- ML20126M918 + (22:51:04, 12 December 2024)
- ML20126M919 + (22:51:04, 12 December 2024)
- ML20126M915 + (22:51:05, 12 December 2024)
- ML20126M912 + (22:51:06, 12 December 2024)
- ML20126M914 + (22:51:06, 12 December 2024)
- ML20126M909 + (22:51:07, 12 December 2024)
- RBG-21212, Final Deficiency Rept DR-274 Re Improperly Rated Field Wiring Connected to Four Solenoid Operated Valves Supplied by Target Rock Corp for Air Supply Lines to Air Reservoirs. Condition Determined Not Reportable Under 10CFR50.55(e) + (22:51:08, 12 December 2024)
- 05000334/LER-1985-007, :on 841130,during QC Insp of Hydraulic Snubbers,Oil Reservoirs to Four Snubbers Positioned So That Existence of Positive Fluid Head to Snubber Seals Could Not Be Verified.Two Snubbers Found Inoperable + (22:51:10, 12 December 2024)
- ML20126M906 + (22:51:11, 12 December 2024)
- ML20126M905 + (22:51:11, 12 December 2024)
- ML20126M904 + (22:51:12, 12 December 2024)
- ML20126M900 + (22:51:13, 12 December 2024)
- ML20126M895 + (22:51:14, 12 December 2024)
- 05000334/LER-1985-009, :on 850429,investigation Revealed That Testing of Logic Trains on Nonstaggered Basis Caused Failure to Test Train a in Required Frequency.Caused by Tracking Deficiency Re Reactor Trip Response Time Testing + (22:51:16, 12 December 2024)
- ML20126M888 + (22:51:17, 12 December 2024)
- ML20126M889 + (22:51:17, 12 December 2024)
- ML20126M887 + (22:51:18, 12 December 2024)