Forwards Requalification Retake Exam/Insp Rept 50-245/92-32OL on 921214-17.One Operator Failed in Emergency Classification Part of Simulator Exam
ML20127A022
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/31/1992
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20127A025 List:
References
NUDOCS 9301110153
Download: ML20127A022 (3)


See also: IR 05000245/1992032

Text

l

. ,~Y.__>.y ~ l

v  !

t

DEC 311931

Docket No. 50-245

Mr. John F. Opeka

Executive Vice President - Nuclear

Northeast Nuclear Energy Company l

P. O. Box 270

llartford, Connecticut 06141-0270 ,

Dear Mr. Opeka:

SUBJECT: REQUALIFICATION PETAKE EXAMINATION AND INSPECTION

REPORT 50-245/92-32 (OL)

This refers to the inspection conducted and requalification retake examinations administered

-

by Mr. D. Florek and others frora December 14 - 17, 1992, at your Millstone Unit 1

Nuclear Power 50ttion. The examination was conducted in accordance with NUREG-1021,

" Operator Licensing Examiner Standards," Rev. 6. The inspection reviewed licensee actions

on prior emergency operating procedure issues, independent audits of operator training -

progrcms, and corrective actions identiDed at the December 3,1992, management meeting in

the Region ottices.

On December 17, 1992, at the conclusion of the examination and inspection, findings related

to the preparation and administration of the requalification retake examinations and inspection

findings were discussed with Mr. Ilaynes and other members of your staff identified in the

enclosed report.

Four out of the five operators examined passed the retake examination. One operator failed

in the emergency classincation part of the simulator examination. One operator that was -

scheduled for the simulator retake examination was withdrawn by the facility on the morning

of the examination.

We also acknowledge your revised implementation date of July 1993 for Bowchart based

emergency operating procedures (EOP) as identified in your December 2,1992, letter.

Section 3.0 reviewed your implementation of prior EOP issues in your flowcharts.

Section 4.0 contains an unrese'ved item regarding how the technical specifications

requirements of paragraph 6.5.3.7 to audit training of the unit staff were being met. Based .

upon the information available to the inspector, it is not clear that audits of operator training

were performed in the period of 1986 to 1992.

OFFICIAL RECORD COPY MS19232.DJF

08005G

9301110153 921231

g

PDR ADOCK 0500024S .- .;

'

.V pop t

- . - , . -, . .. _ - _ _

.

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ .

.

%

Mr. John F. Opeka 2

The report also discusses the December 3,1992, management meeting at the Region ofGees

in which you presented the facility analysis of why the 1991 remediation effort failed to

, prevent the 1992 weaknesses and the corrective actions that the facility will take. Your letter

'

dated December 7,1992, which was submitted as required by item 6 of our conGrmatory

action letter CAL l-92-014, also provided short and long term corrective actions and the

i

status of previously committed long term corrective actions. Your corrective actions will be

assessed further in future inspections of your licensed activities,

in accordance with 10 CFit 2.790 of the Commission's regulations, a copy of this letter and

the enclosures will be placed in the NRC Public Document Room.

If you have any questions, please contact Mr. R. Conte, Chief,11WR Section, at (215)

337-5210.

l

Sincerely,

Original Signed Br.  !

Lee H. Bettenhausen

Lee 11. llettenhausen, Chief

Operations liranch

Division of Reactor Safety

!

Enclosures: Inspection Report No. 50-245/92-32

w/ Attachments 1 - 4

Attachments:

Attachment 1 - Examination Test items

Attachment 2 - Persons in attendance at the December 17, 1992, Exit Meeting

Attachment 3 - Persons in attendance at the December 3,1992, Management Meeting

Attachment 4 - Licensee handouts at the December 3,1992, Management Meeting

ec w/ encl.; w/o Attachments 1 - 4:

W. D. Romberg, Vice President - Nuclear, Operations Services

H. F. Haynes, Nuclear Unit Director

R. M. Kacich, Director, Nuclear Licensing

D. O. Nordquist, Director of Quality Services -

,

Gerald Garfield, Esquire

'

Nicholas Reynolds, Esquire

NRC Resident inspector

State of Connecticut, SLO

OFFICIAL RECORD COPY MS19232.DJF

i

(

-. .

. . .._. ....._ _ ___ _ _ . _.. ._ _ . _ . . _ _ . _ _ . _ _ _ _ . _ . _ . _ . . . _ _

'

,

. t

e

Mr. John F. Opeka 3 j

cc w/ encl. and Attachments 1 - 4:

S. E. Scace, Vice President, Millstone Station .

M. Brown, Project Manager - Millstone Unit 1 '

R. Heidecker, Supervisor, Operator Training

i

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

,

bec w/ encl.; w/o Attachments 1 - 4:

Region I Docket Room (with concurrences)

- R. Gallo, Chief, OLB, NRR

V. McCree, OEDO

D. Jaffe, PM, NRR

-

R. Eckenrode, HFB, NRR -

i

J. Stolz, PD, NRR

L. Bettenhausen, DRS

J. Joyner, DRSS

R. Blough, DRP

R. Conte, DRS

L. Doerflein, DRP

D. Florek, DRS

J. H. Williams, DRS

J. S. Stewart, DRS

M. Parrish, EG&G

-

W. Raymond, SRI, Haddam Neck

P. Swetland, SRI, Millstone

-

R. Barkley, DRP

OL Facility File

DRS Files (1)

.

. bec w/ encl.; w/ Attachments 1 - 4:

Master Exam File

,

!

,

'

1D RI:DRS RI:DRS

Flat ( g Conte k! 'nhausen  !

d

it

Ij/%3 i

12/29/92 i

12, ,92 12F//92

2

OFFICIA.L RECORD COPY MS19232.DJF

L

. . . _ . . . . . . , _ . . _ _ _ _ . - .._-._..:.,., , , . . ,

. . . - . . . . , ,.. -. . . _ --.__..;...._..-..a . _ . ~ . - _ .._ ...-. ,