Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20132B209 + (15:28:24, 12 December 2024)
- ML20132B208 + (15:28:24, 12 December 2024)
- ML20132B204 + (15:28:25, 12 December 2024)
- 0CAN088507, Responds to Violations Noted in Insp Rept 50-368/85-17. Corrective Actions:Incident Reviewed W/Operations Personnel to Emphasize Importance of Category E Valve Administrative Controls & Documentation + (15:28:26, 12 December 2024)
- ML20132B202 + (15:28:26, 12 December 2024)
- ML20132B200 + (15:28:28, 12 December 2024)
- ML20132B199 + (15:28:28, 12 December 2024)
- ML20132B196 + (15:28:29, 12 December 2024)
- ML20132B195 + (15:28:30, 12 December 2024)
- ML20132B194 + (15:28:30, 12 December 2024)
- ML20132B192 + (15:28:31, 12 December 2024)
- ML20132B191 + (15:28:32, 12 December 2024)
- ML20132B190 + (15:28:32, 12 December 2024)
- ML20132B189 + (15:28:33, 12 December 2024)
- ML20132B188 + (15:28:33, 12 December 2024)
- ML20132B187 + (15:28:34, 12 December 2024)
- ML20132B184 + (15:28:35, 12 December 2024)
- ML20132B179 + (15:28:36, 12 December 2024)
- ML20132B182 + (15:28:36, 12 December 2024)
- AECM-85-0283, Corrects Response to Violations Noted in Insp Rept 50-416/85-22.Corrective Actions:Maint Work Order E53832 Issued to Replace Damaged Latch Bolt Retaining Screws on Secondary Containment Door 1A318 + (15:28:37, 12 December 2024)
- ML20132B177 + (15:28:38, 12 December 2024)
- ML20132B176 + (15:28:39, 12 December 2024)
- ML20132B175 + (15:28:39, 12 December 2024)
- ML20132B172 + (15:28:40, 12 December 2024)
- ML20132B171 + (15:28:40, 12 December 2024)
- ML20132B166 + (15:28:41, 12 December 2024)
- ML20132B165 + (15:28:42, 12 December 2024)
- ML20132B163 + (15:28:43, 12 December 2024)
- ML20132B162 + (15:28:44, 12 December 2024)
- PNO-I-96-086A, on 961205,Maine Yankee Personnel Identified Inadequate Cable Separation Issues Affecting Reactor Protection Sys.Licensee in Process of Developing Scope for Expanded Review & Process for Field Verification + (15:28:45, 12 December 2024)
- ML20132B159 + (15:28:46, 12 December 2024)
- IR 05000368/1985017 + (15:28:47, 12 December 2024)
- ML20132B155 + (15:28:47, 12 December 2024)
- ML20132B154 + (15:28:48, 12 December 2024)
- 05000155/LER-1996-003-01, :on 960118,RDS B Train Were Found Inoperable During Refueling Outage Surveillance Testing.Caused by Mechanical Binding.Disc & Seat Cleaned & Remaining Kerotest Valves Inspected + (15:28:53, 12 December 2024)
- ML20132B150 + (15:28:54, 12 December 2024)
- ML20132B148 + (15:28:55, 12 December 2024)
- ML20132B145 + (15:28:56, 12 December 2024)
- ML20132B140 + (15:28:57, 12 December 2024)
- ML20132B137 + (15:28:57, 12 December 2024)
- PNO-I-96-088A, on 961216,Amersham Corp Reported to NRC Package Containing 64-Ci Ir-192 Radiography Source,Reported Missing,Located.Carrier,Purolator,Reported Package Found at One of Depots in Sidney,Nova Scotia,Canada + (15:28:58, 12 December 2024)
- BSEP-85-1593, Responds to Violations Noted in Insp Repts 50-324/85-22 & 50-325/85-22.Corrective actions:cross-ref Between Emergency Instructions & Abnormal Operating Procedures Approved & Posted in Control Room + (15:28:59, 12 December 2024)
- ML20132B132 + (15:29:00, 12 December 2024)
- 05000374/LER-1985-029-02, :on 850610,reactor Level Switches 2B21-N037AA & AB Found to Be Piped in Reverse of Sys Design.Caused by Field Change on Design Drawings Not Transferred to Contractor Installation Drawings + (15:29:03, 12 December 2024)
- 05000370/LER-1985-008-03, :on 850425,while Repairing RCS Valve,Discovered That Valve Contained Single Threaded Stem Rather than Required Double Threaded Stem.Caused by Mfg Deficiency + (15:29:06, 12 December 2024)
- ML20132B127 + (15:29:07, 12 December 2024)
- ML20132B125 + (15:29:08, 12 December 2024)
- ML20132B122 + (15:29:09, 12 December 2024)
- PY-CEI-NRR-2119, Forwards Response to 961016 RAI Re License Amend Request for performance-based Drywell Bypass Leakage Test Program + (15:29:09, 12 December 2024)
- BVY-96-154, Monthly Operating Rept for Nov 1996 for Vermont Yankee Nuclear Power Station + (15:29:11, 12 December 2024)
- ML20132B114 + (15:29:11, 12 December 2024)