Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133D700 + (13:46:04, 12 December 2024)
- ML20133D698 + (13:46:05, 12 December 2024)
- ML20133D696 + (13:46:05, 12 December 2024)
- IR 05000219/1996011 + (13:46:14, 12 December 2024)
- ML20133D692 + (13:46:14, 12 December 2024)
- ML20133D688 + (13:46:15, 12 December 2024)
- ML20133D687 + (13:46:16, 12 December 2024)
- ML20133D685 + (13:46:16, 12 December 2024)
- 05000327/LER-1983-093-03, /03L-1:on 830706,condenser Vacuum Flow Rate Monitor 2-FT-2-257 Declared Inoperable Due to Loss of Readings.Caused by Condensation in Sense Lines at Flow Element.Annubar Flow Element Will Be Replaced + (13:46:18, 12 December 2024)
- ML20133D678 + (13:46:19, 12 December 2024)
- ML20133D679 + (13:46:19, 12 December 2024)
- ST-HL-AE-1375, First Interim Deficiency Rept Re Document Control Ctr Personnel Checking Uncontrolled Bechtel Std Computer Programs Manual in Violation of Procedures.Initially Reported on 850905.Next Rept Will Be Submitted by 851220 + (13:46:20, 12 December 2024)
- ML20133D666 + (13:46:21, 12 December 2024)
- ML20133D665 + (13:46:22, 12 December 2024)
- LD-85-035, Application for Amend to CESSAR Final Design Approval Closing Issues Listed in Encl a Re Final Design Approval 2 & Encl B Listing Correspondence Subsequent to Sser (NUREG-0852).Fee Paid + (13:46:23, 12 December 2024)
- ML20133D661 + (13:46:23, 12 December 2024)
- PLA-2504, Provides Final Response to IE Bulletin 83-03.Insps of Check Valves Planned for Unit 1 Refueling Outages.Initial Valve Insps Determined One Valve to Be Partially Disassembled. Valve Reassembled & Disc Nut Pin Properly Peened + (13:46:24, 12 December 2024)
- ML20133D657 + (13:46:26, 12 December 2024)
- 05000374/LER-1985-032-02, :on 850701,leak Detection Temp Sensors Determined to Render Div I & II Ld Isolation Sys for Differential Temp Inoperable,As Identified on 850524.Sensors Relocated to Proper Position + (13:46:27, 12 December 2024)
- ML20133D652 + (13:46:29, 12 December 2024)
- ML20133D642 + (13:46:31, 12 December 2024)
- ML20133D641 + (13:46:32, 12 December 2024)
- ST-HL-AE-1297, Forwards Response to Action Item 24, Testing of P-4 Interlock, Identified During 850326-29 Meetings W/Nrc to Discuss Issues & Questions Re Instrumentation & Controls Design Features & Program Implementation + (13:46:33, 12 December 2024)
- ML20133D637 + (13:46:33, 12 December 2024)
- ML20133D632 + (13:46:35, 12 December 2024)
- ML20133D630 + (13:46:36, 12 December 2024)
- PNO-II-85-067, on 850712,main Generator Trip & Reactor Trip Occurred.Caused by Damaged Permanent Magnet Generator. Permanent Magnet Generator Being Replaced & Main Generator Bearings Being Evaluated.Plant to Be Restarted on 850723 + (13:46:37, 12 December 2024)
- ML20133D628 + (13:46:37, 12 December 2024)
- ML20133D622 + (13:46:38, 12 December 2024)
- ML20133D620 + (13:46:39, 12 December 2024)
- ML20133D618 + (13:46:41, 12 December 2024)
- ML20133D607 + (13:46:42, 12 December 2024)
- ST-HL-AE-1365, Revised Final Deficiency Rept Re Containment Isolation Valves for Auxiliary Feedwater Sys (Afw).Initially Reported on 830822.New Qualified Valves Purchased.Table 3.9-1.2 of FSAR Modified to Include Five AFW Valves + (13:46:44, 12 December 2024)
- ML20133D606 + (13:46:44, 12 December 2024)
- ST-HL-AE-1258, Responds to Violations Noted in Insp Repts 50-498/85-01 & 50-499/85-01 on 850429.Corrective Actions:Procedural Enhancements Implemented for Control of Temporary Installations.Related Correspondence + (13:46:45, 12 December 2024)
- ML20133D599 + (13:46:46, 12 December 2024)
- ML20133D597 + (13:46:47, 12 December 2024)
- AECM-85-0132, Responds to NRC Re Violations Noted in Insp Rept 50-416/84-48.Corrective Actions:Certified Matl Closure Plates Reviewed to Provide Assurance That Condition Identified by Nonconformance Rept 6314 Is Isolated Case + (13:46:48, 12 December 2024)
- ML20133D595 + (13:46:48, 12 December 2024)
- ML20133D593 + (13:46:49, 12 December 2024)
- ML20133D591 + (13:46:49, 12 December 2024)
- ML20133D588 + (13:46:50, 12 December 2024)
- ML20133D584 + (13:46:51, 12 December 2024)
- RBG-21452, Final Deficiency Rept DR-307 Re Pipe Fittings Mfg by Bonney Forge & Shipped from Carlinville Plant That Did Not Receive Chemical Overcheck.One Pipe Fitting Installed.Condition Not Reportable Under 10CFR50.55(e) + (13:46:52, 12 December 2024)
- ML20133D577 + (13:46:53, 12 December 2024)
- PNO-IV-85-054, on 851005,reactor Manually Tripped Due to Sudden Increase in Vibration of Low Pressure Turbine Elements in Main Turbine Condensate Activity.Caused by Possible Damage to Condenser Tubes.State of Ne Informed + (13:46:54, 12 December 2024)
- ML20133D570 + (13:46:54, 12 December 2024)
- ML20133D568 + (13:46:55, 12 December 2024)
- ML20133D565 + (13:46:56, 12 December 2024)
- ML20133D567 + (13:46:56, 12 December 2024)
- ST-HL-AE-1291, Final Deficiency Rept Re Potential Failure of Portable Water Line in Relay Room.Initially Reported on 850606.Item Will Be Tracked as Part of Incident Review Committee Work Plans.Item Not Reportable Under 10CFR50.55(e) + (13:46:57, 12 December 2024)