ML20133D622

From kanterella
Jump to navigation Jump to search
Rev 3 to Notification of Significant Licensee Meeting 96-128 W/Util in King of Prussia,Pa Re Predecisional EC to Discuss Plant Operation W/Two of Three Power Operated Relief Valve Block Valves Shut for Extended Period of Time
ML20133D622
Person / Time
Site: Beaver Valley
Issue date: 01/02/1997
From: Eselgroth P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
96-128, EA-96-462, EA-96-540, NUDOCS 9701100011
Download: ML20133D622 (2)


Text

_ _ _ _ _ _ . _ _ _ _ _ _ . _ . . __ __ _ - _ _ . _ _ _ _ . . _ _ _. . ___-

- January 2,1997 U.S. NUCLEAR REGULATORY COMMISSION No.96-128 l REGION l EA Nos.96-462 l NOTICE OF SIGNIFICANT LICENSEE MEETINGS96-540 REVISION 3 Licensee: Duquesne Light Company l

l Facility: Beaver Valley Power Station .

Docket No.: 50-334,50-412 Time and Date: 10:00 a.m., Thursday, January 16,1997 l

l Location: US Nuclear Regulatory Commission, RI Public Meeting Room King of Prussia, PA

Purpose:

Predecisional Enforcement Conference to discuss plant operation (Unit 1) with two of three power operated relief valve block valves shut for an extended period of time and to discuss deficiencies associated with leak sealant repairs on the Unit 2 head vent system NRC Attendees: W. Kane, Deputy Regional Administrator, RI R. Cooper,11, Director, Division of Reactor Projects (DRP),

Region i P. Eselgroth, Chief, Projects Branch 7, Division of Reactor Projects D. Brinkman, Licensing Project Manager, NRR D. Kern, Senior Resident inspector, Beaver Valley T. Walker, Senior Enforcement Specialist, Region I Licensee Attendees: J. Cross, President, Generation Group T. Noonan, Vice President, Nuclear Operations S. Jain, Vice President of Nuclear Services

~

B. Tuite, General Manager, Nuclear Operations L. Freeland, Manager, Nuclear Engineering Department R. Brosi, Manager, Nuclear Safety J. Arias, Manager, Licensing Note: This meeting is open to the public for observation. Attendance by additional NRC personnel or handicapped persons requiring assistance to attend or participate in the meeting should make their requests known by January 13,1997, to Peter Eselgroth, Region I, at 610-337-5234.

Approved By: Oriainal Sioned By Peter W. Eselgroth, Chief l

l Projects Branch 7 Division of Reactor Projects l /)

l 9701100011 970102 l PDR ADOCK 05000334 G PDR ,

)

\

V

4 Distribution:

J. E. Cross, President, Generation Group PUBLIC Commonwealth of Pennsylvania Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region i Receptionist t

l Distribution Nia E-Mail):

l J. Taylor, Executive Director for Operations J. Milhoan, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research (DEDR) t H. Thompson, Deputy Executive Director for Nuclear Material Safety, Safeguards i and Operations Support (DEDS)

B. Grimes, Deputy Director, Division of Reactor Program Management, NRR R. Spessard, Deputy Director, Division of Reactor Controls and Human Factors, NRR J. Lieberman, Director, Office of Enforcement F. Miraglia, Director, Office of Nuclear Reactor Regulation A. Thadani, Associate Director of Technical Review, NRR R. Zimmerman, Associate Director for Projects, NRR l S. Varga, Director, Division of Reactor Projects - t/11, NRR ,

J. Zwolinski, Acting Director, Project Directorate 1-3, NRR W. Dean, Regional Coordinator, OEDO N. Green, Jr., ORA, RES l J. Stolz, Director, Project Directorate 1-2, NRR D. Brinkman, PD l-2, NRR l J. Goldberg, OGC D. Screnci, Public Affairs Officer, RI N. Sheehan, Field Public Affairs Officer, RI D. Kern, Rl C. Lyon, RI M. Campion, ORA D. Chawaga, ORA C. Gordon, ORA DOCUMENT NAME: A:\01-16-97.BV l To recoh,e a copy of this docurnent, indicate in the boa: "C" = Copy without attachment / enclosure "E" = Copy with attachment /enclosu,e "N" = No copy 0FFICE RI:DRP .

,l RI: l l NAME PEselgroth htt/ ret DATE 42/04/05 - //t/q7 0FFICIAL RECORD COPY i

l l

1 l

- _