Final Deficiency Rept (Rdc 111(84)) Re Inclusion of Preoperational Fuel Pool Gates Test Requirements in Test Specs Initiated by Gilbert/Commonwealth,Inc.Test Procedure Assurance Review Plan Issued & Evaluation Ongoing
ML20133D588
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 07/23/1985
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
(RDC-111(84)), DAR-194, PY-CEI-OIE-0081, PY-CEI-OIE-81, NUDOCS 8508070382
Download: ML20133D588 (2)


Text

i brn @

f THE CLEVELAND ELECTR P.O. BOX 5000 - CLEVELAND OHIO 44101 - TELEPHONE (216) 622-9800 - lLLUMINATING BLOG.

- 55 PUBLIC SQUARE Semng The Best Location in the Nation July 23, 1985 MURFMY R. EDRMAN PY-CEI/OIE 0081 L vice mtsioENT NUCUAR Mr. James G. Keppler Regional Administrator, Region III office of Inspection and Enforcement U.S. Nuclear Regulator Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE:

Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Fuel Pool Gates Preoperational Test Requirements (RDC 111(84)]

Dear Mr. Keppler:

This letter supplements our report pursuant to 10CFR50.55(e) concerning the inclusion of preoperational testing requirements in test specifications initiated by Gilbert / Commonwealth, Inc. for the Perry Nuclear Power Plant (PNPP).

This deficiency has been evaluated per Deviation Analysis Report (DAR) 194 and a report of the results of that evaluation was transmitted to your office on February 28, 1985.

Since the submittal of the report on February 28, 1985, The Cleveland Electric Illuminating Company has taken additional action to assure that the PNPP test program meets regulatory requirements and test commitments.

Specifically, a Management Procedure Review Team (MPRT), consisting of senior level personnel with extensive testing and design experience, was formed to eval-uate test procedures and provide recommendation to the Project Management.

As a result of the MPRT evaluation, a Special Project Plan titled " Test Procedure Assurance Review" was issued to implement the recommendations of the team.

This Special Project Plan provides a detailed plan to identify and correct any inade-quacies in test procedures at PNPP.

The key provisions of this plan include the following:

A review of all preoperational and selected acceptance test procedures by MPRT.

Reinforcement of attention to detail to ensure technical adequacy of the test procedures.

Increased supervisory involvement during the evolution and conduct of test procedures and revisions.

Additional training of test personnel.

8508070382Ogjo$$40 ho PDR ADOCK PDR s

ZM7

Mr. Jcm:0 G. Kappler July 23, 1985 PY-CEI/OIE 0081 L Re-review of licensing commitments.

-Periodic progresa reports and a final summary of findings and actions taken as a result of the Special Project Plan.

A Quality Assurance audit of the performance and effec-tiveness of the Special Project Plan.

Copies of the MPRT final report and the Special Project Plan have been provided to members of your staff and provisions have been established for their review of the results of these efforts.

Special Project Plan, " Test Procedure Assurance Review", will provide a comprehensive evaluation of test procedure commitment identification and test methodology.

This effort will augment the review of Test Specifications performed as a result of DAR 194.

The Review of GAI Test Specifications required by DAR 194 has been completed and is available for review.

This is the final report pursuant to 10CFR50.55(e) regarding DAR 194.

The periodic progress reports and final summary of the results of the Special Project Plan will be available for review at the PNPP site.

If you have any questions regarding this matter, please call.

Sincerely,

'h Murra

. Edelman Vice President Nuclear Group MRE sab cc:

J. A. Grobe D.

E.

Keating J. Stefano Director i

Office of Inspection and Enforcement U.S.

Nuclear Regulatory Commission Washington, D.C.

20555 U.S. Nuclear Regulatory Commission c/o Document Management Brarch Washington, D.C. 20555 Records Center, SEE IN Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 3039 L

i