Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000440/1985041 + (13:46:03, 12 December 2024)
- ML20133D700 + (13:46:04, 12 December 2024)
- ML20133D698 + (13:46:05, 12 December 2024)
- ML20133D696 + (13:46:05, 12 December 2024)
- IR 05000219/1996011 + (13:46:14, 12 December 2024)
- ML20133D692 + (13:46:14, 12 December 2024)
- ML20133D688 + (13:46:15, 12 December 2024)
- ML20133D687 + (13:46:16, 12 December 2024)
- ML20133D685 + (13:46:16, 12 December 2024)
- 05000327/LER-1983-093-03, /03L-1:on 830706,condenser Vacuum Flow Rate Monitor 2-FT-2-257 Declared Inoperable Due to Loss of Readings.Caused by Condensation in Sense Lines at Flow Element.Annubar Flow Element Will Be Replaced + (13:46:18, 12 December 2024)
- ML20133D678 + (13:46:19, 12 December 2024)
- ML20133D679 + (13:46:19, 12 December 2024)
- ST-HL-AE-1375, First Interim Deficiency Rept Re Document Control Ctr Personnel Checking Uncontrolled Bechtel Std Computer Programs Manual in Violation of Procedures.Initially Reported on 850905.Next Rept Will Be Submitted by 851220 + (13:46:20, 12 December 2024)
- ML20133D666 + (13:46:21, 12 December 2024)
- ML20133D665 + (13:46:22, 12 December 2024)
- LD-85-035, Application for Amend to CESSAR Final Design Approval Closing Issues Listed in Encl a Re Final Design Approval 2 & Encl B Listing Correspondence Subsequent to Sser (NUREG-0852).Fee Paid + (13:46:23, 12 December 2024)
- ML20133D661 + (13:46:23, 12 December 2024)
- PLA-2504, Provides Final Response to IE Bulletin 83-03.Insps of Check Valves Planned for Unit 1 Refueling Outages.Initial Valve Insps Determined One Valve to Be Partially Disassembled. Valve Reassembled & Disc Nut Pin Properly Peened + (13:46:24, 12 December 2024)
- ML20133D657 + (13:46:26, 12 December 2024)
- 05000374/LER-1985-032-02, :on 850701,leak Detection Temp Sensors Determined to Render Div I & II Ld Isolation Sys for Differential Temp Inoperable,As Identified on 850524.Sensors Relocated to Proper Position + (13:46:27, 12 December 2024)
- ML20133D652 + (13:46:29, 12 December 2024)
- ML20133D642 + (13:46:31, 12 December 2024)
- ML20133D641 + (13:46:32, 12 December 2024)
- ST-HL-AE-1297, Forwards Response to Action Item 24, Testing of P-4 Interlock, Identified During 850326-29 Meetings W/Nrc to Discuss Issues & Questions Re Instrumentation & Controls Design Features & Program Implementation + (13:46:33, 12 December 2024)
- ML20133D637 + (13:46:33, 12 December 2024)
- ML20133D632 + (13:46:35, 12 December 2024)
- ML20133D630 + (13:46:36, 12 December 2024)
- PNO-II-85-067, on 850712,main Generator Trip & Reactor Trip Occurred.Caused by Damaged Permanent Magnet Generator. Permanent Magnet Generator Being Replaced & Main Generator Bearings Being Evaluated.Plant to Be Restarted on 850723 + (13:46:37, 12 December 2024)
- ML20133D628 + (13:46:37, 12 December 2024)
- ML20133D622 + (13:46:38, 12 December 2024)
- ML20133D620 + (13:46:39, 12 December 2024)
- ML20133D618 + (13:46:41, 12 December 2024)
- ML20133D607 + (13:46:42, 12 December 2024)
- ST-HL-AE-1365, Revised Final Deficiency Rept Re Containment Isolation Valves for Auxiliary Feedwater Sys (Afw).Initially Reported on 830822.New Qualified Valves Purchased.Table 3.9-1.2 of FSAR Modified to Include Five AFW Valves + (13:46:44, 12 December 2024)
- ML20133D606 + (13:46:44, 12 December 2024)
- ST-HL-AE-1258, Responds to Violations Noted in Insp Repts 50-498/85-01 & 50-499/85-01 on 850429.Corrective Actions:Procedural Enhancements Implemented for Control of Temporary Installations.Related Correspondence + (13:46:45, 12 December 2024)
- ML20133D599 + (13:46:46, 12 December 2024)
- ML20133D597 + (13:46:47, 12 December 2024)
- AECM-85-0132, Responds to NRC Re Violations Noted in Insp Rept 50-416/84-48.Corrective Actions:Certified Matl Closure Plates Reviewed to Provide Assurance That Condition Identified by Nonconformance Rept 6314 Is Isolated Case + (13:46:48, 12 December 2024)
- ML20133D595 + (13:46:48, 12 December 2024)
- ML20133D593 + (13:46:49, 12 December 2024)
- ML20133D591 + (13:46:49, 12 December 2024)
- ML20133D588 + (13:46:50, 12 December 2024)
- ML20133D584 + (13:46:51, 12 December 2024)
- RBG-21452, Final Deficiency Rept DR-307 Re Pipe Fittings Mfg by Bonney Forge & Shipped from Carlinville Plant That Did Not Receive Chemical Overcheck.One Pipe Fitting Installed.Condition Not Reportable Under 10CFR50.55(e) + (13:46:52, 12 December 2024)
- ML20133D577 + (13:46:53, 12 December 2024)
- PNO-IV-85-054, on 851005,reactor Manually Tripped Due to Sudden Increase in Vibration of Low Pressure Turbine Elements in Main Turbine Condensate Activity.Caused by Possible Damage to Condenser Tubes.State of Ne Informed + (13:46:54, 12 December 2024)
- ML20133D570 + (13:46:54, 12 December 2024)
- ML20133D568 + (13:46:55, 12 December 2024)
- ML20133D565 + (13:46:56, 12 December 2024)
- ML20133D567 + (13:46:56, 12 December 2024)