Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133P566 + (12:12:55, 12 December 2024)
- ML20133P563 + (12:12:56, 12 December 2024)
- ML20133P562 + (12:12:57, 12 December 2024)
- ML20133P561 + (12:12:58, 12 December 2024)
- ML20133P559 + (12:12:58, 12 December 2024)
- ML20133P557 + (12:12:59, 12 December 2024)
- ML20133P556 + (12:12:59, 12 December 2024)
- ML20133P555 + (12:13:00, 12 December 2024)
- IR 05000285/1985018 + (12:13:01, 12 December 2024)
- ML20133P551 + (12:13:02, 12 December 2024)
- ML20133P549 + (12:13:03, 12 December 2024)
- ML20133P548 + (12:13:03, 12 December 2024)
- ML20133P547 + (12:13:04, 12 December 2024)
- 05000373/LER-1996-021-03, :on 961217,identified Inconsistency Between TS Clarification Re Main Control Room Atmospheric Control Sys (Mcracs) Radiation Monitoring Sys & TS 3.4.7.1.Caused by Inadequate Review.Will Issue Supplemental LER + (12:13:06, 12 December 2024)
- ML20133P543 + (12:13:07, 12 December 2024)
- ML20133P542 + (12:13:08, 12 December 2024)
- ML20133P540 + (12:13:08, 12 December 2024)
- ML20133P539 + (12:13:09, 12 December 2024)
- ST-HL-AE-1464, Forwards Response to Draft Ser/Fsar Chapter 7A,Item II.F.2 Open Items.Listed Items Correspond to Internal List of Items for Completion Given to Np Kadambi by Me Powell on 851008. Marked-up FSAR Pages Will Be Incorporated Into Amend + (12:13:10, 12 December 2024)
- ML20133P536 + (12:13:10, 12 December 2024)
- 05000373/LER-1996-020-04, :on 961217,discovered Div 2 Piping Supplying RHR Heat Exchanger Out of Design Basis.Cause Indeterminate. Installed Keep Fill Sys to Eliminate Potential for Water Hammer During Design Basis Events + (12:13:12, 12 December 2024)
- ML20133P533 + (12:13:13, 12 December 2024)
- ML20133P531 + (12:13:14, 12 December 2024)
- ML20133P532 + (12:13:14, 12 December 2024)
- ML20133P529 + (12:13:15, 12 December 2024)
- ML20133P528 + (12:13:16, 12 December 2024)
- 05000219/LER-1996-015, :on 961220,determined RWCU Isolation Valves May Not Operate During Line Break Due to non-conservative Analysis.Provided Interim Guidance to Licensed Operators Re RWCU Sys & Bypassed Thermal Overloads + (12:13:18, 12 December 2024)
- ML20133P525 + (12:13:19, 12 December 2024)
- ML20133P526 + (12:13:19, 12 December 2024)
- IR 05000333/1985026 + (12:13:20, 12 December 2024)
- ML20133P522 + (12:13:21, 12 December 2024)
- ML20133P521 + (12:13:25, 12 December 2024)
- ML20133P518 + (12:13:26, 12 December 2024)
- ML20133P520 + (12:13:26, 12 December 2024)
- ML20133P516 + (12:13:27, 12 December 2024)
- ML20133P514 + (12:13:28, 12 December 2024)
- ML20133P513 + (12:13:29, 12 December 2024)
- 05000354/LER-1996-028-01, :on 961220,potential Loss of Containment Integrity Occurred Due to Water Hammer in Drywell Cooler Piping.Administrative Controls Were Implemented to Prevent Defeating of Drywell Cooler Isolation Interlocks + (12:13:31, 12 December 2024)
- ML20133P511 + (12:13:32, 12 December 2024)
- ST-HL-AE-5548, Submits Changes Re Physical Security Plan,Rev 7A.Encl Withheld + (12:13:32, 12 December 2024)
- ML20133P507 + (12:13:33, 12 December 2024)
- 05000354/LER-1996-028, Forwards LER 96-028-00,submitted Pursuant to Requirements of 10CFR50.73(a)(2)(v).Commitments Listed + (12:13:34, 12 December 2024)
- ML20133P503 + (12:13:34, 12 December 2024)
- IR 05000352/1985028 + (12:13:36, 12 December 2024)
- ML20133P500 + (12:13:36, 12 December 2024)
- W3P85-3253, Forwards Info Re Operating Experience,Superseding Re Shift Supervisors.Util Will Meet Operating Staff Requirements W/O Use of Shift Supervisors,Per 851031 Attachment 2 to License NPF-38 + (12:13:37, 12 December 2024)
- ML20133P497 + (12:13:38, 12 December 2024)
- ML20133P495 + (12:13:39, 12 December 2024)
- ML20133P496 + (12:13:39, 12 December 2024)
- ML20133P492 + (12:13:40, 12 December 2024)
- ML20133P491 + (12:13:40, 12 December 2024)