Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20134H181 + (09:23:05, 12 December 2024)
- ML20134H179 + (09:23:06, 12 December 2024)
- ML20134H177 + (09:23:07, 12 December 2024)
- PNO-III-85-074, on 850822,both Diesel Generators Technically Inoperable.Caused by Simultaneous Rather than Sequential Transfer of Power for Four RHR & Two Core Spray Pumps from Standby Transformers.Switches Placed in Test Position + (09:23:07, 12 December 2024)
- ML20134H175 + (09:23:08, 12 December 2024)
- ML20134H173 + (09:23:09, 12 December 2024)
- RBG-21822, Forwards Updated FSAR Table 2.5-20 for River Bend Station Unit 1,reflecting Revised Design Differential Settlement Ranges.No Change to Tech Specs Required + (09:23:10, 12 December 2024)
- ML20134H169 + (09:23:10, 12 December 2024)
- NSD-NRC-96-4876, Forwards Tables Identifying Documents Which Form Licensing Basis for Passive Containment Cooling Sys Design Basis Analysis Containment P/T Transient Calculations Using Wgothic Computer Code + (09:23:11, 12 December 2024)
- ML20134H166 + (09:23:12, 12 December 2024)
- ML20134H163 + (09:23:14, 12 December 2024)
- ML20134H164 + (09:23:14, 12 December 2024)
- IR 05000458/1996027 + (09:23:29, 12 December 2024)
- ML20134H160 + (09:23:30, 12 December 2024)
- ML20134H159 + (09:23:31, 12 December 2024)
- NSD-NRC-97-4965, Forwards Written Responses & Proposed SSAR Revs to Address Discussion Items in + (09:23:32, 12 December 2024)
- B15960, Provides Addl Info Which Supports Evaluation of Unacceptable Behavior of Siemens Large Break LOCA Methods Used for Plant + (09:23:36, 12 December 2024)
- RBG-21884, Forwards Equipment Survivability Enhancement. Hydrogen Control Owners Group quarter-scale Testing Performed 17 Scoping Tests Demonstrating That Hydrogen Burn Phenomena Modeled by CLASIX-3 Computer Does Not Occur + (09:23:36, 12 December 2024)
- ML20134H152 + (09:23:41, 12 December 2024)
- ML20134H151 + (09:23:41, 12 December 2024)
- ML20134H150 + (09:23:42, 12 December 2024)
- ML20134H149 + (09:23:43, 12 December 2024)
- ML20134H148 + (09:23:44, 12 December 2024)
- IR 05000341/1996017 + (09:23:47, 12 December 2024)
- ML20134H146 + (09:23:49, 12 December 2024)
- B11668, Advises That,Based on 850709 Proposed Revs to Tech Specs Addressing 10CFR50.73 & 50.72 Per Generic Ltr 83-43, Integrated Safety Assessment Program Topic 1.38 Complete. Topic Resolved W/Issuance of Proposed Changes + (09:23:50, 12 December 2024)
- ML20134H142 + (09:23:51, 12 December 2024)
- RBG-43327, Forwards Rev 1 to Rbs,Cycle 7 COLR for Aug 1996 & 24A5188, Rev 2, Suppl Reload Licensing Rept for RBS Reload 6,Cycle 7, Dtd June 1996 + (09:23:51, 12 December 2024)
- ML20134H141 + (09:23:52, 12 December 2024)
- ML20134H139 + (09:23:53, 12 December 2024)
- ML20134H138 + (09:23:54, 12 December 2024)
- ML20134H136 + (09:23:55, 12 December 2024)
- ML20134H137 + (09:23:55, 12 December 2024)
- ML20134H134 + (09:23:56, 12 December 2024)
- ML20134H133 + (09:23:57, 12 December 2024)
- ML20134H132 + (09:23:58, 12 December 2024)
- ML20134H130 + (09:23:58, 12 December 2024)
- ML20134H129 + (09:23:59, 12 December 2024)
- ML20134H128 + (09:24:00, 12 December 2024)
- ML20134H126 + (09:24:00, 12 December 2024)
- ML20134H123 + (09:24:01, 12 December 2024)
- ML20134H121 + (09:24:02, 12 December 2024)
- ML20134H120 + (09:24:03, 12 December 2024)
- ML20134H119 + (09:24:03, 12 December 2024)
- ML20134H117 + (09:24:04, 12 December 2024)
- ML20134H114 + (09:24:05, 12 December 2024)
- ML20134H112 + (09:24:06, 12 December 2024)
- ML20134H109 + (09:24:07, 12 December 2024)
- ML20134H105 + (09:24:08, 12 December 2024)
- IR 05000295/1996017 + (09:24:25, 12 December 2024)
- ML20134H101 + (09:24:26, 12 December 2024)
- ML20134H100 + (09:24:27, 12 December 2024)