Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20135C008 + (07:37:36, 12 December 2024)
- ML20135C004 + (07:37:37, 12 December 2024)
- ML20135C007 + (07:37:37, 12 December 2024)
- ML20135C003 + (07:37:38, 12 December 2024)
- ML20135C000 + (07:37:41, 12 December 2024)
- ML20135B998 + (07:37:42, 12 December 2024)
- ML20135B997 + (07:37:42, 12 December 2024)
- ML20135B995 + (07:37:43, 12 December 2024)
- ML20135B993 + (07:37:44, 12 December 2024)
- ML20135B992 + (07:37:45, 12 December 2024)
- ML20135B990 + (07:37:46, 12 December 2024)
- ML20135B985 + (07:37:47, 12 December 2024)
- ML20135B986 + (07:37:47, 12 December 2024)
- ML20135B983 + (07:37:48, 12 December 2024)
- 05000280/LER-1984-020, :on 840926,reactor Trip Occurred Due to Reactor Coolant Pump (RCP) Motor C Trip.Caused by Complete Separation of Phase Main Load Connection Bus Bar A.All Bus Bars in RCP Replaced + (07:37:50, 12 December 2024)
- ML20135B981 + (07:37:51, 12 December 2024)
- ML20135B978 + (07:37:52, 12 December 2024)
- ML20135B980 + (07:37:52, 12 December 2024)
- 05000454/LER-1985-078, :on 850807,during Delta I Calibrs,Reactor Tripped on Power Range High Negative Flux Rate.Caused by Personnel Error.Instrument Maint Dept Personnel Counseled & Surveillance Procedures Revised + (07:37:54, 12 December 2024)
- ML20135B975 + (07:37:55, 12 December 2024)
- ML20135B971 + (07:37:56, 12 December 2024)
- ML20135B967 + (07:37:57, 12 December 2024)
- ML20135B964 + (07:37:57, 12 December 2024)
- ML20135B961 + (07:37:58, 12 December 2024)
- ML20135B959 + (07:37:59, 12 December 2024)
- ML20135B955 + (07:38:00, 12 December 2024)
- ML20135B951 + (07:38:01, 12 December 2024)
- ML20135B950 + (07:38:01, 12 December 2024)
- ML20135B947 + (07:38:02, 12 December 2024)
- ML20135B940 + (07:38:04, 12 December 2024)
- ML20135B943 + (07:38:04, 12 December 2024)
- 05000304/LER-1985-015-06, :on 850809,during Aircraft Fire Detection Sys Test (PT-210),diesel Generator 2A & 2B Room Ventilation Fan Outlet Butterfly Dampers Failed to Close.Caused by Stuck Pilot Valves.Valves Replaced + (07:38:06, 12 December 2024)
- JAFP-96-0474, Responds to NRC Re Violations Noted in Insp Rept 50-333/96-06.Corrective Action:Training on Procedure Changes Was Conducted with Plant Staff + (07:38:07, 12 December 2024)
- ML20135B935 + (07:38:08, 12 December 2024)
- ML20135B933 + (07:38:08, 12 December 2024)
- 05000295/LER-1985-029-03, :on 850808,during Aircraft Fire Detection Sys Test (PT-210),diesel Generator 1A & 1B Room Ventilation Fan Outlet Butterfly Dampers Failed to Close at Proper Time. Caused by Stuck Pilot Valves.Valves Replaced + (07:38:10, 12 December 2024)
- ML20135B928 + (07:38:11, 12 December 2024)
- ML20135B924 + (07:38:12, 12 December 2024)
- ML20135B922 + (07:38:14, 12 December 2024)
- ML20135B921 + (07:38:15, 12 December 2024)
- 05000315/LER-1985-038, :on 850806 & 23,during Surveillance Testing, ESF Ventilation Sys Charcoal Absorber Banks Inoperable. Caused by Carbon Settling in Banks.Investigation of Event & Generic Implications Underway + (07:38:16, 12 December 2024)
- ML20135B919 + (07:38:17, 12 December 2024)
- ML20135B916 + (07:38:18, 12 December 2024)
- ML20135B908 + (07:38:19, 12 December 2024)
- ML20135B906 + (07:38:20, 12 December 2024)
- ML20135B902 + (07:38:21, 12 December 2024)
- ML20135B900 + (07:38:21, 12 December 2024)
- ML20135B897 + (07:38:22, 12 December 2024)
- 05000304/LER-1985-005-09, :on 850806,discovered That Svc Bus Undervoltage Start of steam-driven Auxiliary Feedwater Pump Not Tested Per Tech Spec Table 4.4-1.Procedure PT-5C Prepared & Will Be Placed on Surveillance Schedule by 851115 + (07:38:24, 12 December 2024)
- ML20135B892 + (07:38:29, 12 December 2024)
- ML20135B888 + (07:38:30, 12 December 2024)
- ML20135B884 + (07:38:31, 12 December 2024)