....w t
O PS G Company Public Sennce Electne and Gas 80 Park Plaza, Newark, NJ 07101/ 201430 8217 MAILING ADDRESS / P.O. Box 570, Newmk NJ 07101 Robert L. Mitti General Manager Nuclear Assurance and Regulation September 9, 1985 1
i Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, MD 20814 Attention:
Mr. Walter Butler, Chief Licensing Branch 2 Division of Licensing
)
l Gentlemen:
REPLACEMENT PARTS FOR ASME SECTION III COMPONENTS HOPE CREEK GENERATING STATION i
j DOCKET NO. 50-354 It has come to the at.tention of Public Service Electric and i
Gas Company (PSE&G) that some manufacturers from whom ASME Code Section III "N" stamped components were originally 1
purchased have discontinued their "N" stamp.
When procuring i
replacement parts, it is sometimes necessary due to component function, or size to procure the part from the i
original manufacturer to ensure compatibility.
In the l
cases, where the original manufacturer has discontinued i
being a stamp holder, PSE&G requests permission to procure the replacement part without an "N" stamp.
}
These parts would be procured to meet all the ASME Section III requirements, including all appropriate quality j
assurance requirements in NCA of Section III, with the 1
i exception of the "N" stamp.
The quality assurance l
requirements will comply with 10 CPR Part 50, Appendix B.
l Parts procured from manufacturers who no longer have an ASME i
certificate of Authorization will be subject to 100 percent inspection by PSE&G.
In addition, these parts will be qualified for service and will meet the requirements of IEEE 323-74 and IEEE 344-75.
Surveillance requirements to
~l.
periodically demonstrate operability will be implemented in accordance with the in-service testing program.
%N
@OO
'[/
A D
The Energy People mrnn m
5 Dir. of Nucl. React. Reg.
2 9/9/85 Should you have any questions in this regard, please contact us.
Very truly yours, l
/lI f
(
VV, C
D. H. Wagner USNRC Licensing Project Manager A.
R.
Blough USNRC Senior Resident Inspector AA1 1/2