Requests Permission to Procure Replacement Parts for ASME Section III Components W/O N Stamp in Cases Where Manufacturer No Longer Stamp Holder
ML20135B950
Person / Time
Site: Hope Creek 
Issue date: 09/09/1985
From: Mittl R
Public Service Enterprise Group
To: Butler W
Office of Nuclear Reactor Regulation
References
NUDOCS 8509110235
Download: ML20135B950 (2)


Text

_. _

....w t

O PS G Company Public Sennce Electne and Gas 80 Park Plaza, Newark, NJ 07101/ 201430 8217 MAILING ADDRESS / P.O. Box 570, Newmk NJ 07101 Robert L. Mitti General Manager Nuclear Assurance and Regulation September 9, 1985 1

i Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, MD 20814 Attention:

Mr. Walter Butler, Chief Licensing Branch 2 Division of Licensing

)

l Gentlemen:

REPLACEMENT PARTS FOR ASME SECTION III COMPONENTS HOPE CREEK GENERATING STATION i

j DOCKET NO. 50-354 It has come to the at.tention of Public Service Electric and i

Gas Company (PSE&G) that some manufacturers from whom ASME Code Section III "N" stamped components were originally 1

purchased have discontinued their "N" stamp.

When procuring i

replacement parts, it is sometimes necessary due to component function, or size to procure the part from the i

original manufacturer to ensure compatibility.

In the l

cases, where the original manufacturer has discontinued i

being a stamp holder, PSE&G requests permission to procure the replacement part without an "N" stamp.

}

These parts would be procured to meet all the ASME Section III requirements, including all appropriate quality j

assurance requirements in NCA of Section III, with the 1

i exception of the "N" stamp.

The quality assurance l

requirements will comply with 10 CPR Part 50, Appendix B.

l Parts procured from manufacturers who no longer have an ASME i

certificate of Authorization will be subject to 100 percent inspection by PSE&G.

In addition, these parts will be qualified for service and will meet the requirements of IEEE 323-74 and IEEE 344-75.

Surveillance requirements to

~l.

periodically demonstrate operability will be implemented in accordance with the in-service testing program.

%N

@OO

'[/

A D

The Energy People mrnn m

5 Dir. of Nucl. React. Reg.

2 9/9/85 Should you have any questions in this regard, please contact us.

Very truly yours, l

/lI f

(

VV, C

D. H. Wagner USNRC Licensing Project Manager A.

R.

Blough USNRC Senior Resident Inspector AA1 1/2