Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137H598 + (04:19:40, 12 December 2024)
- ML20137H596 + (04:19:41, 12 December 2024)
- IR 05000528/1985023 + (04:19:43, 12 December 2024)
- ML20137H594 + (04:19:44, 12 December 2024)
- 05000250/LER-1985-021, :on 850722,two Automatic Initiations of Auxiliary Feedwater Sys Occurred Due to Valve Malfunction. Caused by Quality of Instrument Air Supplied to Valve Actuators.Actuators Inspected & Cleaned + (04:19:45, 12 December 2024)
- ML20137H591 + (04:19:46, 12 December 2024)
- ML20137H590 + (04:19:47, 12 December 2024)
- ML20137H585 + (04:19:49, 12 December 2024)
- ML20137H582 + (04:19:50, 12 December 2024)
- ML20137H581 + (04:19:51, 12 December 2024)
- ML20137H577 + (04:19:52, 12 December 2024)
- ML20137H575 + (04:19:53, 12 December 2024)
- ML20137H571 + (04:19:54, 12 December 2024)
- 05000366/LER-1985-020-01, :on 850726,reactor Water Cleanup Pump Inboard & Outboard Suction Isolation Valves 2G31-F001 & 2G31-F004, Isolated on High Sys Differential Flow.Caused by Filter Demineralizer Not Being Completely Filled + (04:19:59, 12 December 2024)
- ML20137H566 + (04:20:00, 12 December 2024)
- BECO-85-212, Requests Relief from Visual Exam for Leakage of Reactor Coolant Piping Per Generic Ltr 84-11.Requirements Similar to Requirements of Section III.A.3 of 830826 IGSCC Insp Order Confirming Shutdown + (04:20:01, 12 December 2024)
- ML20137H563 + (04:20:02, 12 December 2024)
- ML20137H561 + (04:20:03, 12 December 2024)
- ML20137H557 + (04:20:04, 12 December 2024)
- ML20137H555 + (04:20:05, 12 December 2024)
- ML20137H553 + (04:20:06, 12 December 2024)
- IR 05000333/1985029 + (04:20:08, 12 December 2024)
- ML20137H544 + (04:20:13, 12 December 2024)
- ML20137H537 + (04:20:13, 12 December 2024)
- ML20137H536 + (04:20:14, 12 December 2024)
- ML20137H534 + (04:20:15, 12 December 2024)
- 05000458/LER-1985-056, :on 851211,RHR Isolation Valve Received Isolation Signals Resulting in Two Separate RHR Pump a Trips.Caused by Incorrect Installation of Temporary Alteration on Switches.Alteration Corrected + (04:20:17, 12 December 2024)
- ML20137H532 + (04:20:18, 12 December 2024)
- ML20137H530 + (04:20:18, 12 December 2024)
- ML20137H528 + (04:20:19, 12 December 2024)
- ML20137H527 + (04:20:20, 12 December 2024)
- ML20137H522 + (04:20:21, 12 December 2024)
- ML20137H525 + (04:20:21, 12 December 2024)
- ML20137H519 + (04:20:22, 12 December 2024)
- ML20137H516 + (04:20:23, 12 December 2024)
- ML20137H514 + (04:20:24, 12 December 2024)
- ML20137H513 + (04:20:25, 12 December 2024)
- 05000245/LER-1997-018-01, :on 970224,four MOVs May Not Fully Isolate Downstream Pipe Break.Caused by Lack of Adequate Design Change Process Guidance & Limited Vendor & Industry Documentation Availability.Mov Program Will Be Revised + (04:20:26, 12 December 2024)
- ML20137H508 + (04:20:27, 12 December 2024)
- IR 05000456/1985049 + (04:20:28, 12 December 2024)
- ML20137H504 + (04:20:29, 12 December 2024)
- ML20137H501 + (04:20:29, 12 December 2024)
- 05000267/LER-1985-028, :on 851214,air Flow Through Fuel Storage Facility Did Not Meet Tech Spec Surveillance Requirements. Caused by Air Leaks in Pipe Chase Walls Connected to Reactor Bldg Ventilation Sys.Leaks Repaired + (04:20:31, 12 December 2024)
- ML20137H499 + (04:20:32, 12 December 2024)
- ML20137H494 + (04:20:33, 12 December 2024)
- IR 05000255/1985024 + (04:20:37, 12 December 2024)
- LIC-97-0049, Application for Amend to License DPR-40,incorporating Addl Restrictions on Operation of MSSVs + (04:20:40, 12 December 2024)
- ML20137H487 + (04:20:41, 12 December 2024)
- ML20137H481 + (04:20:42, 12 December 2024)
- ML20137H482 + (04:20:42, 12 December 2024)
- 05000245/LER-1997-018, Forwards LER 97-018-00,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970224.Util Commitments Made within Ltr,Listed + (04:20:43, 12 December 2024)