Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000374/LER-1984-041-02, :on 840728,isolation of Reactor Water Cleanup Occurred.Caused by High Differential Flow on Divs 1 & 2. Isolation Reset When Reactor Pressure & Level Stabilized & Reactor Water Cleanup Returned to Svc + (03:43:03, 12 December 2024)
- ST-HL-AE-1576, Informs of Rescheduling of Unit 1 Fuel Load for June 1987, W/Full Power Operation in Dec 1987.Remaining Const Limited to Completion of Necessary Sys & Areas.List of Items Which Will Not Be Completed at Fuel Load Encl + (03:43:04, 12 December 2024)
- ML20137M879 + (03:43:04, 12 December 2024)
- NSD-NRC-97-5045, Forwards TR WCAP-14846, Scaling Analysis for AP600 Containment Pressure During Design Basis Accidents + (03:43:05, 12 December 2024)
- IR 05000193/1985002 + (03:43:06, 12 December 2024)
- ML20137M872 + (03:43:07, 12 December 2024)
- ML20137M871 + (03:43:07, 12 December 2024)
- ML20137M870 + (03:43:08, 12 December 2024)
- ML20137M867 + (03:43:09, 12 December 2024)
- ML20137M866 + (03:43:10, 12 December 2024)
- IR 05000295/1996002 + (03:43:11, 12 December 2024)
- ML20137M864 + (03:43:13, 12 December 2024)
- ML20137M861 + (03:43:14, 12 December 2024)
- ML20137M863 + (03:43:14, 12 December 2024)
- ML20137M858 + (03:43:15, 12 December 2024)
- ML20137M857 + (03:43:16, 12 December 2024)
- ML20137M856 + (03:43:16, 12 December 2024)
- ML20137M854 + (03:43:17, 12 December 2024)
- ML20137M852 + (03:43:18, 12 December 2024)
- ML20137M851 + (03:43:18, 12 December 2024)
- ML20137M848 + (03:43:19, 12 December 2024)
- ML20137M847 + (03:43:19, 12 December 2024)
- ML20137M845 + (03:43:20, 12 December 2024)
- W3P85-3154, Forwards Reevaluation of Postulated Toxic Chemical Release, Per .Evaluation Confirms No Adverse Impact from Postulated Toxic Chemical Release Based on Infiltration Rate of 0.06 Vol Change Per Hour + (03:43:20, 12 December 2024)
- ML20137M843 + (03:43:21, 12 December 2024)
- ML20137M840 + (03:43:22, 12 December 2024)
- ML20137M836 + (03:43:23, 12 December 2024)
- ML20137M837 + (03:43:23, 12 December 2024)
- IR 05000530/1985020 + (03:43:24, 12 December 2024)
- ML20137M831 + (03:43:25, 12 December 2024)
- ML20137M829 + (03:43:26, 12 December 2024)
- ML20137M828 + (03:43:27, 12 December 2024)
- ML20137M826 + (03:43:27, 12 December 2024)
- ML20137M823 + (03:43:28, 12 December 2024)
- ML20137M821 + (03:43:29, 12 December 2024)
- ML20137M822 + (03:43:29, 12 December 2024)
- ML20137M819 + (03:43:30, 12 December 2024)
- ML20137M818 + (03:43:30, 12 December 2024)
- ML20137M812 + (03:43:31, 12 December 2024)
- ML20137M811 + (03:43:32, 12 December 2024)
- ML20137M810 + (03:43:32, 12 December 2024)
- 3F0186-16, Revises Response to Violations Noted in Insp Rept 50-302/85-34.Corrective Actions:Procedure for Calculation of Max Permissible Concentration Hours Based on Whole Body Count Data Implemented on 851231 + (03:43:33, 12 December 2024)
- ML20137M805 + (03:43:33, 12 December 2024)
- ML20137M803 + (03:43:34, 12 December 2024)
- ML20137M801 + (03:43:35, 12 December 2024)
- NSD-NRC-97-5042, Confirms Completion of Submittal of Final Documentation Re Ssar,Section 6.6,ISI of Class 2 & 3 Components for Application for AP600 Design Certification + (03:43:35, 12 December 2024)
- ML20137M797 + (03:43:36, 12 December 2024)
- BECO-85-164, Notifies of New Location on County Property for Emergency Operations Facility Currently Being Constructed.Facility Const Expected to Be Complete in 1986.Full Operation of Facility Included in Util long-term Program + (03:43:37, 12 December 2024)
- ML20137M791 + (03:43:37, 12 December 2024)
- ML20137M790 + (03:43:38, 12 December 2024)
- ML20137M785 + (03:43:39, 12 December 2024)