Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138J042 + (00:11:07, 12 December 2024)
- ML20138J040 + (00:11:08, 12 December 2024)
- ML20138J037 + (00:11:09, 12 December 2024)
- ML20138J035 + (00:11:09, 12 December 2024)
- ML20138J034 + (00:11:10, 12 December 2024)
- ML20138J033 + (00:11:11, 12 December 2024)
- ML20138J031 + (00:11:12, 12 December 2024)
- ML20138J029 + (00:11:13, 12 December 2024)
- ML20138J030 + (00:11:13, 12 December 2024)
- ML20138J027 + (00:11:35, 12 December 2024)
- ML20138J025 + (00:11:36, 12 December 2024)
- ML20138J024 + (00:11:36, 12 December 2024)
- ML20138J023 + (00:11:37, 12 December 2024)
- B11791, Forwards Administrative Control Procedure ACP 6.15, Post-Trip & Transient Review, Implementing Util Nuclear Engineering & Operations Procedure Neo 8.02 W/Same Title, Per 850910 Request + (00:11:38, 12 December 2024)
- ML20138J021 + (00:11:39, 12 December 2024)
- ML20138J020 + (00:11:39, 12 December 2024)
- ML20138J017 + (00:11:40, 12 December 2024)
- ML20138J015 + (00:11:42, 12 December 2024)
- ML20138J016 + (00:11:42, 12 December 2024)
- ML20138J013 + (00:11:43, 12 December 2024)
- ML20138J014 + (00:11:43, 12 December 2024)
- ML20138J012 + (00:11:44, 12 December 2024)
- ML20138J010 + (00:11:45, 12 December 2024)
- ML20138J008 + (00:11:46, 12 December 2024)
- ML20138J007 + (00:11:47, 12 December 2024)
- ML20138J005 + (00:11:47, 12 December 2024)
- ML20138J003 + (00:11:48, 12 December 2024)
- ML20138J004 + (00:11:48, 12 December 2024)
- ML20138J002 + (00:11:49, 12 December 2024)
- ML20138H999 + (00:11:50, 12 December 2024)
- ML20138J000 + (00:11:50, 12 December 2024)
- ML20138H998 + (00:11:51, 12 December 2024)
- ML20138H997 + (00:11:52, 12 December 2024)
- ML20138H995 + (00:11:54, 12 December 2024)
- ML20138H994 + (00:11:55, 12 December 2024)
- ML20138H990 + (00:11:56, 12 December 2024)
- ML20138H991 + (00:11:56, 12 December 2024)
- ML20138H989 + (00:11:57, 12 December 2024)
- ML20138H988 + (00:11:57, 12 December 2024)
- 05000280/LER-1985-021, :on 851114,unexpected Start of Auxiliary Feed Pump 2-FW-P-3A Occurred.Caused by Open Coil in Bfd Relay AFP-2XA.Relay Replaced & Tested Satisfactorily + (00:11:59, 12 December 2024)
- ML20138H986 + (00:12:00, 12 December 2024)
- 05000237/LER-1985-041-04, :on 851112,unit Scrammed on Greater than 10% Turbine Stop Valve Closure Trip Signal.Caused by Turbine Trip Resulting from Simulated Reactor Vessel High Water Level.Valve Manifold for ECCS Switch Replaced + (00:12:02, 12 December 2024)
- NLS8500256, Responds to NRC Re Violations Noted in Insp Rept 50-298/85-19.Corrective Actions:Cns Procedure 3.8, Drawing Control Procedure, Will Be Revised & Implemented to Control Use of safety-related Drawings + (00:12:03, 12 December 2024)
- ML20138H980 + (00:12:04, 12 December 2024)
- ML20138H979 + (00:12:05, 12 December 2024)
- ML20138H977 + (00:12:06, 12 December 2024)
- ML20138H978 + (00:12:06, 12 December 2024)
- ML20138H974 + (00:12:07, 12 December 2024)
- ML20138H973 + (00:12:08, 12 December 2024)
- ML20138H972 + (00:12:08, 12 December 2024)
- ML20138H971 + (00:12:09, 12 December 2024)
- ML20138H970 + (00:12:10, 12 December 2024)