Confirmatory Action Ltr CAL-RIII-85-14 Re 851023 Telcon Discussing Improper Response of Reactor Protection Sys Which Resulted in Alert & Manual Rod Insertion During 851023 Startup
ML20138J031
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 10/23/1985
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Taylor J
DAIRYLAND POWER COOPERATIVE
References
CAL-RIII-85-14, NUDOCS 8510290224
Download: ML20138J031 (2)


Text

..e l

CONFIRMATORY ACTION LETTER CAL-RIII-85-14 October 23, 1985 Docket No. 50-409 Dairyland Power Cooperative ATTN: Mr. J. W. Taylor General Manager 2615 East Avenue - South La Crosse, WI 54601 Gentlemen:

This letter confirms the telephone conversation between Mr. Dwane Boyd of this office and Mr. John Parkyn of your staff on October 23, 1985, related to an apparent improper response of the reactor protection system which resulted in an alert and manual rod insertion during a startup on October 23, 1985.

It is our understanding that an alert was declared when an operator noted that an annunciator panel had activated during startup, indicating high neutron flux but that automatic protection system actuation did not occur as he believed it should have. He immediately terminated the startup by manually inserting all withdrawn control rods. With regard to the matters discussed, we understand that you will:

1. Conduct a thorough review to determine if a trip signal actually was received by the Reactor Protection System (RPS).
2. If such a signal was received, determine why the control rods failed to automatically insert.
3. If such a trip signal was not received, determine why the annunciator was
activated.
4. Determine what caused the signal that nuclear instrumentation observed and why nuclear instrument channel number 5 was not affected.
5. Maintain all affected equipment related to the Reactor Protection System in such a manner that it can easily be kept or placed in the "as found" condition. Therefore, take no action which would destroy or cause to be lost, (other than necessary to protect the health and safety of the public) any evidence which would be needed to investigate or reconstruct this event.
6. Review operator actions taken imediately following his recognition of the failure to trip and determine if these actions were in accordance -

with your procedure:, and policies (specifically, determine why the control

, rods were manually _ inserted rather than by inserting a manual trip signal.

8510290224 851023 0l gDR ADOCK 0 % 9 yo l

g o CONFIRMATORY ACTION LETTER CAL-RIII-85-14 Dairyland Power Cooperative October 23, 1985

7. A formal report of your findings and conclusions will be submitted to the Region III office within 30 days.
8. We further understand that startup will not occur until authorization to restart is obtained from the Regional Administrator or his designee.

Please let us know ininediately if your understanding differs from that set out above.

Sincerely, Ortstnal claned by damos G. Keppler James G. Keppler Regional Administrator cc: J. Parkyn, Plant Superintendent DCS/RSB(RIDS)

Licensing Fee Management Branch Resident Inspector, RIII John J. Duffy, Chief Boiler Section Ness Flores, Chairperson Wisconsin Public Service Comission Spark Burmaster, Coulee Region Energy Coalition l

RIII g RIII RI RII RIII RII:

RIII sofd/ri ChMssotimos eyes creenman N4thus DaIis re er 10/43/85 10M /85 10/.t3/85 10/$/85 10/1)/85 10/f,785 10/.23/85 l