Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-2013-244, Reactor Vessel Material Surveillance Program - Revised Surveillance Capsule Withdrawal Schedule for X4 + (10:45:25, 11 January 2025)
- 05000324/LER-2013-004, Regarding Operation Prohibited by Technical Specifications - Recirculation Loop Flow Mismatch + (10:45:27, 11 January 2025)
- 05000250/LER-2013-008, Regarding Through-Wall Leak in 3A CCW Pump Threaded Fitting Caused Pump to Be Inoperable Longer than AOT + (10:45:30, 11 January 2025)
- L-2013-237, CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors - 30 Day Special Report + (10:45:31, 11 January 2025)
- 05000423/LER-2013-005, Regarding Loss of Containment Integrity Due to Failed Airlock + (10:45:39, 11 January 2025)
- GO2-13-121, First Six Month Status Update Report for the Implementation of NRC Order EA-12-051 Reliable Spent Fuel Pool Instrumentation + (10:45:40, 11 January 2025)
- BSEP 13-0088, First Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) + (10:45:41, 11 January 2025)
- ML13248A366 + (10:45:42, 11 January 2025)
- ML13248A360 + (10:45:42, 11 January 2025)
- L-MT-13-091, WCAP-17716-NP, Revision 1 - Benchmarking of the Acoustic Circuit Enhanced Revision 2.0 for the Monticello Steam Dryer Replacement Project, Enclosure 14 + (10:45:43, 11 January 2025)
- ML13248A348 + (10:45:44, 11 January 2025)
- ML13248A346 + (10:45:45, 11 January 2025)
- ML13248A344 + (10:45:46, 11 January 2025)
- ML13248A345 + (10:45:46, 11 January 2025)
- ML13248A343 + (10:45:47, 11 January 2025)
- ML13248A341 + (10:45:48, 11 January 2025)
- IR 05000293/2013006 + (10:45:49, 11 January 2025)
- L-2013-248, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation(Order Number EA- 12-051) + (10:45:50, 11 January 2025)
- L-2013-256, Florida Power & Light Cos, Turkey Point Units 3 & 4, Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Flooding Aspects of Recommendation 2.1 of Near-Term Task Force Review of Insights from Fukushima Dai- + (10:45:50, 11 January 2025)
- L-2013-249, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA- 12-049) + (10:45:53, 11 January 2025)
- TSTF-13-12, Comment (1) by Robert Slough, Otto Gustafson, Richard Loeffler and Wendy Croft on Proposed Safety Evaluation for Plant-Specific Technical Specifications Task Force Traveler TSTF-523 (Generic Letter 2008-01) + (10:45:54, 11 January 2025)
- ML13248A267 + (10:45:56, 11 January 2025)
- ML13248A271 + (10:45:56, 11 January 2025)
- ML13248A250 + (10:45:58, 11 January 2025)
- L-PI-13-086, Revised Heat Transfer Multiplier Distributions - Error Identified in ECCS Evaluation Model, 10 CFR 50.46 + (10:45:59, 11 January 2025)
- GNRO-2013/00063, Notification of Spent Fuel Cask Use + (10:46:00, 11 January 2025)
- ML13248A115 + (10:46:01, 11 January 2025)
- RA-13-019, Transmittal of Emergency Plan Implementing Procedures, EMG-NGGC-0002, Revisions 5 and 6, EMG-NGGC-0004, Revisions 3 and 4 and EMG-NGGC-0005, Revisions 3 and 4 + (10:46:01, 11 January 2025)
- ML13248A114 + (10:46:02, 11 January 2025)
- ML13248A111 + (10:46:03, 11 January 2025)
- 05000382/LER-2013-004, Regarding Tech Spec Violation During Operation in Lower Mode with Reduced Channels of Excore Nuclear Instrumentation + (10:46:05, 11 January 2025)
- ML13248A108 + (10:46:06, 11 January 2025)
- ML13248A107 + (10:46:07, 11 January 2025)
- ML13248A106 + (10:46:08, 11 January 2025)
- ML13248A096 + (10:46:09, 11 January 2025)
- ML13248A050 + (10:46:11, 11 January 2025)
- IR 05000440/2013403 + (10:46:15, 11 January 2025)
- ML13248A035 + (10:46:15, 11 January 2025)
- ML13248A030 + (10:46:17, 11 January 2025)
- ML13248A025 + (10:46:18, 11 January 2025)
- Press Release-II-13-057, NRC Assigns New Senior Resident Inspector to Robinson Nuclear Power Plant + (10:46:19, 11 January 2025)
- ML13248A021 + (10:46:20, 11 January 2025)
- ML13248A020 + (10:46:21, 11 January 2025)
- ML13248A017 + (10:46:22, 11 January 2025)
- ML13248A010 + (10:46:23, 11 January 2025)
- ML13247A786 + (10:46:24, 11 January 2025)
- ML13247A787 + (10:46:24, 11 January 2025)
- ML13247A769 + (10:46:26, 11 January 2025)
- ML13247A777 + (10:46:26, 11 January 2025)
- ML13247A756 + (10:46:27, 11 January 2025)
- ML13247A755 + (10:46:28, 11 January 2025)