Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML13249A029 + (10:45:04, 11 January 2025)
- RNP-RA/13-0089, Supplemental Submittal to Correct TS Pages Re Request for Revision to Steam Generator Program Inspection Frequencies & Tube Sample Selection & Application of Permanent Alternate Repair Criteria + (10:45:05, 11 January 2025)
- ML13249A027 + (10:45:06, 11 January 2025)
- ML13249A011 + (10:45:06, 11 January 2025)
- OI 4-2012-010, Closure of Investigation (OI 4-2012-010) + (10:45:07, 11 January 2025)
- ML13249A000 + (10:45:09, 11 January 2025)
- ML13248A628 + (10:45:10, 11 January 2025)
- ML13248A640 + (10:45:10, 11 January 2025)
- ML13248A611 + (10:45:11, 11 January 2025)
- ML13248A603 + (10:45:12, 11 January 2025)
- ML13248A600 + (10:45:12, 11 January 2025)
- ML13248A598 + (10:45:13, 11 January 2025)
- ML13248A596 + (10:45:14, 11 January 2025)
- Press Release-13-072, NRC Schedules 12 Meetings Nationwide on Waste Confidence Proposed Rule and Environmental Study + (10:45:14, 11 January 2025)
- ML13248A594 + (10:45:16, 11 January 2025)
- ML13248A593 + (10:45:17, 11 January 2025)
- ML13248A532 + (10:45:18, 11 January 2025)
- RS-13-227, Response to NRC HELB Audit Request for Information Supporting Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate + (10:45:19, 11 January 2025)
- JAFP-13-0036, Application for Preemption Authority Pursuant to Section 161A of the Atomic Energy Act and License Amendment Request + (10:45:20, 11 January 2025)
- ML13248A516 + (10:45:21, 11 January 2025)
- ML13248A495 + (10:45:22, 11 January 2025)
- ML13248A496 + (10:45:22, 11 January 2025)
- ML13248A492 + (10:45:23, 11 January 2025)
- ML13248A457 + (10:45:24, 11 January 2025)
- ML13248A456 + (10:45:24, 11 January 2025)
- L-2013-244, Reactor Vessel Material Surveillance Program - Revised Surveillance Capsule Withdrawal Schedule for X4 + (10:45:25, 11 January 2025)
- 05000324/LER-2013-004, Regarding Operation Prohibited by Technical Specifications - Recirculation Loop Flow Mismatch + (10:45:27, 11 January 2025)
- 05000250/LER-2013-008, Regarding Through-Wall Leak in 3A CCW Pump Threaded Fitting Caused Pump to Be Inoperable Longer than AOT + (10:45:30, 11 January 2025)
- L-2013-237, CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors - 30 Day Special Report + (10:45:31, 11 January 2025)
- 05000423/LER-2013-005, Regarding Loss of Containment Integrity Due to Failed Airlock + (10:45:39, 11 January 2025)
- GO2-13-121, First Six Month Status Update Report for the Implementation of NRC Order EA-12-051 Reliable Spent Fuel Pool Instrumentation + (10:45:40, 11 January 2025)
- BSEP 13-0088, First Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) + (10:45:41, 11 January 2025)
- ML13248A366 + (10:45:42, 11 January 2025)
- ML13248A360 + (10:45:42, 11 January 2025)
- L-MT-13-091, WCAP-17716-NP, Revision 1 - Benchmarking of the Acoustic Circuit Enhanced Revision 2.0 for the Monticello Steam Dryer Replacement Project, Enclosure 14 + (10:45:43, 11 January 2025)
- ML13248A348 + (10:45:44, 11 January 2025)
- ML13248A346 + (10:45:45, 11 January 2025)
- ML13248A344 + (10:45:46, 11 January 2025)
- ML13248A345 + (10:45:46, 11 January 2025)
- ML13248A343 + (10:45:47, 11 January 2025)
- ML13248A341 + (10:45:48, 11 January 2025)
- IR 05000293/2013006 + (10:45:49, 11 January 2025)
- L-2013-248, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation(Order Number EA- 12-051) + (10:45:50, 11 January 2025)
- L-2013-256, Florida Power & Light Cos, Turkey Point Units 3 & 4, Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Flooding Aspects of Recommendation 2.1 of Near-Term Task Force Review of Insights from Fukushima Dai- + (10:45:50, 11 January 2025)
- L-2013-249, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA- 12-049) + (10:45:53, 11 January 2025)
- TSTF-13-12, Comment (1) by Robert Slough, Otto Gustafson, Richard Loeffler and Wendy Croft on Proposed Safety Evaluation for Plant-Specific Technical Specifications Task Force Traveler TSTF-523 (Generic Letter 2008-01) + (10:45:54, 11 January 2025)
- ML13248A267 + (10:45:56, 11 January 2025)
- ML13248A271 + (10:45:56, 11 January 2025)
- ML13248A250 + (10:45:58, 11 January 2025)
- L-PI-13-086, Revised Heat Transfer Multiplier Distributions - Error Identified in ECCS Evaluation Model, 10 CFR 50.46 + (10:45:59, 11 January 2025)
- GNRO-2013/00063, Notification of Spent Fuel Cask Use + (10:46:00, 11 January 2025)