Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML13345A259 + (05:21:13, 11 January 2025)
- ML13345A250 + (05:21:13, 11 January 2025)
- ML13345A236 + (05:21:14, 11 January 2025)
- ML13345A219 + (05:21:15, 11 January 2025)
- ML13345A222 + (05:21:15, 11 January 2025)
- ML13345A205 + (05:21:16, 11 January 2025)
- ML13345A190 + (05:21:17, 11 January 2025)
- ML13345A157 + (05:21:18, 11 January 2025)
- ML13345A182 + (05:21:18, 11 January 2025)
- 05000354/LER-2013-004, Regarding Operations with a Potential to Drain the Reactor Vessel (OPDRV) Without Secondary Containment + (05:21:21, 11 January 2025)
- 05000483/LER-2013-009, Regarding Appendix R Unanalyzed Condition - Direct Current Ammeter Circuits Without Overcurrent Protection + (05:21:23, 11 January 2025)
- Press Release-13-102, NRC Approves Power Uprate for Monticello Nuclear Power Plant in Minnesota + (05:21:24, 11 January 2025)
- IR 05000373/2013407 + (05:21:25, 11 January 2025)
- ML13345A038 + (05:21:25, 11 January 2025)
- CY-13-051, Independent Spent Fuel Storage Installation, Biennial Update of Quality Assurance Program + (05:21:26, 11 January 2025)
- CY-13-047, Of the Haddam Neck Plant Post-Shutdown Decommissioning Activities Report + (05:21:27, 11 January 2025)
- OI 4-2012-025, Closure of Investigation (OI 4-2012-025) + (05:21:30, 11 January 2025)
- IR 05000397/2013405 + (05:21:31, 11 January 2025)
- ML13344B204 + (05:21:32, 11 January 2025)
- ML13344B148 + (05:21:35, 11 January 2025)
- ML13344B147 + (05:21:36, 11 January 2025)
- ML13344B146 + (05:21:37, 11 January 2025)
- ML13344B144 + (05:21:37, 11 January 2025)
- ML13344B140 + (05:21:38, 11 January 2025)
- ML13344B143 + (05:21:38, 11 January 2025)
- CNL-13-134, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A + (05:21:40, 11 January 2025)
- IR 05000220/2013010 + (05:21:46, 11 January 2025)
- L-13-360, Pressure and Temperature Limits Report Revision + (05:21:46, 11 January 2025)
- ML13344A982 + (05:21:47, 11 January 2025)
- ML13343A605 + (05:21:48, 11 January 2025)
- GNRO-2013/00093, 2013 Report of Changes and Errors to 10CFR50.46 + (05:21:48, 11 January 2025)
- ML13343A594 + (05:21:49, 11 January 2025)
- ML13343A309 + (05:21:50, 11 January 2025)
- ML13343A299 + (05:21:51, 11 January 2025)
- ML13343A304 + (05:21:51, 11 January 2025)
- ML13343A291 + (05:21:52, 11 January 2025)
- ML13343A280 + (05:21:53, 11 January 2025)
- ML13343A285 + (05:21:53, 11 January 2025)
- ML13343A275 + (05:21:54, 11 January 2025)
- PNO-IV-13-004, Arkansas Nuclear One, Unit 2, Notification of Unusual Event + (05:21:58, 11 January 2025)
- ML13343A213 + (05:21:58, 11 January 2025)
- 05000285/LER-2012-017-02, Regarding Containment Valve Actuators Design Temperature Ratings Below Those Required for Design Basis Accidents + (05:22:00, 11 January 2025)
- ML13343A184 + (05:22:01, 11 January 2025)
- ML13343A185 + (05:22:01, 11 January 2025)
- ML13343A178 + (05:22:02, 11 January 2025)
- ENOC-13-00028, Vermont, Notice of Change in Corporate Form of Energy Nuclear Holding Company + (05:22:03, 11 January 2025)
- Press Release-IV-13-037, NRC Monitoring Event at Arkansas Nuclear One + (05:22:04, 11 January 2025)
- 05000259/LER-2013-006, Regarding 1B Standby Liquid Control Pump Inoperable for Longer than Allowed by the Technical Specifications + (05:22:08, 11 January 2025)
- NL-13-146, Supplemental Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Hazard Walkdowns Conducted to Verify Current Plant Compliance with the Current Licensing Basis (CLB) for Seismic Requirements + (05:22:09, 11 January 2025)
- RC-13-0180, (Vcsns), Date Correction to License Amendment Request LAR 12-06014 Changes to Snubber Surveillance Requirements + (05:22:09, 11 January 2025)
- ML13343A143 + (05:22:10, 11 January 2025)
- NL-13-148, Report on Inoperable Main Steam Line Radiation Monitor + (05:22:10, 11 January 2025)