Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000395/1985042 + (23:37:55, 11 December 2024)
- ML20138N319 + (23:37:56, 11 December 2024)
- ML20138N321 + (23:37:56, 11 December 2024)
- ML20138N318 + (23:37:57, 11 December 2024)
- ML20138N317 + (23:37:57, 11 December 2024)
- ML20138N313 + (23:37:58, 11 December 2024)
- A05255, Forwards Comments on Draft Rept Re Probabilistic Safety Study & Util Risk Based Evaluations of Integrated Safety Assessment Program Topics,Per NRC 850923 Request + (23:37:59, 11 December 2024)
- ML20138N305 + (23:38:00, 11 December 2024)
- ML20138N308 + (23:38:00, 11 December 2024)
- ML20138N304 + (23:38:01, 11 December 2024)
- ML20138N303 + (23:38:01, 11 December 2024)
- ML20138N299 + (23:38:02, 11 December 2024)
- ML20138N294 + (23:38:03, 11 December 2024)
- ML20138N288 + (23:38:05, 11 December 2024)
- ML20138N289 + (23:38:05, 11 December 2024)
- ML20138N282 + (23:38:06, 11 December 2024)
- ML20138N279 + (23:38:07, 11 December 2024)
- ML20138N281 + (23:38:07, 11 December 2024)
- PNO-III-85-093, on 851029,reactor Tripped on Spurious Low Flow Signal in Primary Sys.Unit Will Remain Shut Down Until Licensee Investigation Completed & NRC Concurs W/Findings. Special Insp Team Dispatched.State of Mi Will Be Notified + (23:38:08, 11 December 2024)
- ML20138N274 + (23:38:09, 11 December 2024)
- ML20138N272 + (23:38:10, 11 December 2024)
- ML20138N270 + (23:38:10, 11 December 2024)
- ST-HL-AE-1442, Forwards Response to Draft SER & FSAR Item Re Review of Anticipated Operational Occurrence & Postulated Accident Analyses for All Modes.Bounding Analysis Will Be Completed. Marked-up FSAR Pages Will Be Incorporated in FSAR Amend + (23:38:11, 11 December 2024)
- IR 05000062/1985002 + (23:38:12, 11 December 2024)
- ML20138N258 + (23:38:13, 11 December 2024)
- ML20138N253 + (23:38:16, 11 December 2024)
- W3P85-3130, Notifies of Successful Completion of Qualification of Borg-Wagner Actuators Per 10CFR50.49.Design Changes Implemented to Resolve Anomalies Resulting from Prior Testing + (23:38:17, 11 December 2024)
- ML20138N249 + (23:38:18, 11 December 2024)
- ML20138N240 + (23:38:19, 11 December 2024)
- ML20138N243 + (23:38:19, 11 December 2024)
- FVY-85-101, Informs That Util Emergency Operations Facility Fully Functional by 850916 & 840612 Confirmatory Order Item 5.C Requirement Met in Advance of Required Date + (23:38:20, 11 December 2024)
- ML20138N237 + (23:38:20, 11 December 2024)
- ML20138N234 + (23:38:24, 11 December 2024)
- ML20138N232 + (23:38:25, 11 December 2024)
- RBG-22-501, Informs That Effect of Increasing Standby Gas Treatment Sys Fan Start Time from 30 to 40 Evaluated.Offsite Accident Dose,Control Room Habitability & Technical Support Ctr Habitability Potentially Affected + (23:38:25, 11 December 2024)
- ML20138N229 + (23:38:26, 11 December 2024)
- ML20138N225 + (23:38:27, 11 December 2024)
- ST-HL-AE-1481, Responds to Draft SER Confirmatory Items 3.5-1 Re Turbine Maint Program & 3.5-2 Re Volumetric Insp of Turbine at Second Refueling Outage.Util Will Submit Turbine Maint Program within 3 Yrs of Obtaining OL + (23:38:27, 11 December 2024)
- B11834, Forwards Response to Request for Suppl to Justification for Continued Operation Re 20 RCS Loop Resistance Temp Detectors & 14 Valve Motor Operators Not Fully Environmentally Qualified + (23:38:28, 11 December 2024)
- ML20138N224 + (23:38:28, 11 December 2024)
- ML20138N219 + (23:38:29, 11 December 2024)
- ML20138N217 + (23:38:30, 11 December 2024)
- ML20138N215 + (23:38:30, 11 December 2024)
- B11840, Forwards Response to NRC 851022 Request for Suppl to Justification for Continued Operation of 11 Valve Motor Operators Not Yet Fully Environmentally Qualified + (23:38:31, 11 December 2024)
- ML20138N213 + (23:38:32, 11 December 2024)
- ML20138N209 + (23:38:32, 11 December 2024)
- ML20138N206 + (23:38:33, 11 December 2024)
- ML20138N208 + (23:38:33, 11 December 2024)
- B11832, Forwards Response to Informal NRC Question Raised During 850925 Telcon Re Steam Generator Tube Rupture Issue Related to three-loop Operation + (23:38:34, 11 December 2024)
- ML20138N203 + (23:38:35, 11 December 2024)
- ML20138N202 + (23:38:35, 11 December 2024)