Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20141E458 + (20:26:31, 11 December 2024)
- ML20141E457 + (20:26:32, 11 December 2024)
- NUREG-1534, Forwards Chapter 17 Part 1 & 2 of NUREG-1537 Re Decommissioning & Possession Only License Amends.Format That Should Be Followed for Decommissioning Plan Given in App 17.1,which Lays Out step-by-step Info Required.W/O Encl + (20:26:32, 11 December 2024)
- ML20141E453 + (20:26:33, 11 December 2024)
- ML20141E452 + (20:26:34, 11 December 2024)
- 05000373/LER-1997-016, :on 970414,rod Block Monitor Were Not Adequately Functionally Tested as Required by Ts.Caused by Inadequate Procedures.Affected Procedures Will Be Revised & Performed Prior to Plant Restart + (20:26:35, 11 December 2024)
- ML20141E449 + (20:26:36, 11 December 2024)
- IR 05000416/1997011 + (20:26:37, 11 December 2024)
- ML20141E448 + (20:26:37, 11 December 2024)
- ML20141E446 + (20:26:38, 11 December 2024)
- ML20141E445 + (20:26:39, 11 December 2024)
- IR 05000245/1996008 + (20:26:40, 11 December 2024)
- ML20141E441 + (20:26:41, 11 December 2024)
- NSD-NRC-97-5090, Forwards Responses to NRC Staff Questions on Operation of AP600 Passive Core Cooling Sys.Open Items Included Are Listed W/W Status in Open Item Tracking Sys + (20:26:41, 11 December 2024)
- 05000323/LER-1985-017-01, :on 851128,reactor Trip Occurred Due to Steam Flow/Feed Flow Mismatch.Caused by Leak in Condensing Pot of Steam Generator Water Level Transmitter Ref Leg.Exhaustive Testing of Reactor Trip Breaker B Performed + (20:26:43, 11 December 2024)
- ML20141E436 + (20:26:44, 11 December 2024)
- ML20141E435 + (20:26:45, 11 December 2024)
- ML20141E433 + (20:26:46, 11 December 2024)
- ML20141E432 + (20:26:47, 11 December 2024)
- ML20141E431 + (20:26:47, 11 December 2024)
- ML20141E430 + (20:26:48, 11 December 2024)
- ML20141E429 + (20:26:48, 11 December 2024)
- ML20141E426 + (20:26:49, 11 December 2024)
- ML20141E424 + (20:26:50, 11 December 2024)
- ML20141E425 + (20:26:50, 11 December 2024)
- 05000250/LER-1985-040, :on 851130,subcritical Trip Occurred.Caused by Removal of Reinsertion of N-32 Instrument Power Fuses W/O Placing Channel Level Trip Switch in Bypass Position. Operator Advised on Plant Procedures + (20:26:52, 11 December 2024)
- ML20141E421 + (20:26:55, 11 December 2024)
- ML20141E419 + (20:26:57, 11 December 2024)
- ML20141E418 + (20:26:58, 11 December 2024)
- ML20141E417 + (20:26:58, 11 December 2024)
- ML20141E415 + (20:26:59, 11 December 2024)
- ML20141E413 + (20:26:59, 11 December 2024)
- ML20141E411 + (20:27:00, 11 December 2024)
- ML20141E406 + (20:27:02, 11 December 2024)
- ML20141E404 + (20:27:02, 11 December 2024)
- 05000277/LER-1985-025-02, :on 851129,main Turbine Stop Valve Closure Scram & Low Level Group II & III Isolations Occurred.Caused by Misunderstanding of Control Room Alarm & Lack of Adequate Precautions During Troubleshooting + (20:27:04, 11 December 2024)
- ML20141E401 + (20:27:05, 11 December 2024)
- ML20141E400 + (20:27:06, 11 December 2024)
- ML20141E393 + (20:27:07, 11 December 2024)
- ML20141E397 + (20:27:07, 11 December 2024)
- ML20141E392 + (20:27:08, 11 December 2024)
- ML20141E390 + (20:27:09, 11 December 2024)
- ML20141E387 + (20:27:10, 11 December 2024)
- ML20141E385 + (20:27:10, 11 December 2024)
- ML20141E384 + (20:27:11, 11 December 2024)
- ML20141E375 + (20:27:12, 11 December 2024)
- ML20141E374 + (20:27:12, 11 December 2024)
- ML20141E373 + (20:27:13, 11 December 2024)
- 05000251/LER-1986-006-02, :on 860315,containment & Control Room Ventilation Sys Isolated Due to Opening of Breaker 4P08-20 Causing Loss of Process Radiation Monitor Rack.No Cause Identified.Procedure Will Be Revised + (20:27:17, 11 December 2024)
- ML20141E367 + (20:27:18, 11 December 2024)
- 05000295/LER-1997-009-01, :on 970114,1FCV-CS0002 Was Inoperable Between 970115 & 0208.Caused by Failure to Verify That Acceptance Criteria for Return to Service Was Met.Disciplined Unit Supervisor & Will Cover Event in Licensed Operator Training + (20:27:20, 11 December 2024)