r Sar gent'& Lundy"*
.?:;
Don K. Schopfer vice Pretoent 312-269 6078 May 16,1997 Project No. 9583-100 t
Docket No. 50-423 i
Noitheast Nuclear Energy Company Millstone Nuclear Power Station, Unit 3 fadW Corrective Action Verification Program c
United States Nuclear Rauiauy Commission
.l Attention: Document Control Desk o
Washington, D.C. 20555
[
Gentlemen:
Telephone conference calls were held between the NRC staff and Sargent & Lundy's Millstone ICAVP Project Team on May 8 and May 14,1997 to discuss details of the Audit Plan and r associated Project Instructions for Unit 3. As a result of those discussions the following i
documents are enclosed with all comments incorporated:
[
Audit Plan, Rev. 2 -
PI-MP3-02, Rev. 2 PI-MP3-04, Rev. 2
/
PI-MP3-11, Rev. 2 fi 1
CK-MP3-02-01, Rev.1 CK-MP3-02-02, Rev.1
' CK-MP3-03-21, Rw. O.
l CK-MP3-03-02, Rev. 2 I have also enclosed Page 10 of PI-MP3-05 which was inadvertently omitted from our submittal l
i of April 28,1997.
79 l
p
~
zouuw
.EERMERllg 4 4 D
A 6
e
~. -
55 Dst Monroe Street a Ch<ago. IL 60603 5780 USA + 312-269-2000 C.
l United States Nuclear Regulatory Commission May 16,1997
' Attention: Document Control Desk Project No. 9583-100 Washington, D.C. 20555 Page 2 As a result of the NRC interviews of the S&L Project Team members, certain additional
- information is being provided. I am enclosing resumes for Robert Hameetman, James Dombrowski (replacement for G. Boghosian), Warren Pinner (replacement for J. P. O'Brien),
' Jack Wakeland (replacement for Louis Paller), and Fernando Gallegos (replacement for Richard Curtis). I am enclosing NRC Conflict ofInterest Statements for the following:
V. E. Balodis (New)
J. E. Dombrowksi(New) i F. Galleges (New)
W. E. Pinner (ikv)
R. P. Sheppard (Revised)
R. J. Ungeran (New w/ Supplement)
I have also enclosed a supplement to the Conflict ofInteren Statement for Ajay Prakash related
. to his divestiture of Stone and Webster Stock.
t' Exhibit 5 of the Audit Plan has been updated to reflect these submittals and the interviews that took place last week. I will contact Mr. Imbro to arrange for the remaining interviews next week.
Please direct any questions to me at (312) 269-6078.
i Yours very tmly, 1%Z Don K. Schopfer Vice President and ICAVP Manager DKS:spr Enclosure Copies:
E. Imbro (1/4) NRC Deputy Director, ICAVP Oversight T. Concannon (1/2) NEAC R. Laudenat (1/3) NU B. A. Erler (1/0) u h