Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20151W584 + (09:06:46, 11 December 2024)
- ML20151W580 + (09:06:49, 11 December 2024)
- ML20151W578 + (09:06:50, 11 December 2024)
- ML20151W579 + (09:06:50, 11 December 2024)
- ML20151W577 + (09:06:51, 11 December 2024)
- U-603017, Forwards Rev 25 of Physical Security Plan, IAW 10CFR50.54(p).Rev Does Not Reduce Effectiveness of Plan. Rev Withheld + (09:06:52, 11 December 2024)
- ML20151W572 + (09:06:53, 11 December 2024)
- ML20151W573 + (09:06:53, 11 December 2024)
- ML20151W571 + (09:06:54, 11 December 2024)
- ML20151W570 + (09:06:54, 11 December 2024)
- ML20151W568 + (09:06:55, 11 December 2024)
- ML20151W567 + (09:06:56, 11 December 2024)
- ML20151W563 + (09:06:56, 11 December 2024)
- ML20151W562 + (09:06:57, 11 December 2024)
- ML20151W558 + (09:06:58, 11 December 2024)
- ML20151W561 + (09:06:58, 11 December 2024)
- 05000341/LER-1988-025, :on 880719,breaker Tripped & Reactor Protection Sys Trip Sys B de-energized.Caused by Personnel Mishap.Event Will Be Included in Maint News Ltr & in Instrumentation & Controls Training Program + (09:07:01, 11 December 2024)
- ML20151W555 + (09:07:02, 11 December 2024)
- ML20151W554 + (09:07:02, 11 December 2024)
- ML20151W553 + (09:07:03, 11 December 2024)
- ML20151W551 + (09:07:04, 11 December 2024)
- ML20151W549 + (09:07:08, 11 December 2024)
- ML20151W548 + (09:07:08, 11 December 2024)
- ML20151W547 + (09:07:09, 11 December 2024)
- ML20151W545 + (09:07:09, 11 December 2024)
- ML20151W543 + (09:07:10, 11 December 2024)
- B12987, Proposed Tech Specs,Adding Alternate Means of Analyzing Containment Integrated Leakage Rate Test Results + (09:07:11, 11 December 2024)
- ML20151W539 + (09:07:12, 11 December 2024)
- VPN-041-98, Forwards Rev 22 to PGE-8010, Poge Nuclear QA Program for Trojan Nuclear Plant. Rev Reflects Administrative Changes That Continue to Meet Requirements of 10CFR50,App B + (09:07:12, 11 December 2024)
- ML20151W537 + (09:07:14, 11 December 2024)
- PY-CEI-NRR-0845, Responds to NRC Re Violations Noted in Insp Rept 50-440/87-25.Corrective Actions:Preventive Maint Deferral Evaluation/Justification Sheet Will Be Formally Incorporated Into Procedures IAP-0501 & PAP-0906 by 880630 + (09:07:18, 11 December 2024)
- CY-98-150, NPDES Noncompliance Notification Addendum:On 980202,0413 & 0611,sixty Day Oil Spill Repts Re Sheens Observed at Water Intake Structure.Caused by Petroleum Products Trapped in River Sediments.Will Continue to Use Sorbent Booms + (09:07:19, 11 December 2024)
- PNO-IV-88-032, on 880423,control Element Assembly (CEA) Inadvertently Withdrawn W/Upper Guide Structure During Refueling Outage.Cause Still Under Investigation.Replacement of CEA Gripper & Extension Under Consideration + (09:07:20, 11 December 2024)
- ML20151W529 + (09:07:21, 11 December 2024)
- 05000333/LER-1998-010, :on 980813,primary Containment Electrical Penetration Was Noted Inoperable Under Postulated Conditions.Caused by Inadequate Plant Design.Added Second Primary Overcurrent Protective Device.With + (09:07:24, 11 December 2024)
- ML20151W526 + (09:07:25, 11 December 2024)
- ML20151W522 + (09:07:26, 11 December 2024)
- ML20151W525 + (09:07:26, 11 December 2024)
- ML20151W519 + (09:07:27, 11 December 2024)
- B12879, Proposed Rev to Tech Specs Re Primary Sys Boundary Monitoring Locations + (09:07:28, 11 December 2024)
- ML20151W518 + (09:07:28, 11 December 2024)
- 05000333/LER-1998-009, :on 980807,error in Exclusion Region of Power Flow Map Was Noted.Caused by Lack of Explicit Procedure on How to Perform Analysis.Revised Vendor Procedure That Is Used to Produce Option 1-D Exclusion Region.With + (09:07:31, 11 December 2024)
- ML20151W514 + (09:07:32, 11 December 2024)
- ML20151W511 + (09:07:34, 11 December 2024)
- ML20151W509 + (09:07:35, 11 December 2024)
- ML20151W507 + (09:07:35, 11 December 2024)
- ML20151W506 + (09:07:36, 11 December 2024)
- ML20151W503 + (09:07:37, 11 December 2024)
- ML20151W505 + (09:07:37, 11 December 2024)
- ML20151W502 + (09:07:38, 11 December 2024)
- 05000382/LER-1986-001, :on 860107,reactor Trip Occurred on Dropped Control Element Assembly (Cea).Caused by Faulty Automatic CEA Calculator Timing Module.Card Replaced on 860123 & Sent to C-E for Evaluation + (09:07:40, 11 December 2024)