Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20153E022 + (07:49:34, 11 December 2024)
- PNO-V-88-030, on 880504,reactor Tripped & Leak Discoverd on Letdown Cooler a Relief Valve.Util Conducting post-trip Review to Determine Cause of Trip & Confirm Source of Leak + (07:49:35, 11 December 2024)
- L-88-206, Forwards Response to Violations Noted in Insp Repts 50-335/88-02 & 50-389/88-02.Encl Withheld (Ref 10CFR2.790 & 73.21) + (07:49:36, 11 December 2024)
- ML20153E017 + (07:49:36, 11 December 2024)
- ML20153E013 + (07:49:37, 11 December 2024)
- ML20153E009 + (07:49:38, 11 December 2024)
- ML20153E010 + (07:49:38, 11 December 2024)
- ML20153E004 + (07:49:39, 11 December 2024)
- ML20153E003 + (07:49:40, 11 December 2024)
- ML20153D999 + (07:49:41, 11 December 2024)
- TXX-4698, Informs That Water Treatment for Nonradwaste Sys Modified, Subsequent to Sept 1981 Fes.Revised Listing of Amounts & Types of Nonradioactive Chemicals Used During Operation Encl + (07:49:41, 11 December 2024)
- IR 05000354/1988008 + (07:49:43, 11 December 2024)
- ML20153D990 + (07:49:44, 11 December 2024)
- ML20153D992 + (07:49:44, 11 December 2024)
- ML20153D984 + (07:49:45, 11 December 2024)
- ML20153D983 + (07:49:46, 11 December 2024)
- ML20153D981 + (07:49:47, 11 December 2024)
- ML20153D982 + (07:49:47, 11 December 2024)
- ML20153D977 + (07:49:48, 11 December 2024)
- ML20153D975 + (07:49:49, 11 December 2024)
- ML20153D974 + (07:49:49, 11 December 2024)
- IR 05000298/1998020 + (07:49:50, 11 December 2024)
- ST-HL-AE-1608, Forwards marked-up FSAR Pages Providing Details on Final Design of Diesel Generator Exhaust.Approx 3 Inches of Pipe Will Extend Beyond Edge of Bldg.Exhaust Hood Designed to Break Away on Impact Will Be Installed Above Exhaust Piping + (07:49:51, 11 December 2024)
- BVY-98-139, Informs That Post Accident Stack Ng Effluent Monitoring channel,R-17-155,is Scheduled to Be Replaced Starting 981001.Estimated That Instrument Channel Will Be Out of Svc for Approx 30 Days + (07:49:52, 11 December 2024)
- ML20153D968 + (07:49:52, 11 December 2024)
- ML20153D966 + (07:49:53, 11 December 2024)
- ML20153D960 + (07:49:54, 11 December 2024)
- ML20153D963 + (07:49:54, 11 December 2024)
- ML20153D958 + (07:49:55, 11 December 2024)
- ML20153D954 + (07:49:56, 11 December 2024)
- PNO-I-86-013A, on 860207,wrong Patient Received Prescribed Dose of 150 Rads After Kidney Transplant.Caused When Clerk Entered Order for Wrong Kidney Patient.Proper Patient Treated.Required Notifications Made + (07:49:57, 11 December 2024)
- ML20153D952 + (07:49:57, 11 December 2024)
- U-600440, Responds to 851106 Request for Info Re Preliminary Analysis of Plant Hydrogen Control Sys.Equipment Survivability Demonstrated by Conducting Analysis of Igniter Assembly.Addl Analysis Unwarranted + (07:50:01, 11 December 2024)
- ML20153D944 + (07:50:02, 11 December 2024)
- ML20153D942 + (07:50:03, 11 December 2024)
- ML20153D936 + (07:50:04, 11 December 2024)
- ML20153D939 + (07:50:04, 11 December 2024)
- ML20153D932 + (07:50:05, 11 December 2024)
- BVY-98-145, Informs That Date for Triennial Audit of Duke Engineering Svcs Established for End of Oct 1998 + (07:50:06, 11 December 2024)
- U-600413, Forwards Planned Actions to Resolve Open Items in Insp Rept 50-461/85-39 Re Emergency Preparedness Implementation Appraisal.Results of Consideration of Each Improvement Item Also Encl + (07:50:07, 11 December 2024)
- ML20153D919 + (07:50:08, 11 December 2024)
- ML20153D921 + (07:50:08, 11 December 2024)
- ML20153D916 + (07:50:09, 11 December 2024)
- W3P86-0033, Application for Amend to License NPF-38,revising Tech Specs to Extend Containment Leakage Type B & C Testing to First Refueling Outage & to Clarify Allowable Surveillance Interval for Diesel Generator Insp.Fee Paid + (07:50:10, 11 December 2024)
- ML20153D912 + (07:50:11, 11 December 2024)
- ML20153D910 + (07:50:12, 11 December 2024)
- ML20153D909 + (07:50:12, 11 December 2024)
- ML20153D908 + (07:50:13, 11 December 2024)
- ML20153D907 + (07:50:14, 11 December 2024)
- LD-86-015, Informs of Incorporation of 850311 Responses,Committing to Perform post-test Analysis of Semiscale Test S-UT-8 & Providing Results of post-test Analysis,To Close TMI Items II.K.3.30 & II.K.3.31 + (07:50:16, 11 December 2024)
- ML20153D903 + (07:50:17, 11 December 2024)