Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20153F760 + (07:29:25, 11 December 2024)
- IR 05000382/1982014 + (07:29:26, 11 December 2024)
- SNRC-1497, Lists Actions Taken in Response to NRC Bulletin 88-007, Power Oscillations in Bwrs. Personnel in Ofc of Training Informed of Need to Incorporate Procedure Changes Into Reactor Operator & Shift Technical Advisor Training + (07:29:26, 11 December 2024)
- ML20153F756 + (07:29:27, 11 December 2024)
- ML20153F755 + (07:29:28, 11 December 2024)
- RBG-44624, Provides Notification of RBS Plans to Install Mod Which Replaces Existing Emergency Response Info Sys (Eris) Computer Sys with New Substantially Improved state-of-art Computer Sys + (07:29:28, 11 December 2024)
- ML20153F750 + (07:29:29, 11 December 2024)
- ML20153F748 + (07:29:33, 11 December 2024)
- 05000458/LER-1986-007, :on 860115,automatic Reactor Scram Occurred on High Water Level While Attempting to Line Up Feedwater Train B.Caused by Feedwater B Regulator Valve Open W/Controller Indicating Zero Demand + (07:29:38, 11 December 2024)
- ML20153F745 + (07:29:39, 11 December 2024)
- ML20153F746 + (07:29:39, 11 December 2024)
- ML20153F744 + (07:29:40, 11 December 2024)
- ML20153F743 + (07:29:41, 11 December 2024)
- 05000341/LER-1988-029, :on 880802,24 Hydraulic Control Unit Scram Inlet & Oulet Valves Opened Due to Deenergization of Associated Stated Valves.Caused by Improper Termination of Cable.Reactor Protection Sys Logic Reset + (07:29:44, 11 December 2024)
- L-98-188, Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure + (07:29:45, 11 December 2024)
- ML20153F739 + (07:29:46, 11 December 2024)
- CY-98-151, Responds to NRC Re Violations Noted in Insp Rept 50-213/98-03.Corrective Actions:Root Cause Team Has Determined That Shift Managers Initial Reportability Decision Was Not Correct + (07:29:49, 11 December 2024)
- ML20153F735 + (07:29:50, 11 December 2024)
- ML20153F734 + (07:29:51, 11 December 2024)
- ML20153F731 + (07:29:52, 11 December 2024)
- ML20153F728 + (07:29:54, 11 December 2024)
- ML20153F729 + (07:29:54, 11 December 2024)
- ML20153F727 + (07:29:55, 11 December 2024)
- ML20153F723 + (07:29:56, 11 December 2024)
- ML20153F722 + (07:29:57, 11 December 2024)
- ML20153F717 + (07:29:58, 11 December 2024)
- B17455, Provides Notification of Completion of Eligibility Requirements for TR Berger & Ms Noniewicz,Per 10CFR55.31 for Operator License.Summary of Reactivity Manipulations for Subject Individuals,Encl + (07:29:59, 11 December 2024)
- ML20153F716 + (07:29:59, 11 December 2024)
- ML20153F714 + (07:30:00, 11 December 2024)
- ML20153F713 + (07:30:01, 11 December 2024)
- ML20153F710 + (07:30:02, 11 December 2024)
- IR 05000416/1988016 + (07:30:03, 11 December 2024)
- ML20153F708 + (07:30:03, 11 December 2024)
- ML20153F704 + (07:30:04, 11 December 2024)
- ML20153F703 + (07:30:05, 11 December 2024)
- ML20153F701 + (07:30:05, 11 December 2024)
- ML20153F700 + (07:30:06, 11 December 2024)
- ML20153F697 + (07:30:07, 11 December 2024)
- NRC-88-3368, Forwards Proprietary & Nonproprietary Versions of Amend 3 to Wapwr RESAR-SP/90 Pda Module 3, Introduction & Site. Proprietary Version Withheld (Ref 10CFR2.790) + (07:30:08, 11 December 2024)
- IR 05000445/1988012 + (07:30:09, 11 December 2024)
- ML20153F691 + (07:30:09, 11 December 2024)
- ML20153F687 + (07:30:10, 11 December 2024)
- 05000454/LER-1986-003-01, :on 860129,reactor Trip & Auxiliary Feedwater Actuation Occurred.Caused by Grounded Conditions on Positive & Negative Poles of 125 Volt Dc Bus.Reservoir Mods & Updates to Filling Procedures Planned + (07:30:12, 11 December 2024)
- ML20153F685 + (07:30:13, 11 December 2024)
- ML20153F684 + (07:30:14, 11 December 2024)
- 05000374/LER-1985-032-01, :on 850524,potential Problem Identified Re Location of Sensors Designated as Monitoring Cool Air Entering RHR Rooms & on 850701,Div I & II Leak Detection Isolation Sys Rendered Inoperable + (07:30:16, 11 December 2024)
- ML20153F681 + (07:30:17, 11 December 2024)
- ML20153F682 + (07:30:17, 11 December 2024)
- 05000529/LER-1986-003, :on 860122,logarithmic Power Level Channel Check Not Completed During Surveillance Test.Caused by Operator Error.Personnel Counseled on Following Procedures. Technical Advisors Now Reviewing Tests + (07:30:19, 11 December 2024)
- 05000296/LER-1986-003-01, :on 860123,during Performance of Reactor Bldg Ventilation Radiation Monitor Calibr Surveillance Instruction,Inadvertent Containment Isolation Occurred. Caused by Personnel Error.Personnel Counseled + (07:30:24, 11 December 2024)
- ML20153F676 + (07:30:25, 11 December 2024)