Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- SVP-98-328, Summary Rept of Changes,Tests & Experiments Completed, Including SEs Covering Period of 971001-980715,per 10CFR50.59 & 10CFR50.71(e).With + (03:01:46, 11 December 2024)
- ML20155D079 + (03:01:47, 11 December 2024)
- 05000333/LER-1998-011, :on 980929,failure to Meet Drywell Continuous Atmosphere Monitoring Sys TS Surveillance Test Requirements Were Noted.Caused by Deficient Tp.Declared Both Channels of CAM Sys Inoperable.With + (03:01:54, 11 December 2024)
- ML20155D073 + (03:01:56, 11 December 2024)
- 05000374/LER-1985-032, :on 850524,discovered That Delta Temp Leak Detection for Divs 1 & 2 of RHR Rooms Improperly Designed. Caused by Failure of Engineers to Reflect Unit 1 Changes in Unit 2 Design.Sensors Relocated + (03:01:58, 11 December 2024)
- 05000341/LER-1988-020, :on 880508,incorrect HPCI Surveillance Test Procedure Performed Causing Reactor Scram.Procedure Intended to Be Performed in Cold Shutdown or Refueling Condition. Procedure 24.202.04 Revised + (03:02:00, 11 December 2024)
- ML20155D067 + (03:02:02, 11 December 2024)
- ML20155D063 + (03:02:03, 11 December 2024)
- ML20155D062 + (03:02:03, 11 December 2024)
- ML20155D060 + (03:02:04, 11 December 2024)
- ML20155D059 + (03:02:05, 11 December 2024)
- ML20155D054 + (03:02:09, 11 December 2024)
- ML20155D055 + (03:02:09, 11 December 2024)
- ML20155D052 + (03:02:10, 11 December 2024)
- ML20155D051 + (03:02:11, 11 December 2024)
- 05000352/LER-1988-017, :on 880509,reactor Encl Isolation & Nssss Group VI a & B Isolations Occurred.Caused by Component Failure. Instrument Air Supply to SV-76-144A Closed Following Second Reactor Encl Isolation + (03:02:17, 11 December 2024)
- ML20155D049 + (03:02:18, 11 December 2024)
- ML20155D048 + (03:02:19, 11 December 2024)
- ML20155D045 + (03:02:20, 11 December 2024)
- ML20155D044 + (03:02:20, 11 December 2024)
- IR 05000285/1998017 + (03:02:21, 11 December 2024)
- ML20155D042 + (03:02:22, 11 December 2024)
- JPN-88-027, Proposed Tech Spec 3.11.B.1,clarifying Term Compartment & Eliminating Conflict Between Tech Specs 3.11.B.1 & 4.11.B.1 Re Crescent Area Ventilation Operability & Surveillance Testing.Util Safety Evaluation of Proposed Change Encl + (03:02:23, 11 December 2024)
- ML20155D041 + (03:02:23, 11 December 2024)
- ML20155D036 + (03:02:24, 11 December 2024)
- ML20155D035 + (03:02:25, 11 December 2024)
- ML20155D032 + (03:02:26, 11 December 2024)
- ML20155D031 + (03:02:26, 11 December 2024)
- ML20155D030 + (03:02:27, 11 December 2024)
- ML20155D026 + (03:02:28, 11 December 2024)
- ML20155D024 + (03:02:28, 11 December 2024)
- ML20155D022 + (03:02:29, 11 December 2024)
- ML20155D020 + (03:02:30, 11 December 2024)
- ML20155D021 + (03:02:30, 11 December 2024)
- ML20155D019 + (03:02:31, 11 December 2024)
- ML20155D018 + (03:02:32, 11 December 2024)
- ML20155D017 + (03:02:32, 11 December 2024)
- ML20155D015 + (03:02:33, 11 December 2024)
- ML20155D013 + (03:02:34, 11 December 2024)
- ML20155D012 + (03:02:34, 11 December 2024)
- ML20155D010 + (03:02:35, 11 December 2024)
- ML20155D009 + (03:02:36, 11 December 2024)
- IR 05000498/1988011 + (03:03:17, 11 December 2024)
- ST-HL-AE-1647, Deficiency Rept Re Bottom Mounted in-core Instrument Tubes. QC Site Supervisor Reinstructed All Inspectors to Perform Insps Using Only Currently Approved Engineering Design Documents + (03:03:18, 11 December 2024)
- ML20155D004 + (03:03:18, 11 December 2024)
- ML20155D002 + (03:03:19, 11 December 2024)
- ML20155D001 + (03:03:20, 11 December 2024)
- ML20155C999 + (03:03:20, 11 December 2024)
- ML20155C998 + (03:03:25, 11 December 2024)
- IR 05000458/1998013 + (03:03:28, 11 December 2024)
- ML20155C990 + (03:03:29, 11 December 2024)
- ML20155C987 + (03:03:29, 11 December 2024)