Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20195D492 + (00:11:34, 11 December 2024)
- ML20195D489 + (00:11:35, 11 December 2024)
- ML20195D483 + (00:11:38, 11 December 2024)
- PNO-IV-98-053, on 981114,moisture Density Gauge Stolen from Vehicle Parked at Residence in Chandler,Az.Gauge Was Model 3411B Troxler Moisture/Density Gauge Which Was Temporarily Stored in Bed of Truck at Licensee Employee Residence + (00:11:38, 11 December 2024)
- NPL-99-0319, Provides Main Control Board Wiring Separation Project Status Update Rept for Pbnps,Units 1 & 2 + (00:11:39, 11 December 2024)
- L-98-209, Submits Initial Response to GL 98-02, Loss of Rc Inventory & Associated Potential for Loss of Emergency Mitigation Functions While in Shutdown Condition. Util Determined That Units 1 & 2 Are Not Susceptible to Subject GL Event + (00:11:40, 11 December 2024)
- ML20195D479 + (00:11:40, 11 December 2024)
- ML20195D477 + (00:11:41, 11 December 2024)
- ML20195D478 + (00:11:41, 11 December 2024)
- ML20195D476 + (00:11:42, 11 December 2024)
- ML20195D472 + (00:11:43, 11 December 2024)
- ML20195D474 + (00:11:43, 11 December 2024)
- BVY-98-158, Submits Clarification & Correction to NRC SER for GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power- Operated Gate Valves + (00:11:45, 11 December 2024)
- IR 05000344/1988036 + (00:11:45, 11 December 2024)
- ML20195D468 + (00:11:46, 11 December 2024)
- 05000498/LER-1988-034, :on 880517,discovered That Preoperational Test Procedures Did Not Include Test for One ESF Sequencer Actuations of Containment Spray Pumps.Caused by Procedural Inadequacy Due to Uniqueness of Signals + (00:11:48, 11 December 2024)
- ML20195D465 + (00:12:24, 11 December 2024)
- PNO-IV-88-051, failure of Westinghouse DS-416 Electrical Breakers.Failures Could Be Generic Problem.Westinghouse Representatives on Site Observing Testing,Insp & Installation of Subj Breakers + (00:12:25, 11 December 2024)
- ML20195D463 + (00:12:26, 11 December 2024)
- ML20195D462 + (00:12:26, 11 December 2024)
- ML20195D461 + (00:12:27, 11 December 2024)
- ML20195D460 + (00:12:27, 11 December 2024)
- 0CAN119808, Monthly Operating Repts for Oct 1998 for Ano,Units 1 & 2. with + (00:12:29, 11 December 2024)
- ML20195D458 + (00:12:29, 11 December 2024)
- ML20195D455 + (00:12:30, 11 December 2024)
- ML20195D454 + (00:12:31, 11 December 2024)
- IR 05000334/1988034 + (00:12:55, 11 December 2024)
- ML20195D451 + (00:12:55, 11 December 2024)
- ML20195D450 + (00:12:56, 11 December 2024)
- ML20195D449 + (00:12:56, 11 December 2024)
- ML20195D447 + (00:12:57, 11 December 2024)
- ML20195D444 + (00:12:58, 11 December 2024)
- ML20195D445 + (00:12:58, 11 December 2024)
- ML20195D443 + (00:12:59, 11 December 2024)
- ML20195D442 + (00:13:01, 11 December 2024)
- ML20195D439 + (00:13:02, 11 December 2024)
- ML20195D440 + (00:13:02, 11 December 2024)
- ML20195D437 + (00:13:03, 11 December 2024)
- L-99-086, Forwards Bvps,Unit 2 SG Exam Rept for Aug 1998.Rept Provided to Document Results of SG Eddy Current Exams Performed in Aug 1998.Summary of Insps Provided in Encl 1 + (00:13:04, 11 December 2024)
- ML20195D435 + (00:13:04, 11 December 2024)
- ML20195D431 + (00:13:05, 11 December 2024)
- ML20195D428 + (00:13:06, 11 December 2024)
- ML20195D429 + (00:13:06, 11 December 2024)
- ML20195D427 + (00:13:08, 11 December 2024)
- IR 05000344/1988034 + (00:13:09, 11 December 2024)
- ML20195D425 + (00:13:10, 11 December 2024)
- ML20195D422 + (00:13:11, 11 December 2024)
- ML20195D419 + (00:13:12, 11 December 2024)
- ML20195D416 + (00:13:13, 11 December 2024)
- ML20195D417 + (00:13:13, 11 December 2024)
- ML20195D414 + (00:13:14, 11 December 2024)