Forwards Performance Appraisal Team/Safety Sys Functional Insp Rept 50-289/86-03 on 860303-27.Performance of Activities Re Design Changes & Plant Mods Did Not Achieve High Stds.Response within 30 Days Requested
ML20195D443
Person / Time
Site: Crane Constellation icon.png
Issue date: 05/15/1986
From: Taylor J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Hukill H
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20195D446 List:
References
CLI-85-09, CLI-85-9, NUDOCS 8606040209
Download: ML20195D443 (6)


See also: IR 05000289/1986003

Text

',

S

[6

4

UNITED STATES

' 't

NUCLEAR REGULATORY COMMISSION

WASHINGTON, D. C. 20555

.....

Docket No. 50-289

May 15, 1986

GPU Nuclear Corporation

ATTN: Mr. H. D. Hukill

Director, TMI-1

P. O. Box 480

Middletown, Pennsylvania

17057

Gentlemen:

SUBJECT: PERFORMANCE APPRAISAL TEAM (PAT)/ SAFETY SYSTEM FUNCTIONAL

INSPECTION REPORT 50-289/86-03

This letter fonvards the report of the PAT / Safety System Functional Inspection

performed by an NRC team over the period March 3-27, 1986, involving activities

authorized by NRC Operating License Number DPR-50 for the Three Mile Island - -

Unit 1 facility. This inspection was conducted jointly by members of the

Perfonnance Appraisal Section from the Office of Inspection and Enforcement,

-

Region I inspectors, and NRC contractors.

At the conclusion of the inspection,

the findings were discussed at an exit meeting with those members of your staff

identified in the appendix to the enclosed inspection report.

The NRC inspection at TMI-1 was conducted in response to Comission Memorandum

and Order CLI-85-09.

In the Memorandum and Order the Commission directed the

staff, in part, to perform a Performance Appraisal Team (PAT) inspection at the

end of six months of operation of THI-1.

As a means of implementing this direc-

tive from the Comission, the inspection team performed an assessment of the

operational readiness and functionality of the TMI-1 emergency feedwater (EFW)

system. Particular attention was directed to the details of modification and

design control, quality of maintenance and testing, and the adequacy of procedural

and training support applicable to the EFW system. Although the primary focus

of this inspection was on the EFW system, the inspection team also assessed the

operational readiness of systems that support the EFW system, such as the

250 Vdc station batteries, the two-hour backup supply air system, and the

integrated control system (ICS).

The report includes findings that may result in enforcement action, which would

be the subject of subsequent correspondence. The report also addresses other

observations and conclusions made by the inspection team.

Section II of the

report is a summary of the more significant findings that affect the operational

readiness of the selected safety systems.

Although many strengths were identified by the team during the course of the

TMI-1 inspection, the primary emphasis of the enclosed inspection report is on

the weaknesses identified.

This emphasis is intended to provide you with a

clearer sense of where additional management attention and involvement may be

appropriate.

In general, the NRC inspection team noted strong performance

at TMI-1 in the areas of training, quality assurance, maintenance, and

B606040209 860515

PDR

ADOCK 05000289

G

PDR

'

,

<

.

,

y-

.

GPU Nuclear Corporation

-2-

May 15, 1986

-

e

'

~

opera tions .

The team observed, however, that the performance of activities

related to design changes',and plant modifications did not achieve the high

standards attained in the other areas inspected. Of particular concern was

that the two-hour backup supply air systen that supplies the pneumatically

operated EFW flow control va.lves did not meet the single failure criteria

(observation III. A.l.a.) and the lack of independence between the EFW remote

shutdown panel and control ro~om circuits (observation III.A. 2.b.).

We request

that you respond to this office within 30 days describing the actions you have

taken and intend to take to' improve the overall performance of activities

related to design changes and plant modifications. As part of this response,

please address the corrective actions taken that relate to the two specific

concerns identified above. ,

'

.

While planning corrective actions based on the weaknesses identified in the

enclosed report, it is important that you realize that the focus of this

inspection was primarily on the emergency icedwater system at THI-1. Therefore,

consideration should be given to identifying and correcting similar problems in

other safety-related and isportant-to-safety systems.

<

-

.,

Should you have any questions concerning this inspection, we would be pleased

to discuss them with'you.

Sincerely.

-

-

Original Signed By:

Jaines M. Tay!or .

.

.

James M. Taylor, Director

Office of Inspection and Enforcement

Enclosure:

'

Inspection Report 50-289/86-03

cc w/ enclosure:

~

-

,

See next page

'

l

,

I

m -

s

l

  • For previous concurrences

-

'see' attached ORC

'

0FC :IE:DI:0RP8 :IE

I filRP8 :IE:0I:DD

IE:DI:D g :IE: D
IE:

.

_____:.___________:____________:-___________:_______g___:___V

_ _ _____:___

___:___________

NAME :*LJCallan:cb:*PFMcKee

. :RLSpessard :*JGPartick :*RH

mer :J a o

'

c

____f ____:___________

_____:____________:____________:____________:____________:___ ________:

D_ ATE :5/05/86

5/05/86
4/ /96
05/BtGB6
05/06/86
05/ h/86

i

9

.

_

..

.- --

. . .

.

a.

. . - - - . . .

. . _ .

-_. ._.-. __

. -

-

.

- - -

O

.

o.

GPU Nuclear Corporation

-3

May 15,1986

cc w/ enclosure:

Mr. R. J. Toole

Mr. Richard Conte

O&M Director, THI-1

Senior Resident Inspector (TMI-1)

GPU Nuclear Corporation

U.S.N.R.C.

Middletown, Pennsylvania 17057

P.O. Box 311

Middletown, Pennsylvania 17057

Mr. Richard J. McGoey

Manager, PWR Licensing

Michael F. McBride, Esquire

GPU Nuclear Corporation

LeBouef, Lamb, Leiby & MacRae

100 Interpace Parkway

1333 New Hampshire Avenue, N.W.

Parsippany, New Jersey 70754

Suite 1100

Washington, D.C.

20036

Mr. C. W. Smyth

TMI-1 Licensing Manager

Mr. Robert B. Borsum

GPU Nuclear Corporation

Babcock & Wilcox

P. O. Box 480

Nuclear Power Generation Division

Middletown, Pennsylvania 17057

Suite 220, 7910 Woodmont Avenue

Bethesda, Maryland 20814

G. F. Trowb-idge, Esq.

Shaw, Pittman, Potts & Trowbridge

Governor's Office of State Plannihg

1800 N Street, N.W.

and Development

.

Washington, D.C.

20036

ATTN:

Coordinator, Pennsylvania

State Clearinghouse

Ivan W. Smith, Esq. , Chai rman

P. O. Box 1323

Atomic Safety and Licensing Board

Harrisburg, Pennsylvania 17120

U.S. Nuclear Regulatory Commission

Washington, D.C.

20555

Mr. Larry Hochendoner

Dauphin County Commissioner

Sheldon J. Wolfe, Esq., Chairman

Dauphin County Courthouse

Atomic Safety and Licensing Board

Front and Market Streets

U.S. Nuclear Regulatory Commission

Harrisburg, Pennsylvania

17101

Washington, D.C.

20555

Dauphin County Office of Emergency

Mr. Gustave A. Linenbarger, Jr.

Preparedness

Atomic Safety and Licensing Board

Court House, Room 7

U.S. Nuclear Regulatory Commission

Front and Market Streets

Washington, D.C.

20555

Harrisburg, Pennsylvania 17101

Dr. James Lamb, III

Mr. David D. Maxwell, Chairman

Administrative Judge

Board of Supervisors

313 Woodhaven Road

Londonderry Township

Chapel Hill, North Carolina 17514

FRD#1 'Geyers Church Road

Middletown, Pennsylvania 17057

Mr. David Hetrick

Administrative Judge

Mr. Thomas M. Gerusky, Director

Professor of Nuclear Energy

Bureau of Radiation Protection

University of Arizona

Pennsylvania Department of

Tucson, Arizona 85721

Environmental Resources

P. O. Box 2063

Harrisburg, Pennsylvania 17120

.

.__.

.

-

>

GPU Nuclear Corporation

-4-

May 15,1986

. .

cc w/ enclosure:

Thomas Y. Au, Esq.

Sen. Allen R. Carter, Chairman

Office of Chief Counsel

Joint Legislative Committee on Energy

Department of Environmental Resources

P. O. Box 142

505 Executive House

Suite 513

P. 0. Box 2357

Senate Gressette Building

Harrisburg, Pennsylvania 17120

Columbia, South Carolina 29202

Mr. Bob Stein, Director of Research

Ms. Frieda Berryhill, Chairman

Committee on Energy

Coalition for Nuclear Power Plant

P. O. Box 11867

Postponement

104 Blatt Building

2610 Grendon Drive

Columbia, South Carolina 29211

Wilmington, Delaware 19808

Ms. Jane Lee

William S. Jordan, III, Esq.

183 Valley Road

Harmon, Weiss & Jordan

Etters, Pennsylvania

17319

20001 S Street, N.W.

Suite 430

Ms. Marjorie M. Aamodt

Washington, D.C.

20009

Mr. Norman Aamodt

.

200 North Church Street

Lynne Bernabei, Esq.

Parkesburg,. Pennsylvania 19365

Government Accountability Project

1555 Connecticut Ave., N.W.

Ms. Louise Bradford

Washington, D.C.

20009

TMIA

315 Pef fer Street

Michael W. Maupin, Esq.

Harrisburg, Pennsylvania 17102

Hunton & Williams

707 East Main Street

Mr. Marvin I. Lewis

P. O. Box 1535

6504 Bradford Terrace

Richmond Virginia 23212

Philadelphia, Pennsylvania

19149

Jordan D. Cunningham, Esq.

Mr. Chauncey Kepford

Fox, Farr and Cunningham

Ms. Judith H. Johnsrud

2320 North 2nd Street

Environmental Coalition on Nuclear Power

Harrisburg, Pennsylvania

17110

433 Orlando Avenue

State College, Pennsylvania 16801

Ms. Ellyn R. Weiss

Harmon, Weiss & Jordan

Mr. Donald E. Hossler

2001 S Street, N.W.

501 Vine Street

Suite 430

Middletown, Pennsylvania 17057

Washington, D.C.

20009

'

Mr. Ad Crable

Docketing and Service Section

Lancaster New Era

Office of the Secretary

8 West King Street

U.S. Nuclear Regulatcry Commission

Lancaster, Pennsylvania 17602

Washington, D.C.

20555

l

l

.-

.

_

. ._ -

-

.

,

o

GPU Nuclear Corporation

-5-

May 15, 1986

,

,

cc w/ enclosure:

Ms. Joanne Doroshaw

1324 N. Capitol Street

Washington, D.C.

20002

Atomic Safety & Licensing Board Panel

,

'

U.S. Nuclear Regulatory Commission

i

Washington, D.C.

20555

Atomic Safety & Licensing Appeal

Board Panel (8)

U.S. Nuclear Regulatory Commission

Washington, D.C.

20555

'

,

F

'

9

,

T

6

e

i

,

!

!

!

,_

, ~ . - .

,

_

. _ . ,

_ _ _ . .

_. _ . _ -.

.

.

_

.

, . -, . . . .

%_

,

.,

.

GPU Nuclear Corporation

- 6-

May 15,1986

DISTRIBUTION:

FCTiTacketNo. 50-289/86-03)

NRC~.?id a

LPDR

ORPB reading

DI reading

VStello, EDO

HRDenton, NRR

FMiraglia, NRR

JStolz, NRR

JToma, NRR

CHeltenes, AE0D

JMTaylor, IE

RHVollmer, IE

JGPartlow, IE

RLSpessard, IE

BKGrimes, IE

,

JAxelrad, IE

Regional Administrators

RStarostecki, Region I

SEbneter, Region I

WKane, Region I

RBlough, Region I

FYoung, Region I

NSCI

'NTIS

INPO

ELJordan

OELD

NMSS

RES

ACRS (10)

Regional Division Directors

SECY

OPE

OCA (3)

PAT Team Members

Resident Inspector

RHartfield

All Licensees (Distribution 1S)

.

-

- -

-