ML20195D465

From kanterella
Jump to navigation Jump to search
Mod 9 to Contract NRC-26-96-261
ML20195D465
Person / Time
Issue date: 11/13/1998
From: Mearse S
NRC OFFICE OF ADMINISTRATION (ADM), SONALYSTS, INC.
To:
References
CON-FIN-E-8293, CON-NRC-26-96-261 NUDOCS 9811180062
Download: ML20195D465 (3)


Text

%_

_ _. ~

- ~ _

  • p l

r l

b Q)

' ' ' * * " ^ * " * '

AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT 73

^

I

2. AMENOMENTMO0eFICATION NO.
3. EFFECTIVE DATE
4. REQUISITION /PURCHAsf REQ. NO.
s. PROJECT NO. Of apphcable) 0009 See Block 16c See Block 14

.. lssum.T

,,,, L uDM-m-D.T of..or..n oem.,

U.S. Nuclear Regulatory Connission Division of Contracts and Property Met.

Attn: T712 contract Nr ;

..t Branch 3 Washington DC 20555

s. NAME ANO ADoREss OF CONTRACTOR INo street. county, state and alp Code)

(X) sA. AMENOMENT OF souC!TATION NO.

l Sonalysts, Inc.

98. DATED fsEE ITEM H)

Attn: Laverla Sanders 215 ParkNay North Wet:rford CT 06385 10A. MODlHCAMN OF CONMACT/ ORDER Na Cord NRC 26- % 261 108. DATED (SEE ITEM 13)

Coof lFACiuTv COof X

08-28-1996

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS I

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, Cis not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(1 By completing items 8 and 16, and retuming copies of the amendment: (b) By acknowledging receipt of this amendment of each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR AC-KNOWLEDGMENT TO BE RECEIVED AT THE PLACE OESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY LESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made i

. by telegram or letter, provided each telegram or letter makes reference to the solicrtation and this amendment, and is received prior to the opening hout and dato sDecified.

13. ACCoVNTINo AND APPROPNATION DATA Of required)

B&R8 982-15 107-105 Job Code: E8293 80Ct 252A APPN# 31x0200.982 A_=~_nt obt inated: 160.000.00

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS, IT MODIFIES THE CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14.

00 A. THis CHANGE ORDER is issued PURSUANT TO: (Specify authonty) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO IN rTIM 10A.

8. THE ASOYE NUM0ERED CONTRACT / ORDER is MODIRED TO REFLECT THE ADMMSTRATIVE CHANGES tauch as chanees in pav6ng office, appropnation date, etcJ SET FORTH IN ITEM 14. PURSUANT TO THE AUTHORTY OF FAR 43.103M.

C. T)#s sVPPLEMENrAL AOREEMENT is ENTERED INTO PURSUANT TO AUTHONTY OF:

D.OTHER (Specsfy type of modehcapon amt authonty) Unl[ggggg(. g(gggetjon 8.4, Consideration 8 Obt f getion X

FAR 52.243 1, Changes NRCAR 2052.215 70, Key Personnel E. IMPORTANT: Contractor x is not, []is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENOMENTMOOtFICATION forgansred by UCF sect on head.ngs, including solic6tacon/ contract subsect matter erhere f assible.)

RFPA# AED-96-261, dated 9/17/98 - Rec 8d DCPM 9/18/98 RFPAf AED %261, dated 10/7/98 - Rec'd DCPM 10/16/98 Admin. RFPA# AED W262, dated 11/04/98 6 03g r

f SEE THE ATTACHED PAGES n n*

9811100062 981113 PDR CONTR NRC-26-96-261 PDR a

Except as prouded herein, au terms and condsoons of the document referenced m item sA or toA. as heretofore changed, remaens unchanged and in full force and eHect.

16A. NAME AND TITLt OF slONER (Type or pnnt) isA. NAME AND TITLE OF CONTRACT 1No OFFICER (Type or pnnt)

{

heron D. Mearse, Contracting 158. C0f(TRACTOR / OFFEROR ISC. DATE SIGNED 1se.

EO sTA Es OF AMERICA isC DATE slGNED rk

} r_ )

b \\3\\9d-

<se.~e of -.o-ed to n>

is..natu,e o, Cont, acon On.ce,,

1' sTANDAR)FOled 3o (REV.1o 831

e d

NRC-26-96-261 Modification No. 9 Page 2 of 3 The purpose of this modification is to:

1.

obligate FY 99 funds in the amount of $60,000.00, thereby increasing the obligated amount of the subject contract from $522,976.00 to $582,976.00.

2.

revise the Statement of Work to allow for presentation of the Power Plant Engineering Course to NRC staff located in Rockville, Maryland without increasing the firm-fixed price of the course presentation in accordance with Federal Acauisition Clause 52.243-1.

Channes-Fixed Price-Alternate 111 and, Sonalysts Inc., letter dated, October 20,1998, which is made a part hereof. Course scheduling shall be accomplished in accordance with Subsection G.2, Ordering Procedures and Subsection 1.3 Ordering, of the contract.

3.

provide for a key personnel change in accordance with Subsection H.2 - NRCAR 2052.215 Key Personnel of the subject contract. The change is hereby incorporated under this contract as proposed by Sonalysts, Inc., in their letter dated, April 8,1998, which is made a part hereof.

Accordingly, the contract is hereby modified as follows:

(1)

Under Subsection B.4, Consideration and Obligation - Delivery Orders (JUN 1988)

Paragraph b is deleted in its entirety and the following is substituted in lieu thereof:

"(b)

The amount presently obligated with respect to this contract is $582,976.00. The Contracting Officer may issue orders for work up to the amount presently obligated. This obligated amount may be unilaterally increased from time to time by the Contracting Officer by written modification to this contract. The obligated amount shall, at no time, exceed the contract ceiling as specified in paragraph a above. When and if the amount (s) paid and payable to the Contractor hereunder shall equal the obligated amount, the Contractor shall not be obligated to continue performance of the work unless and until the Contracting Officer shall increase the amount obligated with respect to this contract. Any work undertaken by the Contractor in excess of the obligated amount specified above is done so at the Contractor's sole risk."

(2)

Under Subsection C.3.1a, entitled, " Power Plant Engineering Course," the third paragraph is deleted in its entirety and the following is substituted in lieu thereof:

" Course Information:

Course Length:

Three weeks Class size:

12 to 24 students Instructors:

Two per week

y.

1 NRC-26-96-261 Modification No, 9 s

Page 3 of 3 i

l Number of Exams:

Three l-

. Student Manual:

Student Pre-Study Manual; Student Manual Provided by NRC Instructor Manual:

Lesson plans Provided by NRC L

Teaching Aids:

Provided by NRC

- Location:

Chattanooga, TN or Rockville, MD l

~

Available and current Test Bank:

End of Course Report:

In accordance with Paragraph C,9.2

. Travel:

To Chattanooga..TN or Rockville, MD for course presentation See Attachment 4 to Section J for a course topical outline."

' (3)

Under Subsection H.2, NRCAR 2052.215 Key Personnel (JAN 1993) Paragraph a is 2

deleted in its entirety and the following is substituted in lieu thereof:

"(a)

The following individuals are considered to be essential to the successful performance of the work hereunder:

L

1. Eugene Livingston
Gary D. Weale p

l-The contractor agrees that personnel may not be removed from the contract work or replaced without compliance with paragraphs (b) and (c) of this section."

A summary of obligations for this contract, from date of award through the date of this action is i-L provided below:

l LTotal FY 96 Obligations ----


$160,012.00

--- $252,218.00

~

- Total FY 97 Obligations -


$110,746.00 Total FY 98 Obligations --

Total FY 99 Obligations ------------- $ 60,000.00

. Cumulative Total of NRC. Obligations: $582,976.00

- This modification obligates FY 99 funds in the amount of $60,000,00, All other terms and conditions under this contract, including the ceiling amount of $825,314.00.

7i' remains unchanged.

I' i

-. -