Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20195E423 + (23:55:14, 10 December 2024)
- ML20195E424 + (23:55:14, 10 December 2024)
- ML20195E421 + (23:55:15, 10 December 2024)
- ML20195E420 + (23:55:15, 10 December 2024)
- ML20195E419 + (23:55:16, 10 December 2024)
- RBG-23790, Forwards Summary Description of Change to Initial Test Program (ST-25B) & Summary of Safety Evaluation for Change + (23:55:17, 10 December 2024)
- ML20195E416 + (23:55:17, 10 December 2024)
- NOC-AE-000471, Application for Amends to Licenses NPF-76 & NPF-80, Relocating cycle-specific RCS-related TS Parameter Limits to COLR + (23:55:18, 10 December 2024)
- ML20195E411 + (23:55:19, 10 December 2024)
- IR 05000186/1988002 + (23:55:21, 10 December 2024)
- ML20195E406 + (23:55:22, 10 December 2024)
- ML20195E407 + (23:55:22, 10 December 2024)
- NG-98-1901, Responds to GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Construction & Protective Coating Deficiencies & Foreign Matl in Containment + (23:55:26, 10 December 2024)
- ML20195E404 + (23:55:26, 10 December 2024)
- 05000373/LER-1988-008-05, :on 880517,reactor Protection Sys (RPS) Bus B Tripped.Caused by Short to Ground During Jumper Installation RPS Motor Generator Set Restored to Operable Status & Rubber Boots Provided to Cover Free End of + (23:55:28, 10 December 2024)
- ML20195E400 + (23:55:29, 10 December 2024)
- JAFP-98-0365, Submits Response to NRC Request for Addl Info Re Radiological Controls Insp Exit Meeting for Insp Rept 50-333/98-07.No Commitments Made by Util in Ltr + (23:55:30, 10 December 2024)
- ML20195E399 + (23:55:30, 10 December 2024)
- ML20195E397 + (23:55:31, 10 December 2024)
- ML20195E396 + (23:55:32, 10 December 2024)
- ML20195E395 + (23:55:33, 10 December 2024)
- ML20195E393 + (23:55:33, 10 December 2024)
- ML20195E391 + (23:55:34, 10 December 2024)
- ML20195E392 + (23:55:34, 10 December 2024)
- ML20195E390 + (23:55:35, 10 December 2024)
- ML20195E387 + (23:55:36, 10 December 2024)
- SVP-98-345, Forwards Response to NRC 981103 RAI Re Proposed Change to Ts,Increasing Allowable MSIV Leakage from 11.5 Scfh to 30 Scfh Per Valve + (23:55:37, 10 December 2024)
- ML20195E384 + (23:55:38, 10 December 2024)
- ML20195E383 + (23:55:38, 10 December 2024)
- IR 05000321/1988014 + (23:55:44, 10 December 2024)
- ML20195E381 + (23:55:45, 10 December 2024)
- 0CAN088808, Informs That Based on Info Provided,Util Response to Insp Repts 50-313/88-12 & 50-368/88-12 Correctly Determined Not to Be Safeguards Info & That Recall of Response Would Not Be Appropriate + (23:55:46, 10 December 2024)
- ML20195E380 + (23:55:46, 10 December 2024)
- ML20195E378 + (23:55:47, 10 December 2024)
- ML20195E375 + (23:55:48, 10 December 2024)
- ML20195E377 + (23:55:48, 10 December 2024)
- ML20195E370 + (23:55:50, 10 December 2024)
- ML20195E368 + (23:55:51, 10 December 2024)
- ML20195E369 + (23:55:51, 10 December 2024)
- ML20195E366 + (23:55:52, 10 December 2024)
- ML20195E365 + (23:55:53, 10 December 2024)
- ML20195E364 + (23:55:54, 10 December 2024)
- ML20195E361 + (23:55:55, 10 December 2024)
- ML20195E362 + (23:55:55, 10 December 2024)
- ML20195E359 + (23:55:56, 10 December 2024)
- 05000339/LER-1988-004-02, :on 880520,emergency Diesel Generator 2H Determined Inoperable While Emergency Diesel Generator 2J Svc for Preplanned Maint.Caused by Breaker 25H2 Failed to Closing Springs Not Being Charged + (23:55:58, 10 December 2024)
- ML20195E355 + (23:55:59, 10 December 2024)
- ML20195E354 + (23:56:00, 10 December 2024)
- ML20195E353 + (23:56:00, 10 December 2024)
- ML20195E351 + (23:56:01, 10 December 2024)
- ML20195E350 + (23:56:02, 10 December 2024)