Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198B348 + (17:01:05, 10 December 2024)
- ML20198B346 + (17:01:08, 10 December 2024)
- ML20198B343 + (17:01:09, 10 December 2024)
- ML20198B340 + (17:01:10, 10 December 2024)
- ML20198B341 + (17:01:10, 10 December 2024)
- ML20198B339 + (17:01:11, 10 December 2024)
- 05000271/LER-1985-009, :on 851007,scram Signal Received from Manual Scram Circuit While Implementing Design Change.Caused by Lifting Coil Wire on Sensor Relay.Valves Shut.Contaminated Water Cleaned Up.Scram Reset + (17:01:15, 10 December 2024)
- ML20198B337 + (17:01:17, 10 December 2024)
- ML20198B335 + (17:01:18, 10 December 2024)
- ML20198B334 + (17:01:19, 10 December 2024)
- ML20198B333 + (17:01:19, 10 December 2024)
- ML20198B332 + (17:01:20, 10 December 2024)
- 05000255/LER-1985-019, :on 850930,review of Tech Spec Surveillance Test Procedures Identified Deficiency Re Failure to Verify Containment Isolation Initiation Due to Containment High Radiation Signal.Caused by Inadequate Review + (17:01:23, 10 December 2024)
- 05000271/LER-1985-010, :on 851003,insp of Conductors Revealed Contact W/Sharp Edge of End of Electrical Penetration Assembly Sleeve.Edgeguard/Insulating Matl Installed & Addl Insp Planned + (17:01:28, 10 December 2024)
- ML20198B325 + (17:01:29, 10 December 2024)
- ML20198B324 + (17:01:30, 10 December 2024)
- ML20198B320 + (17:01:31, 10 December 2024)
- PLA-4828, Expresses Appreciation for Support Received by Former Project Manager C Poslusny + (17:01:31, 10 December 2024)
- ML20198B319 + (17:01:32, 10 December 2024)
- 05000316/LER-1985-013, :on 850726,frost Accumulation in Excess of Tech Spec Found within Ice Condenser Flow Passages.Caused by Excessive Moisture in Air or Sublimation of Ice.Frost Buildup Removed on 850728 + (17:01:36, 10 December 2024)
- ML20198B314 + (17:01:37, 10 December 2024)
- ML20198B312 + (17:01:37, 10 December 2024)
- ML20198B310 + (17:01:38, 10 December 2024)
- ML20198B309 + (17:01:38, 10 December 2024)
- ML20198B308 + (17:01:39, 10 December 2024)
- ML20198B304 + (17:01:40, 10 December 2024)
- ML20198B303 + (17:01:41, 10 December 2024)
- ML20198B302 + (17:01:41, 10 December 2024)
- ML20198B301 + (17:01:42, 10 December 2024)
- ML20198B299 + (17:01:43, 10 December 2024)
- ML20198B298 + (17:01:43, 10 December 2024)
- ML20198B297 + (17:01:44, 10 December 2024)
- ML20198B293 + (17:01:44, 10 December 2024)
- 05000263/LER-1997-013-01, :on 971125,manual Scram Was Inserted Due to Loss of Condenser Vacuum.Caused by Electrical Fault Tripping.Temporary Cables Were Installed Primarily Above Ground + (17:01:46, 10 December 2024)
- ML20198B291 + (17:01:47, 10 December 2024)
- U-602896, Provides 90-day Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps + (17:01:48, 10 December 2024)
- ML20198B284 + (17:01:49, 10 December 2024)
- ML20198B286 + (17:01:49, 10 December 2024)
- ML20198B283 + (17:01:50, 10 December 2024)
- ML20198B282 + (17:01:51, 10 December 2024)
- ML20198B281 + (17:01:52, 10 December 2024)
- ML20198B278 + (17:01:52, 10 December 2024)
- ML20198B277 + (17:01:53, 10 December 2024)
- ML20198B274 + (17:01:54, 10 December 2024)
- ML20198B275 + (17:01:54, 10 December 2024)
- ML20198B273 + (17:01:55, 10 December 2024)
- ML20198B271 + (17:01:56, 10 December 2024)
- ML20198B272 + (17:01:56, 10 December 2024)
- ML20198B270 + (17:01:57, 10 December 2024)
- 05000267/LER-1985-020, :on 851001,at Less than 1% Power,Reactor Manually Scrammed Due to Primary Coolant Flow Reduction & Condenser Vacuum Loss.Caused by Loss of Auxiliary Boilers Used to Supply Steam.Boilers Returned to Svc + (17:02:02, 10 December 2024)
- JAFP-98-0396, Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with + (17:02:03, 10 December 2024)