Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199A895 + (13:45:48, 10 December 2024)
- BVY-97-151, Requests That 970609 SER Re Exemption from Requirements of 10CFR50,App R,Section Iii.G,To Permit Use of Fireproof Cable in Plant Areas That Require Enclosing Cables in Fire Barrier Having 1-hour Fire Rating,Be Revised to Show Clarificatio + (13:45:49, 10 December 2024)
- ML20199A893 + (13:45:49, 10 December 2024)
- 05000414/LER-1986-012-01, :on 860511,main Feedwater Sys Isolation Occurred.Caused by Main Feedwater Sys Control Bypass Valve Controller Card for Automatic Operation Being Out of Adjustment.Trip Reset.Valves Realigned + (13:45:52, 10 December 2024)
- ML20199A890 + (13:45:53, 10 December 2024)
- ML20199A891 + (13:45:53, 10 December 2024)
- ML20199A887 + (13:45:54, 10 December 2024)
- ML20199A889 + (13:45:54, 10 December 2024)
- ML20199A883 + (13:45:55, 10 December 2024)
- ML20199A885 + (13:45:55, 10 December 2024)
- ML20199A882 + (13:45:56, 10 December 2024)
- ML20199A879 + (13:46:06, 10 December 2024)
- ML20199A880 + (13:46:06, 10 December 2024)
- ML20199A877 + (13:46:07, 10 December 2024)
- NSD-NRC-98-5535, Forwards Revised Response to FSER Open Item 480.1084F Related to Comments on Passive Containment Cooling Sys from Containment Sys Branch Re Rev 3 of AP600 Certified Design Matl,Including ITAAC + (13:46:08, 10 December 2024)
- ML20199A876 + (13:46:08, 10 December 2024)
- ML20199A874 + (13:46:09, 10 December 2024)
- ML20199A872 + (13:46:10, 10 December 2024)
- SVP-98-005, Forwards Response to Violations Noted in Insp Repts 50-254/97-14 & 50-265/97-14.CAs:on 970906,operations Directed Chemistry to Begin Sampling at 4 H Intervals & Implemented Measures to Ensure Hydrogen Grab Sample + (13:46:10, 10 December 2024)
- ML20199A869 + (13:46:11, 10 December 2024)
- ML20199A868 + (13:46:12, 10 December 2024)
- ML20199A864 + (13:46:12, 10 December 2024)
- RBG-44352, Submits Response to Violations Noted in Insp Rept 50-458/97-15 & Payment of $55,000 for Proposed Civil Penalty.Corrective Actions:Condition Rept Generated to Document Event & Root Cause Analysis Team to Investigate + (13:46:13, 10 December 2024)
- ML20199A855 + (13:46:14, 10 December 2024)
- IR 05000346/1997014 + (13:46:15, 10 December 2024)
- ML20199A852 + (13:46:15, 10 December 2024)
- ML20199A849 + (13:46:16, 10 December 2024)
- ML20199A850 + (13:46:16, 10 December 2024)
- ML20199A848 + (13:46:17, 10 December 2024)
- ML20199A847 + (13:46:18, 10 December 2024)
- ML20199A846 + (13:46:18, 10 December 2024)
- ML20199A845 + (13:46:19, 10 December 2024)
- ML20199A844 + (13:46:19, 10 December 2024)
- ML20199A838 + (13:46:20, 10 December 2024)
- ML20199A837 + (13:46:20, 10 December 2024)
- ML20199A836 + (13:46:21, 10 December 2024)
- ML20199A834 + (13:46:22, 10 December 2024)
- ML20199A833 + (13:46:23, 10 December 2024)
- ML20199A832 + (13:46:24, 10 December 2024)
- ML20199A831 + (13:46:25, 10 December 2024)
- ML20199A829 + (13:46:26, 10 December 2024)
- ML20199A827 + (13:46:26, 10 December 2024)
- ML20199A825 + (13:46:27, 10 December 2024)
- ML20199A824 + (13:46:27, 10 December 2024)
- ML20199A823 + (13:46:28, 10 December 2024)
- ML20199A821 + (13:46:29, 10 December 2024)
- ML20199A822 + (13:46:29, 10 December 2024)
- ML20199A817 + (13:46:30, 10 December 2024)
- 05000440/LER-1997-017, :on 970715,HPCS Suppression Pool Water level- High Logic Actuation Occurred.Caused by Incomplete Assessment of Suppression Pool Level Instrumentation Channels.Discussed Event W/Sros Involved + (13:46:33, 10 December 2024)
- ML20199A814 + (13:46:35, 10 December 2024)
- ML20199A815 + (13:46:35, 10 December 2024)
- ML20199A812 + (13:46:36, 10 December 2024)