Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199F432 + (12:46:48, 10 December 2024)
- ML20199F433 + (12:46:48, 10 December 2024)
- ML20199F431 + (12:46:49, 10 December 2024)
- ML20199F429 + (12:46:50, 10 December 2024)
- ML20199F426 + (12:46:51, 10 December 2024)
- ML20199F421 + (12:46:55, 10 December 2024)
- ML20199F423 + (12:46:55, 10 December 2024)
- ML20199F420 + (12:46:56, 10 December 2024)
- 05000412/LER-1997-011-02, On 971229,determined That Inadequate Electrical Isolation in Secondary Process Rack Circuitry Occurred Due to Design Error.Technical Evaluation Rept 1162 Was Developed + (12:46:58, 10 December 2024)
- ML20199F416 + (12:46:59, 10 December 2024)
- ML20199F417 + (12:46:59, 10 December 2024)
- U-600611, Forwards Reactor Containment Bldg Integrated Leakage Rate Test, Final Rept,Per 10CFR50,App J.Schematic Arrangement of Leakage Rate Measurement Sys Included in Rept + (12:47:00, 10 December 2024)
- ML20199F414 + (12:47:01, 10 December 2024)
- ML20199F413 + (12:47:01, 10 December 2024)
- AECM-86-0191, Forwards Addl Info Re Assumptions Used to Evaluate Need for Remotely Operated Isolation Valves on Certain Instrument Lines,Per 860612 Telcon.Valves Unnecessary to Meet Applicable Safety Requirements + (12:47:02, 10 December 2024)
- ML20199F411 + (12:47:03, 10 December 2024)
- ML20199F410 + (12:47:03, 10 December 2024)
- ML20199F408 + (12:47:04, 10 December 2024)
- ML20199F406 + (12:47:05, 10 December 2024)
- ML20199F405 + (12:47:05, 10 December 2024)
- ML20199F404 + (12:47:06, 10 December 2024)
- ML20199F402 + (12:47:07, 10 December 2024)
- ML20199F403 + (12:47:07, 10 December 2024)
- ML20199F400 + (12:47:09, 10 December 2024)
- ML20199F401 + (12:47:09, 10 December 2024)
- NSD-NRC-98-5544, Forwards W Responses to Open Item Oits 5321/Q260.93 Re AP600 SSAR Chapter 14, Initial Test Program, Per 980107 Request + (12:47:10, 10 December 2024)
- IR 05000312/1986012 + (12:47:16, 10 December 2024)
- ML20199F395 + (12:47:17, 10 December 2024)
- HL-5562, Requests That Response to RAI Re Incorporation of SQUG GIP Into Plant FSARs Be Extended to 980430 Due to Resolution Activities Between NRC & SQUG + (12:47:18, 10 December 2024)
- ML20199F393 + (12:47:18, 10 December 2024)
- ML20199F388 + (12:47:24, 10 December 2024)
- SNRC-1257, 1985 Annual Environ Operating Rept + (12:47:24, 10 December 2024)
- ML20199F378 + (12:47:27, 10 December 2024)
- ML20199F379 + (12:47:27, 10 December 2024)
- ML20199F376 + (12:47:31, 10 December 2024)
- ML20199F375 + (12:47:34, 10 December 2024)
- ML20199F373 + (12:47:41, 10 December 2024)
- ML20199F374 + (12:47:41, 10 December 2024)
- ML20199F372 + (12:47:42, 10 December 2024)
- ML20199F370 + (12:47:43, 10 December 2024)
- ML20199F371 + (12:47:43, 10 December 2024)
- ML20199F369 + (12:47:44, 10 December 2024)
- RBG-23350, Special Rept:On 860214,diesel Generator Failed to Pass Surveillance Test.Caused by Improperly Aligned Duplex Fuel Inlet Strainer Valve.Strainer Properly Aligned & Fuel Oil Pressure Restored to Normal Operating Range + (12:47:44, 10 December 2024)
- ML20199F366 + (12:47:49, 10 December 2024)
- ML20199F365 + (12:47:49, 10 December 2024)
- ML20199F364 + (12:47:50, 10 December 2024)
- ML20199F363 + (12:47:56, 10 December 2024)
- ML20199F360 + (12:47:58, 10 December 2024)
- BSEP-99-0002, Submits Corrected Info for Incorporation Into 981030 Rept Required by TS 5.6.6, Post-Accident Monitoring Instrumentation Rept. Correct Date of Failure for Temp Element 2-CAC-TE-1258-22 Should Have Stated 980924 + (12:47:59, 10 December 2024)
- ML20199F356 + (12:48:00, 10 December 2024)
- NSD-NRC-98-5543, Forwards Westinghouse Responses to FSER Open Items on AP600. Summary of Encl Responses Provided in Table 1 + (12:48:01, 10 December 2024)